Rural Stay Shelter Cost Calculator

Rural Stay Shelter Cost Calculator helps model Korea-related development, construction, redevelopment, conversion, or project-cost assumptions in English.

Rural stay shelter installation and conversion cost calculator

Uses the Korean rural-stay-shelter model for new installation and nongmak conversion, 33 sqm body limit, annex area, deck cap, septic system, utilities, transport, temporary-building permit, acquisition tax 2.2 percent, annual property tax 0.25 percent, and 12-year holding cost.

Korean source inputs

Total installation

₩59,880,000

Body, foundation, utilities, permit, deck, parking, and transport.

Total ownership cost

₩62,628,200

Installation plus acquisition tax and property tax over the holding period.

Effective body area

33 sqm

New body installation area.

Acquisition tax

₩1,162,700

Default 2.2 percent temporary-building original acquisition tax.

Minimum farmland

117 sqm

35.4 pyeong, based on (body + annex) x 2.

Deck over limit

No

Deck cap 9.8 sqm.

This English calculator calls the same pure real-estate calculation function used by the Korean page. Inputs and labels are translated; the formula is not replaced by a generic stub.

Related calculators

Rural stay shelter cost calculator

This guide translates the Korean rural stay shelter model for new installation and nongmak conversion, body area, annex facilities, deck, utilities, acquisition tax, property tax, and holding period.

Area and land requirements

The body area limit is 33 sqm. Annex facilities can be 38.5 sqm in the Korean guide, and minimum farmland is (body + annex) x 2, maximum example 143 sqm.

Existing nongmak 20 sqm can convert by December 2027 when it satisfies the conversion conditions reflected in the Korean content. New shelter and conversion have different cost structures.

Tax and house-count treatment

Acquisition tax 2.2 percent and property tax 0.25 percent are included in the Korean model. The shelter is not counted as a house for the modeled house-count purpose, but local facts and later law changes should still be checked.

The maximum holding period is 12 years in the calculator. The result therefore combines installation cost with acquisition tax and property tax over the selected holding period.

Cost items to confirm

Check septic system, water, electricity distance, foundation, transport route, deck limit, parking, temporary-building filing, farmland status, and whether the existing nongmak can legally convert. Utility distance can dominate the final budget.