Fire Inspection Equipment, Visit & Report Quote Calculator

Match confirmed equipment and compare inspection, visit, report and repair costs.

1. Provider-confirmed scope

Copy the provider-confirmed equipment list. Use consistent building names and include floors or zones in equipment names to distinguish locations.

Equipment 1

Counts cover all buildings. They are not multiplied by the number of buildings. Enter each vendor’s package-included count below.

2. Matching-scope quotes

? · Equipment 1 · Unknown pieces
Visits (visits)
Reports (reports)
Repairs (one contract total)
Other extras (one contract total)

Quote comparison

Enter the building count and confirmed equipment list to see known subtotals.

Only separate equipment prices change by ±this percentage. Package, visits, reports, repairs, extras and tax amounts stay fixed. This is not a revised quote.

Before requesting a revised quote

Confirm statutory self-inspection fee calculation under Act Article 22 / Rule Article 21, published standard fees, targets, staffing and intervals with a registered Korean provider. This screen compares the scope and arithmetic of your quotes.

Match the equipment list before comparing inspection prices

Two fire inspection quotations can have different prices because they cover different work.
One package may include all extinguishers and detectors, while another bills detectors, additional visits or written reports separately.
Repairs discovered during the inspection also need an explicit scope and approval process.

This Korea-based calculator compares actual KRW quotations for the same equipment and inspection scope confirmed by a registered specialist.
It separates inspection costs, repairs, other additions and quoted tax amounts for up to four vendors.
It does not infer a market price from floor area.
Missing equipment, unknown terms or suspected duplicate rows keep the final comparison pending.

Your next action

Save the equipment, visit and report checklist and send it to the specialist to request a revised quotation.
Confirm inspection scope, staffing, repair approval and reporting responsibilities in writing before ordering.
A lower entered total is a price observation, not a quality assessment.

Use one shared scope for every vendor

Shared equipment ledger

Enter the building count, confirmed inspection type and work date, then each equipment row with its building, location or name, unit and quantity.
Distinguish floors and zones in the equipment name when the same type appears in several places.
All vendors use this shared ledger so the compared quantities stay consistent.

Actual commercial terms

Record the package price and whether each equipment row, visit, report, repair and addition is included, separate, excluded or unknown.
Add a validity end date and confirmation of the same scope.
The calculator distinguishes arithmetic already known from a complete order total.

Visits and reports are counts for the entire contract across all buildings.
The building count is not multiplied into these counts again.
For example, one visit to each of two buildings is two total visits; confirm whether one physical visit can cover several buildings under the agreement.

Understand quantities, units and missing values

  • Buildings: the number of distinct buildings in the equipment ledger must match the stated building count.
    Use consistent names and confirm that no building has been omitted.
  • Equipment and units: pieces, devices, systems and jobs are different pricing units.
    Match the unit to the quotation and avoid counting both individual devices and an overlapping system inspection twice.
  • Total visits and reports: enter the whole-contract count.
    For separate billing, also enter the package-included count so only the additional count is charged.
    An unknown allowance requires written clarification.
  • Repairs and extras: first state whether they are required, absent or unknown.
    A separate repair or extra price is one fixed amount for the entire contract, with no further multiplication by equipment or visit count.
  • Blank versus zero: blank means unknown and zero means explicitly confirmed zero.
    Enter zero for an agreed free item, not merely because the vendor has not supplied a price.

If only some equipment is included, split it into disjoint floor, zone or equipment-number ranges and reconcile those rows with the vendor.
Repeated building-and-equipment names are treated as suspected duplicates even if their units differ.
Different names can still describe overlapping physical equipment, so check the original equipment identifiers yourself.

How the inspection and repair totals are calculated

Equipment and package costs

Separate equipment cost = confirmed quantity × separate unit price.
An included row adds zero even if an old separate price remains in the form.
Inclusion does not confirm a missing quantity: an unknown common quantity still blocks completion.

Visits and reports

Separate visit or report cost = (total count − package-included count) × separate unit price.
The included count cannot exceed the total; a fully included item adds zero.
Paying for report preparation or submission support does not itself transfer the legal reporting responsibility.

Subtotal and quoted tax

Inspection subtotal = package + separate equipment + separate visits + separate reports.
Overall arithmetic subtotal = inspection subtotal + repairs + other additions.
Order total = fully confirmed subtotal + separately quoted tax amount.
Tax already included in the quote is neither added again nor reverse-calculated.

Enter integer KRW amounts and integer quantities in the chosen units.
Ask the vendor to reflect any contractual minimum charge or intermediate rounding in the quoted amounts before entering them.
No universal ten-percent tax rate is applied, and the calculator does not determine taxability, exemption or the final invoice tax amount.

Step-by-step use

  1. Have the registered specialist confirm the inspection scope and type, then prepare the buildings and equipment list.
    Reconcile removed, moved or newly installed equipment with current site records.
  2. Confirm total visits and reports for the whole contract and whether repairs or extras are required.
    Enter the planned work date and each quote validity end date.
  3. Select a vendor and enter its package, inclusion states, separate unit prices, included visit or report counts and tax basis.
    Switching vendors preserves the other quotation inputs.
  4. Read the known subtotal and unknown, excluded or duplicate items first.
    Resolve the specific pending terms with the vendor and confirm matching scope.
  5. Once all terms are known, compare order totals, repair costs and the difference on the same basis.
    Download the TXT checklist or print the report for a revised quote and your order records.

The fictional example demonstrates the workflow.
While it is active, an example label is shown.
Restore my inputs returns to the previous values, selected vendor, checklist and reading position.
On a phone, use the edit-input action to return from the results to the form.

Worked example: the same scope at two prices

These are fictional quotations, not market prices or published standard inspection fees.
Assume one building, an operational inspection, 20 extinguishers, 30 detectors, two total visits, one report, required repairs and no other additions.
The work date is 2026-12-01 and both quotes remain valid through 2026-12-31.

Fictional same-scope fire inspection quotes A and B, all amounts KRW
ItemVendor AVendor B
Package200,000480,000
20 extinguishersIncludedIncluded
30 detectors × KRW 2,00060,000Included
2 visits × KRW 50,000; 0 included100,000Included
1 reportIncludedIncluded
Inspection subtotal360,000480,000
Separate repairs100,000Included
Overall subtotal460,000480,000
Quoted tax46,000 separateIncluded
Order total506,000480,000

With all scope and validity terms confirmed, Vendor B is KRW 26,000 lower.
That difference is not a ranking of inspection quality, legal compliance or repair competence.
If one of Vendor A’s visits is subsequently confirmed as included, only one visit is separately billed.
Keeping the entered tax amount fixed would produce KRW 456,000, but request a revised quotation and tax amount for the actual transaction.

Interpret known subtotals, pending totals and sensitivity

Unknown terms prevent a lowest-vendor selection

A known subtotal can appear after entering only the package price.
The final total, lowest-vendor selection and price difference remain pending when required equipment is excluded, repairs are unknown, validity fails or tax terms are missing.
A known subtotal is the sum already entered, not a guaranteed minimum bill; renegotiation can change known amounts too.

The optional sensitivity input changes only separately charged equipment prices.
Vendor A has KRW 60,000 of separate equipment charges, so a ten-percent change gives a total range of KRW 500,000–512,000.
Vendor B remains KRW 480,000 because all its equipment is included.
The package, visits, reports, repairs, extras and entered tax amount stay fixed.
This is a scenario, not a vendor quotation, a forecast or a tax recalculation.

A tie does not select one vendor arbitrarily.
Compare equipment identifiers, report deliverables, responsibility for defects and approval of additional work when the prices match.
Even a favorable sensitivity scenario requires an updated quote if real unit prices or taxes change.

Practical situations for owners and managers

Changing service providers

Do not compare the previous full contract against a new base price alone.
Share an updated equipment list and request the same visits, reports and repair scope from both vendors.

Bundling multiple buildings

Separate equipment by building and reconcile the distinct building count.
Use whole-contract visits and document whether one visit covers multiple buildings.

Adding repairs after inspection

Separate the inspection engagement from repair authorization.
Confirm defects, photographs, replacement quantities and the approved repair amount before entering it; unresolved repair scope stays unknown.

Helping a family member enter documents

Read the equipment units and quotation dates together.
Preserve unknown fields rather than replacing them with zero for convenience, and use the saved checklist to ask the specialist specific questions.

Korean statutory fees and safety decisions

Article 22(3) of Korea’s Act on Installation and Management of Firefighting Systems provides the statutory basis for self-inspection remuneration; paragraphs (4) and (5) address standard self-inspection fees.
Article 21 of its Enforcement Rule specifies the actual-cost-plus-fixed-fee method.
A legal pricing framework therefore exists: entering a commercial quote does not establish that the statutory calculation is correct.

This tool does not calculate direct labor, direct expenses, overhead and technical fees to validate statutory remuneration or published standards.
It reconciles the scope and arithmetic of actual quotations for specialist-confirmed targets.
A registered specialist and the relevant authority must separately confirm applicability, inspection type, staffing, qualifications, frequency, urgent remediation and repair safety or completion.

Marking a report as included does not remove the responsible person’s legal reporting duties.
For schedules under Article 23 and the Enforcement Rule, use the separate Fire Facility Self-Inspection Deadline Calculator.
This calculator does not issue an inspection certificate or proof of legal compliance.

Frequently asked questions

Can I estimate a fee from floor area alone?

This is not an area-based standard-fee calculator.
Use an equipment list and actual scope confirmed by a registered specialist to compare quantities, units and inclusions.

Is an old unit price added when an item becomes included?

No separate amount is added for an included row.
For separately billed visits and reports, the confirmed package allowance is subtracted from the total count.

Can I select a cheaper quote that excludes equipment?

The final comparison stays pending because the scope differs.
Request inclusion of the missing items or a specialist-confirmed revised target list before comparing again.

Are VAT and exemptions determined automatically?

They are not.
Use one consistent amount basis across the quote and enter actual included-tax terms or a separately quoted tax amount.
For mixed treatment that cannot be represented on one basis, request a normalized final quotation from the vendor.

Can the quote expire on the work date?

The arithmetic comparison accepts the same date.
An earlier expiry blocks completion.
Confirm any specific expiry time or contract-signing-date convention directly with the vendor.

Does a complete total prove compliance with the fee rules?

A complete total means the entered amounts and scope can be compared arithmetically.
Ask the specialist separately about Article 22, Enforcement Rule Article 21 and the applicable published standard fees.

Official sources and update context

Sources were checked on 2026-11-23 using current-law search and article-detail calls to the Korean National Law Information OPEN API.
The effective date of a law version can differ from the effective date of an individual article.
This is a Korea-based 2026 quotation tool, with amounts in KRW.

Recheck equipment identifiers and quantities, provider registration and staffing, contract period, included counts, tax and validity for each order.
New official rules and a current revised quotation take precedence over an old saved result.

Request a revised quote against one equipment list

Start with the confirmed building count and equipment list.
Keep missing items and reporting or repair responsibilities as specific questions, then compare only confirmed amounts.
Save the TXT checklist with the original quotations and reconcile the latest specialist-confirmed scope and price before placing the order.

Related calculators