Compare the same restoration scope before comparing an area rate
The Stone Restoration Area and Process Quote Calculator connects a measured work area with the restoration processes in actual contractor quotations.
Households, relatives helping with a move, and small shop or office operators can use it to organise written quotes.
A low price per pyeong does not tell you whether lippage removal, joint repair, stain treatment, surrounding protection and furniture moving are included.
Restoring surface shine and restoring deeper grinding marks or height differences are different scopes.
An apparently cheaper quote may omit necessary work or require a longer interruption before the space can be used again.
Agree on the stone, target finish and required processes first, then record which work is included and which is charged separately.
The calculator checks arithmetic from a professionally confirmed specification and quote; it does not diagnose the stone or design a restoration method.
This 2026 model uses m², Korean pyeong and KRW for contract arithmetic.
It supplies no national market price, recommended polishing sequence, safe re-entry period or statutory tax-rate default.
For an ordinary move-in cleaning scope, see the
Cleaning Quote Scope Comparison Calculator.
Start with the actual work area and its unit
Enter the stone area agreed for this job rather than a home’s advertised or gross floor area.
Resolve excluded rooms and areas beneath fixed furniture on the measurement sheet before entering a total, and avoid counting a shared area twice.
Choose m² or pyeong; 1 pyeong = 400 ÷ 121 m².
Each contractor’s base-polishing charge is connected to the same measured area even when the quoted billing units differ.
Read the area unit together with the rate
An m² quote uses converted measured m² × price per m², while a pyeong quote uses converted measured pyeong × price per pyeong.
A lump-sum base-polishing quote uses quantity 1, so its whole-job amount is not multiplied by the area again.
The base-polishing billable area and an extra process’s actual quantity are separate inputs.
The measured area must be greater than zero and no more than 100,000, with up to four decimal places.
Leave an unknown quantity or rate blank rather than inventing a zero.
An entry covering only part of the measurement is a check for that entered scope, not the cost of the entire project.
If several stone types or target finishes cannot be described by one common area, separate the specifications and obtain quotes for a genuinely matching scope first.
Match the stone, target finish and polishing specification
Use the stone note to record the confirmed material and location, and describe the agreed shine, surface condition and restoration extent in the target-finish note.
Do not treat marble, granite and engineered stone as the same polishing job because their names or appearance seem similar.
The polishing-stage note records the contractor’s confirmed sequence and finish; it is not a sequence recommendation from the calculator.
A higher stage count alone does not establish better restoration quality.
Klinsystem’s supplier document distinguishes levelling, removal of earlier grinding marks, resin polishing, stone-appropriate polishing and final cleaning, with variations for stone and lippage conditions.
These distinctions help identify questions for a quote.
They do not turn particular tools or grit numbers into a standard method for all Korean sites.
The contractor and site representative must separately agree on the test finish and its acceptance criteria.
The same-scope confirmation means that the quotes cover the same measured area, stone, target finish, polishing specification and required processes.
Checking a box cannot make different restoration scopes equivalent.
When the conditions change, review the scope and confirmation with the contractor as well as changing the numbers.
Check lippage, joints, stains and protection process by process
- Base polishing: The agreed area and base grinding or polishing specification are always part of the comparison.
Confirm a separate rate or inclusion in the package.
- Lippage work: Confirm the affected areas and whether this work overlaps with base polishing.
The calculator does not decide whether a height difference can be removed or how deeply the surface may be ground.
- Joint repair and stain treatment: Enter the quantities actually quoted, such as joint length, item counts or a treatment area.
They are not automatically assumed to equal the entire measured floor area.
- Protection and furniture moving: Check responsibility for adjacent finishes, fixtures, access routes, removal and replacement of furniture.
Record whether the customer carries out an action or the contractor charges for it.
- Test work and final cleaning: Agree on a trial area, the finish to approve, and the final clean-up scope.
The presence of these fields does not imply one mandatory test area or cleaning fee for every site.
Select the additional processes required for this comparison in the common conditions.
A process marked as not required is omitted from the comparison scope and cost sum.
Do not deselect work that is actually charged merely to make a quote look cheaper.
If an inseparable package includes a different scope, request a matching-scope quote rather than estimating a deduction for its included work.
Included, separate, excluded and unconfirmed have different meanings
Included and separate
Included confirms that a process is already covered by the package amount.
An old separate amount retained in that row is not added again after switching to included.
Separate charges use the confirmed quantity multiplied by the unit rate.
If there is no package charge, explicitly enter a confirmed zero for the package amount.
Excluded and unconfirmed
Excluded means that the contractor does not provide that process in this quote.
Excluding a required process leaves a scope gap and blocks comparison.
Unconfirmed does not mean free; first ask whether the process is covered.
Distinguish a confirmed zero from an unknown amount.
For an extra separate process, choose the quoted unit from m², pyeong, m, items or lump sum, then enter the confirmed quantity and unit price.
A lump-sum process can normally be represented by quantity 1 and the whole process price, subject to the contract’s actual quantity definition.
A 50 m² floor may still have joint work billed by length and furniture moving billed per item or as a single amount.
Changing a unit while keeping the same quantity and rate can create a completely different cost, so review them together.
The known subtotal adds only confirmed amounts.
An unknown line contributes no separate amount to that subtotal, but this is not confirmation that it is free.
Unresolved required work, package, minimum charge, visit, tax or quote-period information prevents a final total and overall price ranking.
Send the pending list to the contractor to obtain the missing amounts and scope details.
Separate minimum area, quantity increments and monetary rounding
Base-polishing billable quantity
Billable quantity = max(converted measured area, quoted minimum billable area)
If the quantity increment is greater than zero, round the quantity up to a multiple of that increment.
For example, measured area 51 m², minimum 50 m² and increment 5 m² produce 55 billable m².
Lump-sum base polishing uses quantity 1 and ignores inactive area conditions.
Enter the minimum area and increment in the contractor’s actual billing unit.
A minimum of 50 m² differs from a minimum of 50 pyeong.
The illustration explains the formula and is not an industry minimum or standard rounding policy.
A contract applying a separate minimum to every room differs from this model’s single project-level base quantity; request a quote expressed on a matching basis.
The default calculation retains intermediate monetary precision and rounds the final total to the nearest KRW.
If the contract rounds process prices upward, select an intermediate monetary increment of KRW 1, 10, 100 or 1,000.
The selected upward rounding applies to the package and each process amount before summing.
Adding individually rounded displayed figures by hand can differ slightly from the rounded final total, so check the contract’s actual rounding rule.
Apply the work minimum and a separate visit charge once each
The work minimum is a floor applied to the package plus required separate process costs.
It is not an additional fee equal to the entire minimum.
Work costing KRW 860,000 with a KRW 900,000 work minimum receives only a KRW 40,000 adjustment.
If the work already exceeds the minimum, the minimum adjustment is zero.
Work amount = package amount + required separate process costs
Work after minimum = max(work amount, work minimum)
Total = work after minimum + separate visit charge + actual additional tax
This model adds a separate visit charge once, outside the work minimum.
Do not automatically enter a quoted “minimum call-out” as both a work minimum and a separate visit charge.
Ask whether it is a floor for the work or a visit fee charged in addition to it.
A visit included in the package or explicitly confirmed as uncharged adds no separate amount.
An unconfirmed visit status or a blank separate visit amount blocks the total comparison.
Enter a confirmed zero when the contract has no work minimum instead of leaving that field blank.
Confirm actual tax amounts and the quote’s effective period
Tax options distinguish included, separate actual tax, confirmed exempt and unconfirmed treatment.
Included means tax is already inside the entered prices, so it is not added again.
Separate adds the actual tax amount confirmed on the contract; select confirmed exempt only after confirming that treatment for the transaction.
The calculator neither applies one automatic rate to the whole transaction nor decides whether an exemption is available.
A separate actual tax amount of zero must also be explicitly confirmed.
Enter a common comparison date and the effective start and validity-end dates of each quotation.
The comparison date must fall within that period, including both endpoint dates.
Correct reversed periods and dates that do not exist in the calendar.
Do not assume an expired quote remains valid for a later job; ask the contractor whether both its amount and scope still apply.
If any active quote has unresolved required information, the overall cheapest quote and price difference remain pending.
Once at least two quotes are fully confirmed, compare their totals on the same rows and read ties as equal prices.
One quote can have its arithmetic checked but cannot provide a contractor-to-contractor ranking.
A lower price does not establish superior quality, method, safety or contract suitability.
Check the fictional 50 m² marble restoration example
Assume a measured marble area of 50 m² with the same target finish and polishing specification for both contractors.
All required processes, same-scope confirmations, validity periods and tax arrangements are confirmed, and intermediate monetary rounding is off.
The prices and times below are fictional arithmetic examples, not Korean market rates or recommended working times.
Process costs and totals for fictional stone-restoration quotes A and B covering 50 m²| Item | Quote A · KRW | Quote B · KRW |
|---|
| Package amount | 0 | 980,000 |
| Base polishing · 50 m² × KRW 12,000 | 600,000 | Included |
| Lippage / joints | 100,000 / 80,000 | Included |
| Protection / furniture moving | 50,000 / 30,000 | Included |
| Stains / test work / final cleaning | Included | Included |
| Work → after work minimum | 860,000 → 900,000 | 980,000 |
| Separate visit / actual tax | 50,000 / 95,000 | Included / tax included |
| Final total | 1,045,000 | 980,000 |
A adds a KRW 40,000 work-minimum adjustment to KRW 860,000 of work, followed by a KRW 50,000 visit and KRW 95,000 actual tax, producing KRW 1,045,000.
B’s KRW 980,000 package covers every required process and the visit, with tax included, so its total stays KRW 980,000.
When the same scope is fully confirmed, B is KRW 65,000 lower.
If B’s joints or protection become unconfirmed, KRW 980,000 is no longer a confirmed total for that scope and the overall ranking is withheld.
Read rate sensitivity separately from the actual contract amount
Sensitivity changes only the base-polishing rate by the percentage you enter to explore a hypothetical total.
The permitted change is 0–50%; other process quantities and rates, the package, visit and actual entered tax remain fixed.
The work minimum is reapplied to the changed work amount, so a lower rate does not necessarily reduce the total proportionately.
The result is not a promise that a contractor will issue a revised quote on those terms.
A’s base-polishing rate ±10%
A 10% lower rate produces KRW 540,000 of polishing and KRW 800,000 of work.
The KRW 900,000 work minimum keeps the total at KRW 1,045,000.
A 10% higher rate produces KRW 660,000 of polishing and KRW 920,000 of work, for a KRW 1,065,000 total.
The sensitivity range is KRW 1,045,000–1,065,000, with actual tax fixed at KRW 95,000.
B’s package-included base polishing
If base polishing is included in the package, no separate polishing rate changes and sensitivity remains KRW 980,000.
A package discount or price changes to other processes are outside this sensitivity calculation.
If a real revised quote changes the actual tax, update the main quote’s tax amount as well.
Confirm working time and the re-entry wait separately
Enter the agreed on-site working duration in hours, then enter the required waiting duration after work ends.
If walking and returning furniture have different conditions, confirm the period needed for the intended use with the contractor and the product instructions.
The calculator supplies no universal waiting period for every product or stone.
A blank time remains unconfirmed even when the cost information is complete.
Planned elapsed hours = working hours + waiting hours after work ends
Fictional A: 8 working hours + 24 waiting hours = 32 hours
Fictional B: 6 working hours + 48 waiting hours = 54 hours
These are sums of entered contract conditions, not a determination that re-entry is safe.
Advance furniture clearance, business interruption, phased work by area, product curing and ventilation may not be fully represented by two durations.
Record the work window, walking versus furniture-return conditions, access controls and responsible people in the checklist, and compare them with the actual use schedule.
Reconfirm the waiting period when a product or working sequence changes.
A cheaper quote may require a longer interruption, so read the total and timing together.
Enter, compare and save a checklist for a revised quotation
- Prepare the measurement sheet, site photos and actual written quotations.
Enter the first work area and unit, then define the stone, target finish and required processes.
- Add up to four quotes and record the selected contractor’s package and process statuses.
Confirm separate quantities, rates and units together with base-area minima, rounding and the work minimum.
- Complete the comparison date, validity period, tax and visit conditions, then confirm the same scope.
Do not use a partially entered known subtotal as the final project total.
- Compare totals, unconfirmed or excluded work, minimum adjustments and time conditions on matching rows.
Return to the relevant quote to edit a value and keep the other quotations’ entries intact.
- Save TXT or print the input summary, process amounts and pending list.
Ask the contractor to confirm missing scope, actual tax and re-entry conditions and provide a matching-scope revision.
The worked example preserves your existing entries so you can close it and return to the previous step, selected quote and values.
Replace the fictional amounts and dates before evaluating a real contract.
The optional self-checklist records test-finish approval, protection and furniture responsibility, walking and furniture return, and payment and defect scope.
Its checkmarks document your progress; they do not resolve unknown costs or constitute legal approval.
Frequently asked questions
Does a price per pyeong establish the whole restoration cost?
Confirm lippage, joints, stains, protection, furniture moving, testing, cleaning, the work minimum, visit and tax as well as the area and billing unit.
Unknown required process prices keep the total pending.
Should I enter another rate for a package-included process?
An included process counts through the package amount once.
Its previously entered separate quantity and rate are not added again while included.
Enter the actual package amount from the written quotation.
How does excluded differ from not required?
Not required in the common conditions means the process is outside this comparison scope.
A contractor excluding a required process leaves a scope gap and blocks comparison.
Do not remove genuinely charged work merely to reduce a displayed price.
Are the work minimum and visit charge both added?
The work minimum is a floor for the package plus required separate processes.
Only an actually separate visit charge is added after that floor.
Ask the contractor what a minimum call-out amount means.
Why is tax not calculated using an automatic percentage?
The calculator cannot determine included, separate, exempt or mixed contract treatment.
Enter the actual additional tax from the quotation; unconfirmed tax prevents a final total.
May I re-enter as soon as the displayed duration has elapsed?
The time result only adds entered working time and the contractual wait.
It is not a safety decision.
Follow the product instructions and contractor-confirmed conditions for walking, returning furniture and ventilation.
Is the sensitivity amount a real discounted quotation?
It changes only the base-polishing rate by the entered percentage while keeping the package, other processes, visit and actual tax fixed.
The work minimum is reapplied, so a lower rate may leave the total unchanged.
Does the saved result establish a contract?
TXT and printouts document your inputs, calculations and unresolved questions.
Confirm validity, matching work scope, products and site conditions, payment and defect terms with the contractor before using the result in a contract decision.
Sources and items to recheck before contracting
Sources were checked on 2026-11-24; the implementation reference year is 2026.
Public documents support process distinctions and scope questions, not national standard prices, Korean legal duties or product-specific waiting times.
This model contains no statutory rate or eligibility constant; tax and money are user-confirmed contract inputs.
Review supplier information quarterly and reconfirm actual measurement, stone, polishing specification, inclusions, tax, quote validity and walking or furniture-return conditions for every contract.
If a written quotation calculates differently from this model, obtain a quote on the same basis rather than forcing its figures into incompatible fields.
Agree on the restoration scope and work window in writing
Start with the measured area and the first quote’s process statuses, keeping a clear pending list.
Check the test finish, protection and furniture responsibilities and re-entry conditions alongside the price difference, then use the saved result to request a revised quote.