Property and programme status
Collect the building register, hanok registration or proposed-registration notice, conservation-zone or concentration-area confirmation, and cultural-heritage status.
Combine itemised hanok repair quotations, professional and ancillary costs, contingency, a locally confirmed grant formula, and a confirmed loan to estimate total project cost, owner burden, and construction-period cash needs.
This tool does not create a nationwide cost per area. Enter professionally confirmed quantities, written quotes on one VAT basis, and the eligible cost, rate, and cap confirmed by the competent Korean authority. The example only demonstrates the arithmetic.
Jurisdiction, registration, area, and heritage status provide context and warnings; they never approve eligibility automatically.
Selecting a conservation zone does not apply any discretionary uplift automatically.
Used only to show average monthly cash preparation.
Align professionally confirmed quantities with contractor quote units. Leave unused lines at zero.
Confirmed roof area and matching quoted unit cost
KRW 0
Professionally identified repair locations and quote
KRW 0
Confirmed area and quote for removal, base, and plaster
KRW 0
Window or door count and quote for the same specification
KRW 0
Area and quote aligned to removal and reinstatement scope
KRW 0
Quoted packages for confirmed foundation, wall, or drainage work
KRW 0
Service quote including the confirmed work and reinstatement scope
KRW 0
Other actual repair quote without duplication
KRW 0
Enter non-duplicated payable amounts on the same VAT basis as the repair quotes.
Written quote for hanok design and any design-review work.
Quoted supervision or professional site-management fee.
Confirmed weather protection, temporary works, move, or accommodation cost.
Waste, insurance, or other cost not duplicated elsewhere.
Applied to the full pre-contingency subtotal, from 0% to 30%.
Even the Seoul presets do not approve eligibility. Record the eligible base and status confirmed from the current notice, ordinance, and decision letter.
Enter any confirmed conservation-zone uplift or separate incentive in custom mode.
Enter the amount recognised by the notice or review, not an automatic sum of repair lines.
Zero means no monetary cap in this arithmetic.
Enter only financing whose availability you have checked. Interest and repayments are not calculated.
The Korea Hanok Renovation Cost & Grant Calculator combines itemised repair quotations, professional fees, project expenses, contingency, a locally confirmed grant formula, and a confirmed loan plan.
It is designed for early budgeting before a registered or proposed hanok renovation, not for deciding whether a building qualifies for support.
Enter the roof, timber frame, walls, traditional windows, ondol floor, foundation and drainage, building services, and other repair work separately so that a missing or duplicated item is easier to find.
Hanok work varies too much for one national cost per square metre to be dependable.
Access, traditional material specifications, hidden timber decay, dismantling and reinstatement, heritage review, temporary weather protection, and contractor availability can change the budget even when two buildings have a similar floor area.
A zero entry therefore means that no usable quotation has been entered; it is not a national average supplied by this calculator.
Collect the building register, hanok registration or proposed-registration notice, conservation-zone or concentration-area confirmation, and cultural-heritage status.
Ask each contractor to use matching quantities, specifications, dismantling scope, reinstatement scope, tax basis, exclusions, and quotation validity dates.
Separate design, supervision, committee documents, surveys, permits, temporary protection, relocation, waste, insurance, and other project costs from direct repairs.
Keep the ordinance, annual notice, application form, review decision, recognised-cost schedule, grant cap, payment conditions, and recovery provisions together.
Each repair amount equals its confirmed quantity multiplied by its quoted unit cost.
The eight line amounts are added to obtain direct repair cost.
A genuine lump-sum package may use a quantity of one, but do not hide several overlapping proposals inside one line.
Design, supervision, and permit or survey expenses form professional service cost.
Temporary protection or relocation and other documented project expenses form ancillary project cost.
These amounts remain visible because a support programme may recognise some items but exclude others.
Subtotal before contingency equals direct repairs plus professional services plus ancillary project costs.
Contingency equals that subtotal multiplied by the selected contingency rate.
Total project cost equals subtotal before contingency plus contingency.
The low and high scenarios move the chosen rate by five percentage points, subject to the calculator range, so they are sensitivity cases rather than forecasts.
The Act on Value Enhancement of Hanok and Other Architectural Assets supplies a framework, but it does not create one automatic nationwide cash rate for every hanok owner.
Act Article 24 permits the State or a local government to provide necessary support for preserving and promoting hanok, while Act Article 25 provides for an application and review process.
Enforcement Decree Article 17 leaves the detailed support targets, standards, procedures, and other necessary matters to local ordinance and permits grants or loans within the budget.
This delegation is why the calculator starts with manual local-programme inputs and never applies the Seoul figures nationwide.
The Act definition also matters before budgeting.
A building treated under cultural-heritage law may require a separate repair design, qualified heritage contractor, alteration approval, and support route rather than the ordinary hanok programme workflow.
Selecting a heritage warning in the calculator changes the guidance only; it does not decide legal classification or eligibility.
| Source | Planning meaning | What it does not prove |
|---|---|---|
| Act Article 24 and Article 25 | Provides support authority and an application-and-review structure | A fixed nationwide rate, cap, or personal entitlement |
| Enforcement Decree Article 17 | Confirms that local ordinances define detailed targets and procedures | That the same Seoul assumptions apply outside Seoul |
| Current local ordinance and notice | Supplies the project-specific rate, cap, eligible costs, timing, and evidence | Final payment before review, completion, and any required inspection |
Seoul Ordinance Article 21 is the source of the two narrowly labelled presets available in the calculator.
For an eligible registered hanok receiving a full exterior renovation under the base rule, the displayed estimate is two-thirds of confirmed eligible cost, capped at KRW 60,000,000.
For eligible partial repair under the displayed rule, the estimate is up to the confirmed eligible cost, capped at KRW 20,000,000.
These are planning formulas, not a finding that the selected building, work, or cost is recognised.
| Displayed preset | Rate | Base cap | Required user confirmation |
|---|---|---|---|
| Full exterior renovation | two-thirds | KRW 60,000,000 | Registration, project scope, recognised cost, review, and current rule |
| Partial repair | up to 100% | KRW 20,000,000 | Registration, eligible partial-repair scope, recognised cost, review, and current rule |
Confirmed eligible cost is first limited to total project cost.
The rate-based amount equals that eligible cost multiplied by the selected rate.
Estimated support is the smaller of the rate-based amount and the cap, except that a manual cap of zero means no cap.
When status is approved, the applied grant is also limited by the entered approved amount and cannot exceed project cost.
Net owner burden equals total project cost minus the applied grant.
A confirmed loan is limited to that net burden, and cash required equals net owner burden minus the applied loan.
The monthly figure merely divides cash required by the selected construction months; it is not a contractor draw schedule or a loan repayment calculation.
A loan is not a grant and does not reduce ultimate economic burden because the principal remains repayable.
Seoul loan terms and bank underwriting should be confirmed separately; the calculator uses only the amount the user has already confirmed.
Assume the itemised repair quotations total KRW 150,000,000, design and supervision total KRW 20,000,000, and ancillary project expenses total KRW 7,000,000.
The subtotal before contingency is KRW 177,000,000.
At a 10% contingency rate, contingency is KRW 17,700,000 and total project cost becomes KRW 194,700,000.
If KRW 120,000,000 is confirmed as eligible under the Seoul full exterior base formula, two-thirds is KRW 80,000,000 but the base cap limits the estimated grant to KRW 60,000,000.
Net owner burden is therefore KRW 134,700,000.
If a separate KRW 40,000,000 loan is genuinely confirmed, the construction-period cash requirement shown by the calculator is KRW 94,700,000.
Over six months, the equal-share illustration is about KRW 15,783,333 per month, but an actual payment schedule may be front-loaded or milestone-based.
| Result | Amount | Interpretation |
|---|---|---|
| Total project cost | KRW 194,700,000 | Repair, professional, ancillary, and contingency budget |
| Estimated grant | KRW 60,000,000 | Base formula estimate subject to actual approval |
| Net owner burden | KRW 134,700,000 | Ultimate cost after grant, before loan repayment effects |
| Confirmed loan | KRW 40,000,000 | Financing that remains repayable |
| Cash required | KRW 94,700,000 | Illustrative construction-period liquidity after grant and loan |
Yes. Select the current local programme and enter the eligible cost, rate, and cap confirmed in the competent jurisdiction. The National Hanok Center policy list shows that regional programmes are governed by different ordinances, so do not copy the Seoul numbers.
No. The ordinance allows a possible increase in defined circumstances, but that is not an automatic maximum increase and it does not apply to the displayed partial-repair route. Enter a higher cap only after official confirmation for the project.
Only if the current programme and the competent authority recognise them. Keep those costs in the project budget, but enter only the officially recognised portion in the eligible-cost field.
The calculator prevents inconsistent inputs from producing support above the selected eligible cost, rate, cap, or total project cost. If the decision uses a different legal basis, switch to the manual programme and copy the confirmed terms.
No. It reduces the displayed construction-period cash need, but the principal remains repayable. Net owner burden is shown separately so that financing is not mistaken for support.
The itemised budget can be a rough organising aid, but the ordinary support workflow may not be sufficient. Confirm heritage repair design, contractor qualification, alteration approval, and the applicable support programme with the competent authority.
Do not assume so. The verified Seoul process requires application before work and generally requires work not to begin before the support decision. Confirm the exact sequence locally before paying a deposit, dismantling, or commencing work.
The legal and Seoul assumptions above were checked against current official materials on July 30, 2026.
Recheck them when preparing an application because ordinances, annual budgets, notices, forms, recognised-cost schedules, and administrative interpretations can change independently.
Save the itemised quotation basis, confirm the competent authority and programme, separate eligible from non-eligible cost, and compare contingency scenarios before committing funds.
Then replace every planning assumption with the current notice, written departmental guidance, review decision, contractor schedule, and financing documents for the actual project.