Korea Structure and Public Facility Liability Damages Calculator
Separate private structure liability from public-facility liability, identify the responsible party, and total documented damages after comparative fault and confirmed same-loss payments.
1. Select the liability regime
Classify the facility by actual possession, installation, management, and public use.
2. Check the core liability facts
Keep an unresolved point as uncertain until records, inspection evidence, or management documents are available.
3. Enter documented damage
Do not duplicate repair value and exchange value, and enter future loss only as an adjusted present value.
Positive damage
Lost income
Non-pecuniary damage
Estimated claim after fault and confirmed payment deduction
₩19,000,000
This amount does not decide facility defect, causation, fault, non-pecuniary damages, or collateral-benefit treatment.
- Gross damage
- ₩19,000,000
- Fault deduction
- -₩0
- After fault
- ₩19,000,000
- Payment deduction
- -₩0
Liability check: Core inputs support a possible claim
Parties to review
- Possessor of the private structure
Damage breakdown
- Positive damage
- ₩13,000,000
- Lost income
- ₩3,000,000
- Non-pecuniary damage
- ₩3,000,000
- Gross damage
- ₩19,000,000
Future income, treatment, and care must already be discounted to present value. The Korean State Compensation Act Enforcement Decree uses the Hoffmann method for relevant lump-sum future losses.
This is a Korea-based 2026 planning estimate, not legal advice. Obtain case-specific review of defect, causation, comparative fault, limitation periods, payment deduction, and the correct defendant.
Related calculators
- State Compensation Claim CalculatorState Compensation Claim Calculator helps estimate Korea-related medical, public benefit, agency, and compensation assumptions in English.
- Water Leak Damage CalculatorWater Leak Damage Calculator helps estimate Korea-related construction defect, water leak, sunlight, jeonse fraud, lease, key money, land compensation, and eviction dispute assumptions in English.
- Construction Defects CalculatorConstruction Defects Calculator helps estimate Korea-related construction defect, water leak, sunlight, jeonse fraud, lease, key money, land compensation, and eviction dispute assumptions in English.
- Traffic Accident Compensation CalculatorTraffic Accident Compensation Calculator helps estimate Korea-related traffic accident, DUI, penalty point, fine, disability, and compensation assumptions in English.
- Lawsuit Cost CalculatorLawsuit Cost Calculator helps estimate Korea-related court filing, litigation, payment order, notary, and lawsuit cost assumptions in English.
- Statute Of Limitations CalculatorStatute Of Limitations Calculator helps estimate Korea-related limitation period, deadline, evidence, and claim-preservation assumptions in English.