Exterior Caulking Length & Access Quote Calculator

Measure sealing runs and compare actual Korean-site quotes for removal, backing, access equipment and preparation in KRW.

Preparing the form.

Related calculators

Compare exterior caulking by joint length and scope

This calculator measures the actual sealing runs around windows and compares written offers for the same exterior caulking work.
A count of ten windows does not establish whether all four edges, only selected vertical joints, or removal of old sealant is included.
A low price per window can therefore leave important work and access costs unresolved.

Start with one shared measurement schedule, then enter the billing units and included work for up to four vendors.
The results distinguish measured length from billed length, and a known cost subtotal from a comparable complete total.
There is no assumed national market rate and no equipment or working-day recommendation based on building height.
Replace every example price with your current written quotation.

This 2026 arithmetic model is intended for Korean-site quotes using mm, m and KRW.
It does not determine leakage causes, waterproofing performance, equipment safety, construction suitability or contract validity.
For replacement-window products and installation area, use the separate window opening and installation quote comparison.

Measure the selected horizontal and vertical edges

Put windows with the same dimensions and work scope into one group.
Enter width and height in mm, the actual window count, and the number of horizontal and vertical edges to seal.
Two horizontal plus two vertical edges describe the full rectangular perimeter.
One horizontal plus two vertical edges describe three sides; record whether the omitted side is the top or bottom in the scope notes.

Length formula for each group

(width mm × horizontal edges + height mm × vertical edges) ÷ 1,000 × window count × distinct sealing faces − whole-group excluded m + additional joint m
Horizontal and vertical edge counts are each 0–2, distinct sealing faces are 1–2, and at least one edge must be selected.
A 1,500mm × 1,200mm window has a four-edge perimeter of 5.4m.

Excluded length is the total deduction for the entire group, rather than a deduction for each window.
Do not deduct an edge again if you already left it out of the selected edge count.
Additional joint length must describe a separate measured run outside the basic window perimeter.
Remove overlaps at corners or shared joints using the actual survey and drawing.
An excluded length greater than the original perimeter total, or a negative quantity, must be corrected.

You can enter up to twelve groups, separating different dimensions or work scopes.
A group with blank dimensions remains incomplete.
A subtotal from other completed groups does not establish the complete project length; the overall quote ranking remains pending.

A sealing face means another actual work run

Distinct sealing faces describe separate sets of joints to be sealed around each window.
They do not mean the number of glazing panes, building elevations or floors.
Use two only when two independent runs, such as confirmed interior and exterior sealing, are actually required.
A window visible from one exterior elevation does not automatically have two sealing faces.

Confirm irregular curtain-wall joints and complicated interfaces through a drawing and site survey first.
Enter confirmed non-perimeter segments as additional joint length and retain their locations and measurement evidence.
Joint width, depth, product type and backing specifications require separate manufacturer and contractor confirmation.
The calculator does not convert linear length into cartridge orders or select a suitable product.

Keep metre, per-window and package billing distinct

Select the vendor’s actual base billing unit.
A metre rate multiplies billed length, a per-window rate multiplies the total window count, and a fixed package amount is counted once for the project.
Do not force a per-window or package offer into an invented metre rate.
If the unit is unknown, leave it unknown and ask the vendor to identify the billed quantity.

Billed m = max(measured total length, minimum billed m)
If the contractual ceiling increment is greater than zero, round that quantity up to the next multiple of the increment.
An increment of 0 keeps exact length; the minimum and ceiling apply once to the project total m.

For example, 54m measured, a 60m minimum and a 5m ceiling increment produce 60 billed m.
At 61m measured, the same policy produces 65 billed m.
These are entered contract conditions, rather than standard industry rules.
If a vendor applies minimums or rounding to each window or zone, obtain a consistently restated quote before using this project-total model.

Check removal, backing and protection separately

  • Old sealant removal: identify the actual removal segments and whether disposal and surrounding cleanup are included.
  • Backing and substrate preparation: confirm the agreed material and preparation scope within the base price.
  • Access equipment: confirm equipment, transport, setup, relocation and the final billed quantity in writing.
  • Protection and control: identify agreed protection of adjacent finishes and pedestrian control.
  • Additional call-out: establish whether another visit or mobilisation charge is already included.

For each work item, choose included, separate, not needed or unknown.
Included work adds nothing because it is already represented in the base quotation.
Not needed means you have confirmed that the work is unnecessary for this project.
Neither selection certifies site suitability.
Required unknown work does not become zero; it keeps the comparison pending.

For separate work, enter the actual unit and rate.
Metre-based separate work uses measured m, rather than the vendor’s minimum billed m.
If removal covers a different length from the new sealant, or one work item combines several charging methods, obtain a confirmed fixed amount for that item instead.
Switching an item to included ignores its previous separate amount, preventing the package and a separate charge from being counted twice.

Use provider-confirmed access days and visits

A qualified site provider must assess whether rope access, a lift, scaffolding or another method is suitable.
This calculator does not select equipment from floor count or building height.
Use a quotation that confirms working position, setup space, relocation, transport and site restrictions.

For day or visit rates, enter the final billed quantity after the provider’s minimum period, setup, relocation and rounding conditions have been applied.
Do not convert estimated work hours into days without those terms.
The example of 2 days × KRW150,000 = KRW300,000 is an illustrative agreed charge, not a rental market rate.
If transport or mobilisation is already included, do not add it again as a call-out.

Equipment feasibility, traffic control, permissions, weather and work sequencing need separate confirmation.
A lower quotation does not establish safety or construction suitability.

A minimum invoice is different from a call-out surcharge

The contract-wide minimum invoice is a lower bound applied after adding the base work and separately priced items.
It is not another amount added on top of that subtotal.
An agreed additional call-out is an actual charge added with the other work items.
If a quotation only says minimum call-out, ask the vendor which calculation it means.

Amount after minimum = max(base price + separate work, contract-wide minimum invoice)
Example: KRW400,000 subtotal and KRW500,000 minimum → KRW500,000.
If a KRW100,000 call-out is already part of the subtotal, do not add it twice.

This model applies the minimum to the entire entered contract cost subtotal.
A minimum for labour alone or a minimum rental charge for a particular machine has a different scope.
Obtain a revised quote with the matching scope, or use a confirmed fixed amount for that work item before comparison.

Verify actual tax, validity dates and matching scope

Tax-inclusive quotations retain the entered amounts.
For separate tax, add the actual VAT amount confirmed in the contract.
The calculator does not automatically impose 10% on the whole transaction or determine exemptions and mixed tax treatment.
Leave unconfirmed separate tax blank.
A confirmed zero is different from unknown, and unknown tax prevents a final comparable total and ranking.

Enter the effective start date and valid-through date for each quote, then check whether the shared comparison date falls within that interval.
Both boundary dates are included.
Reversed intervals and invalid calendar dates keep the comparison pending.
The example uses comparison date 2026-11-24 and validity 2026-11-01–2026-12-31.
Replace those example dates with the dates on your actual quotations.

Confirm matching scope only after checking the same windows, edges, sealing faces and billing terms with the provider.
Record missing locations as excluded work and request a corrected quotation.
Changing common length or scope clears the previous confirmation, because it referred to the old requirements.
If any vendor has an unresolved comparison condition, the overall price ranking remains pending.
Confirmed equal totals are a tie rather than an arbitrary vendor recommendation.

From the first measurement to a revised written quote

  1. Prepare measured windows, photos or drawings and written offers, then enter the first width in mm.
    Separate groups with different dimensions or work scopes and record excluded and additional joints.
  2. Check distinct sealing faces and duplicate measurements, then review group lengths and total requirements.
    A subtotal from partially entered groups is not a confirmed complete quantity.
  3. Select a vendor and copy the billing unit, rate, minimum, ceiling increment and five work-item statuses.
    Use written evidence for dates, tax and matching-scope confirmation.
  4. Compare the same total measures and pending reasons in the results.
    Return to the relevant step or vendor to edit, and confirm that switching vendors preserves each set of entered values.
  5. Save a TXT report or print the length schedule and unresolved checklist, then request quotes for exactly the same scope.
    A self-reported site-check mark records your progress; it does not automatically resolve missing costs or unknown terms.

Loading the worked example preserves your current input, editing step and selected vendor.
Restore your own input after reviewing it to continue from that position.
You can transcribe the necessary measurements and scope without uploading private contracts or photographs.

Worked example: 54m and two comparable quotes

Use ten windows measuring 1,500mm × 1,200mm, with two horizontal edges, two vertical edges and one distinct sealing face.
With zero excluded and additional joint length, (1,500 × 2 + 1,200 × 2) ÷ 1,000 × 10 = 54m.
Assume both vendors confirm matching scope and billing terms, and each contract-wide minimum is zero.

Vendor A: metres plus equipment days

Base: 54m × KRW10,000 = KRW540,000
Removal: 54m × KRW2,000 = KRW108,000
Access: 2 days × KRW150,000 = KRW300,000
Backing, protection and call-out included
Cost subtotal: KRW948,000
Actual separate tax: KRW94,800
Total: KRW1,042,800

Vendor B: fixed price for the same scope

Fixed package: KRW1,000,000
Removal, backing, access, protection and call-out included
Tax included; no separate tax added
Total: KRW1,000,000
When every comparison condition is confirmed, B is KRW42,800 lower.

These are invented values for checking the arithmetic.
Neither A’s KRW10,000 rate nor the KRW150,000 day charge is a standard site price.
If B’s equipment status becomes unknown, KRW1,000,000 is no longer a confirmed complete project cost and ranking is withheld.
The model retains intermediate precision and rounds the final amount to one KRW, so adding rounded displayed components manually can differ from the final result.

Read length sensitivity separately from actual quotations

Set an assumed length variation between 0 and 100%.
For the same window count, the model decreases or increases measured length and reapplies the metre-billing minimum and ceiling.
Separate metre-based work changes with it.
Per-window and fixed base prices, day/visit/fixed work and the actual separate tax amount stay fixed.
This does not predict added windows or changing equipment days.

Example length ±10% → 48.6m / 59.4m
A: 48.6 × 12,000 + 300,000 + 94,800 = KRW978,000
A: 59.4 × 12,000 + 300,000 + 94,800 = KRW1,107,600
B stays at its fixed KRW1,000,000 package in this assumption.
The KRW94,800 tax amount is held fixed.

This interval is not a provider’s price cap or a guarantee against extras.
When the actual survey changes, confirm billed quantities, work items and tax again.
A possible price reversal in this scenario is a reason to verify the original measurements carefully, rather than a new binding quotation.

Practical uses and limits

Homeowner or family review

Add actual edges and sealing faces to a quote that only lists window counts.
When helping a family member enter their documents, do not confirm included work without site or vendor evidence.

Small-building repair order

Separate groups by location and dimensions to distinguish partial repair from full-perimeter work.
Ask about equipment relocation, protection and repeat visits on the same agreed scope.

A deteriorated joint does not by itself establish the cause of water entry.
Obtain appropriate investigation and separate confirmation of product and substrate suitability.
Manufacturer coverage and installation conditions depend on the actual joint dimensions, materials and product.
Do not treat calculated metres as a material order or a construction-quality guarantee.

After comparing prices, retain written drawings, excluded locations, protection and control responsibilities, included items, schedule changes and repeat-visit conditions.
Product delivery and installation omissions belong to the separate window installation acceptance and correction budget.
For a contract covering multiple trades, also consult the home renovation scope quote comparison.

Frequently asked questions

Do ten windows mean ten sealing faces?

No.
Enter ten as the window count.
Sealing faces describe the distinct sets of actual joint runs around each window.
Do not count one work run twice.

Does double glazing mean two sealing faces?

The number of glass panes is different from sealing faces.
Use two only when two independent runs, such as confirmed interior and exterior work, are actually required.

How do I enter a repair covering only selected edges?

Set the horizontal and vertical edge counts to match the scope and record the omitted location.
Do not deduct an unselected edge again as excluded length.

Should I add removal cost when removal is included?

No additional charge is added for confirmed included work.
Enter a unit and rate for separate removal.
Leave unknown removal unknown rather than substituting zero.

Will building height tell me which access equipment to use?

A competent site provider must confirm equipment suitability and feasibility.
The calculator only adds confirmed equipment charges using the final billed days, visits or fixed amount.

Why is VAT not automatically calculated at 10%?

The model uses the actual contract tax status and confirmed separate tax amount.
It does not infer the applicable tax rate or exemption.
Unknown tax keeps the final comparison pending.

Why was my matching-scope confirmation cleared after editing length?

That confirmation applied to the previous quantities and scope.
Reconfirm the revised measurements and billing conditions with the vendor before marking it again.

Does saving the result establish a contract price?

TXT export and printing share your entered assumptions and unresolved questions.
Saving or a self-reported check does not establish missing charges, site safety or contractual validity.

Sources and your next action

The arithmetic model and source review date are 2026-11-24.
These supplier and manufacturer references support scope and linear-length concepts, rather than Korean standard prices or legal obligations.
A page revision date was not separately verified.
Recheck actual prices, tax, equipment suitability and work conditions from current written documents for every contract.

Start with the window width and height, then select the actual edges to seal.
Save the length schedule and pending questions, and request the same written scope including removal, backing, access, protection, call-out and tax from each vendor.