Vehicle Wrap Area, Removal & Campaign Quote Calculator

Compare actual quotes for the same panels and work. Review removal costs and campaign cost per day in KRW.

Panel 1

Film specification & allowance

Rectangular dimensions are a quantity check. They do not determine curved-surface cuts, roll orders or legally permitted advertising area.

Campaign dates & assessment

Both end dates count. The entered period is not a permit term or a film warranty.

Services required in every quote

Select only required work. Stored amounts for unchecked services are not added.

Related calculators

Compare vehicle wrap quotes for the same panels

The vehicle wrap area, removal and advertising period calculator checks whether supplier quotes cover the same body panels, film specification and services.
A low package price can leave out artwork, printing, removal of the old film or removal after the campaign.
Recording the coverage status and confirmed price of each item helps you distinguish the cost of getting the vehicle ready from the removal obligation that remains later.

This tool is intended for vehicle owners, small businesses ordering vehicle graphics, event operators and family members helping to enter quotes.
The comparison describes price and scope; it does not rank workmanship or predict advertising returns.
The separate car wrap versus paint lifetime cost calculator serves a different decision: comparing long term expenditure once the overall installation price is already known.
All prices on this page are in Korean won (KRW), and the Korean advertising rules below are provided as separate jurisdictional context.

Start with panel dimensions and film specifications

Panel name, width, height and quantity

Enter dimensions in metres (m), with quantity representing panels of the same dimensions.
Register left and right sides separately when their sizes differ.
Agree with the installer how windows, bumpers, handles and other separate work are treated, and record that scope in the panel description.
You can manage up to eight panels under one common specification.

Film, printing and finish

Record the film family, colour, printing, protective finish and any agreed edge or seam treatment.
Equal area alone does not create an equal specification.
If the material or printing method changes, ask each supplier to confirm the revised scope before comparing its total.

A panel without complete dimensions has unconfirmed area.
The calculator does not infer the whole body area from a vehicle category.
Input quantity limits are software controls rather than legal limits.
Use installer measurements and a cutting plan for curved surfaces, recesses, overlaps and wrapped edges.

Net area and area with waste allowance

Net area = sum of panel width × height × quantity
Reference area with allowance = net area × (1 + waste allowance ÷ 100)

One left panel and one right panel, each 2m × 1m, give 4m² of net area.
A user assumed allowance of 10% produces a reference area of 4.4m².
The 10% is a worked assumption, not a universal manufacturer specification or a Korean industry standard.

Area helps you check the physical scope of the quotes.
A separately charged panel uses the actual quoted fixed price per panel multiplied by quantity.
The calculator does not invent a market price by multiplying the reference area by an assumed price per square metre.
Film width, orientation, artwork continuity, cutting layout, offcuts and rework can change the actual material order.
Neither area figure confirms the required roll purchase or the legally permitted advertising display area.

Included, separate, excluded and unconfirmed

  • Included: the item is covered by the package price.
    Any previously entered separate price is ignored, preventing duplicate additions.
  • Separate: the item is charged outside the package.
    Panels use a fixed per panel price and quantity; required services use a fixed amount per contract.
  • Excluded or unavailable: the supplier does not provide a panel or service required by the common scope.
    Its total and ranking remain on hold because the scope is different.
  • Unconfirmed: the quote does not establish coverage.
    The item remains a question for the supplier instead of being treated as free.

A blank amount differs from a confirmed zero.
Enter 0 when the supplier has confirmed that a separate item is provided without an additional charge.
Leave an unanswered item unconfirmed.
When a required price, tax amount or service detail is missing, the tool can show the known subtotal but cannot label it a complete quote.

Check artwork, installation work and both removal stages

In the common scope, choose which services are needed: artwork and printing, disassembly and reassembly, removal of existing film, end of campaign removal and surface restoration.
Match the coverage status of each required service across suppliers.
A service marked unnecessary in the common scope is not added back as a required comparison cost.
Removing the old advertisement before installation and removing the new film after this campaign are different jobs, so record them separately.

Removal price and paint damage responsibility are separate

Check whether removal includes adhesive residue treatment and cleaning.
Record who inspects repainted areas and who is responsible for paint lifting or restoration, including exclusions.
Entering a removal charge does not automatically include damage compensation or repainting.
Confirm the responsible party and conditions before treating quotes as having the same responsibility scope.

Tax, quote validity and campaign dates

All monetary inputs use KRW.
Choose whether tax is included, separate or unconfirmed.
For separate tax, enter the fixed amount confirmed by the supplier; the tool does not impose a blanket 10% tax calculation.
When tax is included, a leftover separate tax amount is ignored.
Copy the package and service prices using a consistent tax basis so that a tax inclusive item is not taxed again through another amount.

The campaign day count includes both the start and end dates.
2026-12-01 through 2026-12-30 is 30 days, and an identical start and end date is one day.
Also enter the installation date, quote valid through date and the date on which you are evaluating the quote.
A quote is held when the evaluation date is later than its validity deadline or installation is later than the campaign start.
Invalid calendar dates and an end date before the start must be corrected.

How the total and period equivalents are calculated

Confirmed amount = package price + separate panel price × quantity + required separate service amounts + confirmed separate tax
Items included in the package are not added again.
The calculation does not repeatedly round up intermediate amounts; the final sum is rounded to the nearest won.

Daily equivalent = confirmed total for the same scope ÷ campaign days
30 day equivalent = confirmed total ÷ campaign days × 30
The 30 day figure is a comparison measure, not the actual invoice for a calendar month.

The separate end removal amount is already part of the total.
Its separate display helps identify the later obligation; do not add it to the total a second time.
The total less separate end removal subtracts only that separately charged amount from the confirmed total.
It does not allocate tax between removal and other work, or represent the actual initial cash or deposit.
Agree deposits, payment dates and the removal payment separately with the supplier.

A practical quote entry workflow

  1. Enter the first panel width, height and quantity, then add the other panels in the agreed scope.
    Record film and printing specifications, waste allowance and required services.
  2. Set the campaign dates and evaluation date.
    Known area can be shown before the prices are complete; the result remains an input prompt and known subtotal until the required details are available.
  3. Add up to four suppliers and copy each package price, panel and service status, separate amount and tax arrangement.
    Switch the active supplier tab to edit one quote while retaining the others.
  4. Check removal responsibility, damage and restoration terms, installation date and quote validity.
    Confirm that each quote matches the common scope.
    Changing that scope requires suppliers to be checked again.
  5. Read confirmed totals beside the reasons for any hold, then save or print the comparison.
    The example is a temporary view of fictional inputs; returning from it restores the inputs you were working on.

Worked example: compare the complete cost

Both quotes cover a left and right panel, each 2m × 1m with quantity one: 4m² net and 4.4m² with an assumed 10% allowance.
The campaign runs for 30 days, from 2026-12-01 through 2026-12-30.
Evaluation is on 2026-11-22, both quotes remain valid through 2026-11-30, and installation is on 2026-11-30.
Artwork and printing, disassembly and reassembly, existing film removal and end removal are required; surface restoration is unnecessary for this comparison.
Every price below is fictional and is neither a market average nor a recommended rate.

Fictional vehicle wrap quotes from suppliers A and B for the same panels and 30 day campaign
ItemSupplier A (KRW)Supplier B (KRW)
Package, including the same panels600,000500,000
Additional artwork and printingIncluded80,000
Additional disassembly and reassemblyIncluded40,000
Additional existing film removal100,00080,000
Additional end removal150,000120,000
Separate tax85,000Included
Confirmed total and 30 day equivalent935,000820,000

Once all scope and responsibility conditions have been confirmed, supplier B is KRW 115,000 lower than A.
Supplier A has a daily equivalent of approximately KRW 31,167 and a 30 day equivalent of KRW 935,000.
The difference identifies a lower price under these inputs; it does not establish superior workmanship or warranty coverage.

Read confirmed quotes separately from removal sensitivity

When at least two quotes are confirmed, compare their totals and difference for the same scope.
Equal totals are a tie.
A quote missing a price, excluding a required panel, or lacking confirmed services, tax or responsibility is not a lowest price candidate even when its known subtotal is small.
Resolve the listed hold reasons first so that the next question for each supplier is clear.

A: end removal ±10% assumption

Changing only the KRW 150,000 removal charge by KRW 15,000 gives an assumed total of KRW 920,000–950,000.
Other costs and the entered tax remain unchanged.

B: end removal ±10% assumption

Changing only the KRW 120,000 removal charge by KRW 12,000 gives an assumed total of KRW 808,000–832,000.
If removal is included without a separate charge, this assumption introduces no additional variation.

Sensitivity is an auxiliary calculation using the percentage you choose.
It does not predict a supplier price increase, estimate paint damage probability or recalculate tax.
If the surface condition or removal date changes, obtain a revised quote instead of treating the assumed range as a price guarantee.

Use the result to request a revised quote

  • Business name change: require both existing film removal and new artwork and printing.
    Distinguish panels being replaced from panels being retained.
  • Fixed date event: confirm who removes the graphics after the campaign and when the vehicle is available again.
    Keep the period equivalent separate from the actual payment schedule.
  • Several suppliers: compare the same film, panels, printing and removal conditions.
    Ask suppliers with different coverage for the cost of the missing work before choosing a price.

TXT saving and printing preserve the common specification, known quote amounts, hold reasons, panel and removal coverage, and confirmation checklist.
Saving creates a local file without uploading supplier documents or personal information.
Use the result as a comparison sheet for supplier responses and keep the final contract separately.
A checked item records your own confirmation; it does not replace a written supplier response or an advertising permit.

Campaign duration, film life and Korean display rules

Campaign duration is the contractual use period entered to divide the cost.
It is not a product warranty or permission to advertise for that period, and the tool does not estimate views or sales.
Confirm the vehicle type, ownership, advertisement content, local jurisdiction and permit or notification requirements before installation.

Korean jurisdiction and 2026 rules

The Korean Outdoor Advertising Act Enforcement Decree checked on 2026-11-22 is effective from 2026-01-27.
Article 19 contains conditions that depend on vehicle type and advertising party, including excluded windows, a one half limit for individual body sides and restrictions on advertising content.
Cutting area alone cannot establish compliance.
Article 8(3) and Annex 1, item 13(a), set a display period of up to 3 years for transport advertising including cars, but this is not a universal permission period for every contract or a guarantee of automatic renewal.
Confirm the applicable process with the relevant authority.

The official 3M guidance explains that quote prices vary with vehicle size, coverage and product.
Removal and paint condition guidance depends on the product, printing, installation orientation, region and conditions of use.
Do not convert overseas guidance for colour change film into a fixed life or damage free removal promise for printed advertising film in Korea.

Frequently asked questions

Can I get a whole vehicle price just by choosing a model?

The tool does not provide an average price by vehicle category.
Enter measured panel dimensions and actual supplier prices to compare a common scope.
Even a single package quote needs a clear list of the panels and services it includes before omissions can be identified.

What is the correct waste allowance?

There is no universal allowance supplied by this tool.
Film direction, artwork continuity, recesses, seams and film width affect the material needed.
The 10% example is an assumption for explanation; use the cutting plan confirmed by the installer when ordering material.

What happens to an old amount after I mark an item included?

An included item is already part of the package, so its stored separate amount is ignored.
If you change its status back to separate, the entered amount is used again.
Check both status and amount to avoid counting the same work in the package and as an extra.

Why is zero different from a blank amount?

Zero means the supplier has confirmed there is no additional charge.
A blank means a required price has not yet been entered.
Converting a blank to zero could make an incomplete quote appear cheapest, so only the known subtotal is shown while required information is missing.

Does a removal charge include a guarantee against paint damage?

Removal labour and restoration responsibility are different issues.
Confirm repainting history, paint condition, adhesive residue treatment, restoration scope and exclusions with the supplier.
The calculator does not estimate damage probability or compensation; responsibility conditions are recorded separately.

Is the 30 day equivalent my monthly payment?

It is the complete cost divided by campaign days and multiplied by 30.
It is not a calendar month invoice or instalment amount, and identical start and end dates count as one day.
Agree actual deposits, balances and removal payment dates with the supplier.

Why is a low price still on hold?

A required panel may be excluded, a service or tax condition may be unconfirmed, removal responsibility may be missing, or the validity and installation dates may not match.
Read the hold reasons and obtain the missing scope and prices before treating the amount as a complete comparable quote.

Can I use the example or sensitivity range as a contract price?

The example uses fictional prices, and sensitivity uses your assumed change to the separate end removal charge.
Neither is a market price or a supplier commitment.
Returning from the example restores your previous inputs; use current quotations and confirmed conditions for the final comparison.

Sources and your next checks

Sources were checked on 2026-11-22.
The Korean Act effective from 2026-02-15, the Enforcement Decree effective from 2026-01-27 and its Annex 1 were checked.
The product removal reference is the 3M 2080 Maintenance FAQ revised in July 2023.
Use current contract documents for prices and dates, and check again when legislation, product warranties or supplier coverage changes.

Enter the first panel and identify missing items

Have the measured width, height and supplier quotes ready, then enter the common panels.
Resolve excluded and unconfirmed items, confirm removal, tax and responsibility conditions, and save the comparison for a revised quote and final contract discussion.