Korea Campground Registration, Pitch Capacity, Safety and Insurance Calculator

Review Korean campground building limits, tent and vehicle pitch capacity, safety equipment and liability policy requirements before committing to construction.

2026 Korea campground design pre-check

Tourism rules effective October 29, 2026; checked November 2, 2026. Replace fictional defaults with surveyed areas, plans and policy values. Results are not registration, fire-safety or insurance approval.

1. Land and registration category

Net camping area excludes roads and communal facilities. Include the area reserved for provided units here; it is deducted once below. Building floor area includes all applicable buildings, not only the office.

Closed-school and seasonal exceptions

All four conditions are required for the conservation-zone area exception. Sewerage, landscaping and slope safeguards still need review.

The numerical exception requires all three conditions, including at most four operating months yearly. The 15/50 m² rules, safety and insurance duties remain; confirm eligibility with the authority.

2. Pitches and provided facilities

Do not count the provided glamping units or trailers again as ordinary tent or vehicle pitches. Reserve their actual area, 3 m gaps and paths. This area does not automatically approve a maximum unit count.

3. Safety equipment and on-site checks

The conservative extinguisher budget takes the larger of the two-tent and 100 m² calculations, then adds provided-unit and ash-area equipment. It is not a certified statutory minimum or layout. The 1,100 W enclosed-tent electrical exception does not allow flames.

4. Liability insurance / mutual coverage

Even adequate top-grade limits require comparison of every grade and the policy wording. Check the KRW 20 million death floor and combined-event terms in Article 18(8). This does not calculate premiums or claim payments.

5. Disposition reference

History uses the disposition date and subsequent detection date, not lifetime occurrences. New-registration refusal differs from post-registration sanctions. Unregistered operation separately carries up to two years of imprisonment or KRW 20 million in fines; both may apply.

Additional forest campground check

Results for entered checks: Needs work

Registration is decided by the authority. Review both numerical compliance and unresolved requirements.

Area / category
Needs work

Safety / operation
Needs work

Insurance
Review required

Building floor-area boundary

300 m² (strictly below)

Reduce by strictly more than 550 m².

Conservation zones also require total area below 10,000 m².

Net camping area allocation

Planned use: 1,800 m²

Excess / remaining: 0 / 1,200 m²

This includes reserved provided-facility area. Shape, slopes and circulation may reduce actual capacity.

Tent-pitch area ceiling

160 pitches

Using entered pitch size: 80

Vehicle-pitch area ceiling

24 pitches

Using entered pitch size: 20

Each ceiling retains the opposite pitch plan and excludes reserved facilities. They are alternatives; do not add them. Confirm the registration category and physical layout separately.

Items requiring work or review

  • WorkCombined building floor area: strictly below the displayed boundary
  • WorkEntered equipment meets the conservative procurement estimate
  • ReviewConfirm extinguisher interpretation, area coverage, placement and ratings with local authorities
  • ReviewConfirm RCD protection and product certification for the enclosed-tent electrical exception
  • ReviewConfirm safe siting, evacuation routes and evacuation plans
  • ReviewConfirm sewerage, toilets, water, power and cooking facilities for the category/exception
  • ReviewConfirm emergency access and vehicle-camp access lane/passing space
  • ReviewConfirm notices, on-site staff, emergency communication, backup power and the full safety/hygiene system
  • ReviewConfirm valid liability insurance or mutual coverage before opening
  • ReviewCheck death, injury, disability and property policy limits
  • ReviewCompare all 14 injury and disability grades in the policy
  • ReviewVerify KRW 20 million death payment when loss is below that amount
  • ReviewVerify Article 18(8) combined-event addition and deduction terms

Conservative equipment procurement estimate

Shared extinguishers 22 + provided units 6 + 1 for ash handling. This is a procurement estimate without overlap credits.

Equipment estimates, entered counts and shortfalls
EquipmentEstimateEnteredShortfall
Extinguishers: shared + units + ash area29029
Standalone smoke alarms606
CO alarms606
Dedicated RCDs606
Torches inside provided units606

Policy top-grade limit comparison

Required policy limits, entered limits and shortfalls by cover
CoverRequiredPolicyShortfall
Death / person₩100,000,000₩0₩100,000,000
Grade 1 injury / person₩20,000,000₩0₩20,000,000
Grade 1 disability / person₩100,000,000₩0₩100,000,000
Property / event₩100,000,000₩0₩100,000,000

See the full grade schedule in the guide below. Differences compare entered limits only; uninsured status, death minimum, combined events, exclusions and scope require separate checks.

Disposition schedule for the selected violation

  1. Correction order ← entered history
  2. 1-month suspension
  3. 2-month suspension
  4. Registration cancellation

No substitute surcharge is calculated for this order/violation.

The authority decides under the statutory public-interest conditions. Paying money is not an automatic alternative to suspension. Mitigation, aggravation, multiple violations and final sanctions require official review.

Revise plans and prepare the application

  • Designer: reconcile building floors, net camping area, exception evidence and 3 m gaps with the layout
  • Tourism authority: business plan, floor/layout plans, facility inventory, ownership/use rights and related permits
  • Electrical pre-use certificate, applicable LPG completion evidence and drinking-water test results when using groundwater or other non-tap sources
  • Arrange coverage and proof before opening; confirm the local submission process

Related calculators

Check campground registration standards before committing to construction

This calculator helps owners planning a Korean campground compare land, building floors, tent and vehicle pitches, safety equipment and liability coverage before paying for design or earthworks.
It covers general and vehicle campground standards under the Tourism Promotion Act, with a separate numerical check for forest campgrounds.
A plan that exceeds the applicable building boundary may require redesign even when the site looks spacious.

Korea-based 2026 rules

The Tourism Promotion Act, Enforcement Decree and Enforcement Rule use the versions effective October 29, 2026, checked November 2, 2026.
The forest decree version is effective July 28, 2026.
Results do not grant registration, development or building permits, fire-safety approval or insurance acceptance.

Land-use zoning, access, sewage arrangements and disaster exposure can change the feasibility of the same plot.
Use the exported checklist with the designer and local tourism authority before confirming construction contracts.
Startup returns, earthwork prices and insurance premiums require separate information and are outside this calculation.

Understand the area inputs and avoid counting space twice

Total and net camping area

Total area is the campground area used in the registration plan.
Net camping area excludes roads and communal facilities that cannot be assigned to pitches.
Entering the entire owned plot as net camping space can overstate capacity.

Combined building floor area

Include applicable buildings such as toilets and showers, not only the management office.
Ask the designer how the statutory floor-area measure applies; do not assume it is identical to another building-area measure.
The tool does not classify glamping structures or caravans as buildings automatically.

Ordinary pitches and provided units

Do not enter the same glamping unit or towable trailer again in the ordinary tent or vehicle pitch counts.
Enter a separate reservation for their footprint, gaps and paths.
Include that reservation in net camping area; the calculation deducts it once.

Confirmed, not met or unknown

Keep unverified site conditions and policy wording as unknown.
The default example and a numeric zero do not confirm actual compliance.
Blank, invalid or inconsistent numeric inputs stop results and report export until corrected.

The 15 m² and 50 m² pitch rules

Annex 1, item 4(c) of the Tourism Enforcement Decree requires at least 15 m² per tent for a general campground and at least 50 m² per vehicle for a vehicle campground.
Vehicle camping space includes parking and adjacent camping equipment.
Mixed is a planning option here, not a third statutory business category.

Allocation and ceiling formulas

  • Planned area = tent count × tent area + vehicle count × vehicle area + reserved provided-facility area.
  • Tent ceiling = floor((net camping area − reserved area − retained vehicle-plan area) ÷ 15).
  • Vehicle ceiling = floor((net camping area − reserved area − retained tent-plan area) ÷ 50).
  • The design-size ceiling uses the larger of the statutory minimum and your entered pitch area as its divisor.

Floor discards the fractional part to retain whole pitches.
If the remaining area is negative, the ceiling becomes zero and excess planned area is shown separately.
The two ceilings describe alternatives on the same land; do not add them together.
Plot shape, slopes, drainage, walking routes and emergency turning space can reduce actual capacity.
The calculator does not derive an approved maximum glamping or caravan count from the 15/50 m² divisions.

Building limits are strictly below the boundary

Campground area and building floor-area boundaries by Korean land-use zone
ApplicationTotal areaCombined building floors
Ordinary applicationOther siting rules remainLess than 10% of total
Conservation management / conservation greenLess than 10,000 m²Less than 300 m² AND less than 10% of total

For an 8,000 m² site, 10% is 800 m².
In a conservation management zone, the simultaneous 300 m² condition makes 300 m² the stricter boundary.
If planned floors total 850 m², reducing them by exactly 550 m² leaves 300 m² and still fails.
The reduction must be strictly more than 550 m².
A conservation-zone site of exactly 10,000 m² also fails that numerical condition.
Comparisons use original values rather than rounded display values, so leave practical design headroom.

Closed-school and seasonal exceptions have different conditions

Qualifying closed-school property

Qualifying closed-school use without increasing the existing site area can engage the ordinary 10% exception.
In conservation zones, the numerical exception additionally requires no new buildings or extensions and no new or widened road to the entrance.
Closed-school status alone does not permit arbitrary building or road works.
The remaining conservation sewerage, landscaping and slope-protection requirements still need review.

Short operation at a beach or amusement park

Annex 1(3) addresses statutory beaches or amusement parks operating for no more than four months yearly without land alteration for registration.
All three conditions are necessary for the numerical exception; ordinary seasonal trading alone is insufficient.
The 15/50 m² pitch rules, emergency access, facility availability, safety, hygiene and liability coverage still require confirmation.

Your checkboxes state assumptions; they do not prove eligibility.
Take evidence of the property, existing area and proposed works to the local tourism authority before relying on the exception in a contract.
The results retain an authority-review item even when the numerical exception is applied.

Extinguishers, alarms, dedicated RCDs and 3 m spacing

Tourism Enforcement Rule Annex 7 says at least one extinguisher per two tent locations or 100 m².
This tool rounds each count upward, takes the larger shared estimate, then adds equipment for provided units and one ash-handling location.
The sum is a conservative purchasing budget without overlap credits, not a certified statutory minimum.
Confirm interpretation, covered area, ratings and placement with the local fire and registration authorities.

Operator-installed facilities provided to guests

  • Each qualifying camping structure or towable trailer needs an extinguisher, standalone smoke alarm, carbon monoxide alarm, dedicated RCD and an emergency torch inside.
  • Provided facilities must be at least 3 m apart; generous unit floor space alone does not establish that gap.
  • Applicable tent materials need flame-retardant performance and an easily escapable entrance.
    Wood and pellet stoves must not be installed or used inside provided facilities.
  • The enclosed movable-tent electrical exception requires RCD protection, certified/verified electrical products and a combined load no higher than 1,100 W.
    It does not permit flames.

Do not count one shared breaker as a dedicated breaker for multiple units.
Also check first aid, an emergency broadcast system or a megaphone rated at least 10 W with at least 250 m audible range, evacuation notices, backup power or batteries, and emergency torches.
Review the full Annex 7: staff present during opening, safety education at least yearly, inspections at least monthly, half-yearly submissions and records retained at least two years.
Applicable drinking-water supply arrangements require annual water-quality testing.

Check the full insurance schedule as well as top-grade limits

Registered campground operators must arrange liability insurance or qualifying mutual coverage before starting business for guest losses from disasters or safety accidents at the campground.
Article 18(7) specifies death coverage within KRW 100 million per person and property loss within KRW 100 million per event.
When death loss is below KRW 20 million, the amount is set at KRW 20 million.
These conditions do not promise a flat KRW 100 million for every accident.

Per-person injury and residual-disability limits for all 14 grades under Annexes 3-2 and 3-3
GradeInjury (KRW)Residual disability (KRW)
120,000,000100,000,000
210,000,00090,000,000
310,000,00080,000,000
49,000,00070,000,000
59,000,00060,000,000
65,000,00050,000,000
75,000,00040,000,000
82,400,00030,000,000
92,400,00022,500,000
101,600,00018,800,000
111,600,00015,000,000
12800,00012,500,000
13800,00010,000,000
14800,0006,300,000

Adequate top-grade entries do not confirm the remaining grades or coverage wording.
Article 18(8) requires combined-event terms: injury followed by death adds the relevant injury and death amounts; injury followed by residual disability adds injury and disability amounts.
Death after a disability payment also involves the statutory deduction for the relevant loss after death.
Medical grading, actual losses, exclusions and premiums require separate assessment.

Disposition order and substitute surcharges require separate review

Basic campground dispositions under Tourism Enforcement Decree Annex 2
Same violationFirstSecondThirdFourth
Missing liability coverageCorrection1-month suspension2-month suspensionCancellation
Safety/hygiene or standards no longer met after registrationCorrection15-day suspension1-month suspensionCancellation

Annex 2 uses prior dispositions for the same violation within the last year, comparing the disposition date with the later detection date.
Use the highest qualifying prior order, not lifetime occurrences.
Refusal of a new registration differs from sanctions after a registered business ceases meeting standards.

Under Act Article 37, the authority may replace suspension with a surcharge under the statutory inconvenience/public-interest conditions.
The safety/hygiene base of KRW 2 million, standards base of KRW 800,000 and the decree Article 34 adjustment range of 50% are references, not automatic payment choices.
This tool does not calculate a substitute amount for missing insurance or turn cancellation into a cash payment.
Unregistered campground operation separately carries up to two years of imprisonment or KRW 20 million in fines under Article 83(2); both can apply.

Forest campgrounds use a separate set of limits

Forest Recreation Enforcement Decree Article 9-3(2) is shown independently of the tourism checks.
For development by someone other than the national or a local government, maximum forest alteration is A × 30% when area A is at most 10,000 m²; 3,000 + (A − 10,000) × 5% when 10,000 < A ≤ 50,000 m²; and A × 10% when A exceeds 50,000 m².
National or local government development uses A × 10% throughout.
Building floors must be strictly below A × 10%, and buildings must have no more than two storeys.

The 3,000 m² ceiling is not the total development ceiling

Act Article 20(3) concerns land surrounded by the development forest and considered necessary for the plan.
Decree Article 8 limits that included non-forest land to the smaller of 10% of development area and 3,000 m²; it does not allow arbitrary adjacent land to be added.
It does not cap the whole campground at 3,000 m² either.
A private-developer example with A = 30,000 m² has alteration up to 4,000 m², building floors strictly below 3,000 m² and included non-forest land up to 3,000 m².
Ask the forestry authority about excluded pre-existing paths, development-plan approval, other forest restrictions and concurrent Tourism Promotion Act registration.

Step-by-step use and a worked design example

  1. Verify zoning, surveyed area and building measurements from official land-use records and design drawings.
  2. Separate net camping space from roads and communal facilities, and identify the reservation for provided facilities.
  3. Enter ordinary pitch plans, unit counts, gaps and installed equipment counts.
  4. Compare site conditions, all four policy covers and full wording; preserve unknowns.
  5. Save the TXT report or print both the work and review lists for the designer, authority and insurer.

Fictional 8,000 m² conservation-management site

With 3,000 m² net area, 40 tent pitches of 30 m², zero vehicle pitches and 600 m² reserved for four glamping units and two trailers, planned use is 1,800 m² and remaining area is 1,200 m².
Retaining the zero-vehicle plan gives a statutory tent ceiling of 160, or 80 using the entered 30 m² pitch size.
Retaining the 40-tent plan gives a vehicle ceiling of 24, or 20 using the entered 60 m² vehicle pitch size.
These are alternatives, not two allocations to fill simultaneously.

The shared extinguisher estimate is max(ceil(44 ÷ 2), ceil(1,800 ÷ 100)) = 22.
Adding six provided-unit extinguishers and one ash-handling extinguisher gives a procurement reference of 29.
Each of the other four unit-specific equipment types is compared against six units.
The 850 m² building plan needs reduction below 300 m², while unverified insurance and operations remain separate review items.

Frequently asked questions

Does sufficient land area guarantee registration?

No.
Area division leaves siting, access, utilities, safety, building approvals and local registration review unresolved.

Can building floors equal exactly 10%?

No.
The rule is strictly below the boundary.
Conservation zones also require less than 300 m² and total area below 10,000 m².

Should glamping units be counted again as ordinary tents?

No.
This tool uses separate provided-unit counts and reserved area to avoid duplication.
Statutory facility and business classifications require local review.

Are 29 extinguishers the certified minimum?

No.
That is the conservative procurement estimate in the example.
Confirm wording, coverage area, ratings and placement locally.

Are sufficient top-grade policy limits enough?

No.
Check all injury and disability grades, the death minimum, combined-event provisions, validity and scope of coverage.

Can I pay a surcharge instead of closing?

The authority decides under statutory conditions.
It is not an automatic option for the operator.

Does the forest result replace tourism registration?

No.
Review forestry development approval, related land requirements and concurrent tourism registration separately.

Which application documents should I prepare?

Prepare the business plan, floor/layout plans, facility inventory, permit evidence and electrical pre-use certificate.
Check applicable LPG completion evidence and drinking-water test results for groundwater or other non-tap sources.

Official sources and future checks

Checked 2026-11-02 through the National Law Information OPEN API.
Sources: Tourism Promotion Act MST285653, Articles 4, 9, 20-2, 35, 37 and 83; Enforcement Decree MST291395, Annexes 1–3 and Article 34; Enforcement Rule MST291551, Articles 2, 18 and 28-2 and Annexes 3-2, 3-3 and 7; Forest Recreation Enforcement Decree MST288293, Articles 8 and 9-3; Forest Recreation Act MST267329, Article 20(3).
The forest Act version is effective 2025-06-21.
The registration annex itself was amended 2026-08-04 and the safety/hygiene annex itself 2025-12-29.

Recheck amendments, actual zoning and measurements, building classification, exception evidence, extinguisher interpretation and placement, policy wording, qualifying disposition history, discretion and forest approvals.
The applicable law and site facts may change between using this tool and applying or opening.

Share a revised design checklist before signing

Send the work and review lists to the architect and local tourism authority.
Use separate tools for land-development screening and business returns.