Korea Window Delivery & Installation Review Budget

Reconcile contract specifications with actual window deliveries and installation records, then budget written remedial quotes and agreed contractor contributions in KRW.

Use one row per physical window. Review post-contract delivery and installation records and remedial costs. Enter VAT-inclusive KRW amounts; blank means unknown. Record evidence references without uploading photos.

1. Contract and actual opening records

Opening 1
Contract specification
Actual delivery / installation record

2. Remedial tasks and actual quotes

Link a shared quote to several openings to count it once. Record confirmed free remedial work as a linked 0 KRW task.

Related calculators

Reconcile installed windows with the contract, opening by opening

The window delivery, installation and remediation budget calculator organizes what arrived, what was installed and what remains to be checked after signing a window contract.
An installed frame is a different record from a verified glazing specification, matching frame model, opening mechanism and completed finishing work.
Owners and family members can review contract documents alongside site records to distinguish missing windows, different product descriptions and work that has not yet been checked.

After reviewing each opening, link actual remediation quotes to the remaining work.
That work might include installing a delivered window, replacing glazing after specification confirmation, removal, disposal or finishing around a frame.
Enter an agreed contractor contribution to estimate the household preparation budget.
Unknown prices remain unknown, so a confirmed partial subtotal can appear while the overall budget is still pending.

This is a Korea-based project ledger using millimetres, square metres and VAT-inclusive KRW, with reference material checked for the 2026 project year.
Defaults are fictional examples, not market prices or standard construction rates.
A record marked reconciled is not certified inspection approval, legal acceptance, a product-performance warranty or a decision about paying a balance.

Use one row for one physical window

Windows of the same size may be at different delivery and installation stages.
Combining two bedroom windows into one row can hide which location still needs installation.
Enter each physical window separately and use precise locations such as living-room outer window, bedroom inner window or small-bedroom left window.
Check the unit in the contract so that multiple panes or sashes within one complete window are not counted as separate complete openings.

  • The opening ledger supports 1–40 rows, each with an identifiable location and its own linking identity.
  • Contract width and height use millimetres, each greater than zero and no more than 20,000mm.
  • Copy the frame model, glazing composition and opening mechanism from the actual contract specification.
  • If a change agreement altered the location or product, distinguish the original quote from the final amended specification.

These limits define the editing and calculation scope of this tool.
They are not maximum safe window sizes or structural design requirements.
Use the same measurement basis for contract and site records: outer frame, opening and pane dimensions refer to different things.
Measurements of different components should not be treated as directly equivalent.

Separate delivery, installation and completed record review

Not delivered

The product for that opening has not arrived.
Confirm the reason, expected schedule and the remediation task associated with the missing opening.

Delivered, not installed

The product has arrived but installation at that location is incomplete.
Materials stored on site do not count as an installed window.

Installed

The window has been installed.
Actual specifications, finishing and operation review, evidence and a check date are separate requirements for a reconciled record.

Delivered count includes windows that are already installed.
If all three windows arrived but only two were installed, the counts are three delivered and two installed.
Adding those counts would not mean that five windows exist.
Use the not-delivered and delivered-but-uninstalled categories to identify locations requiring follow-up work.

Record contract and actual specifications on the same basis

The five compared fields are width, height, frame model, glazing composition and opening mechanism.
Glazing descriptions can include contracted thickness, layer composition and low-emissivity details needed to identify the agreed product.
Do not infer specifications that have not been verified.
When labels, delivery documents and contract annexes use different descriptions, request supporting product information from the supplier first.

A recorded difference is a question to resolve

Text comparison normalizes whitespace and English letter case, while dimensions compare the entered numerical values.
This only checks whether recorded values match.
It does not calculate a statutory dimensional tolerance, acceptable installation error, thermal or acoustic performance, or brand quality.
For a differently named or approved substitute product, reconcile the change agreement and product documents before reviewing the record again.

Matching numbers and product names do not complete the review by themselves.
The user must also confirm specification agreement, completed finishing and operation, and supporting evidence.
A different recorded value does not automatically establish a legal defect or a duty to replace the product.
Use it to ask why the descriptions differ and what the contract parties agreed.

A reconciled record requires evidence and a check date

An opening is counted as record-reconciled only when it is installed, all five actual fields are present and match the contract entries, specification agreement and finishing completion are confirmed, and evidence plus a valid check date are recorded.
Dates use YYYY-MM-DD.
Evidence notes should identify retrievable material, such as the contract annex page, product-label photograph name or dated supplier confirmation.

  • Leave the specification unconfirmed when glazing composition or a frame model has not been established.
  • Do not mark finishing complete merely because the frame is in place if sealing or surrounding restoration has not been checked.
  • Several issues on one window still count as one opening requiring follow-up.
  • Review confirmations again after editing contract or actual dimensions, specifications, stage or evidence.

This tool does not upload photographs for automated inspection.
It also does not establish facts from a written note.
The ledger organizes checks performed by the user and contractor, so keep original evidence and signed change agreements separately.

Read counts and area as quantity records

Area based on contract dimensions

Opening area = contract width mm × contract height mm ÷ 1,000,000
Total contract area = sum of contract area for every opening
Delivered or installed area = sum of contract area for openings at that stage

Delivered and installed area also use contract dimensions.
An unknown actual measurement therefore does not silently change the area basis used to summarize progress.
Area is a supporting quantity record, not a substitute for a glass order or a complete frame manufacturing schedule.
A large and a small window can involve different lifting, installation and finishing requirements that area alone cannot represent.

Do not use installed area divided by contract area as a construction valuation percentage or a payment percentage.
Payment conditions, finishing scope and confirmation procedures require their own review.
Even a high installed-area figure can coexist with one missing small window or an unresolved glazing specification, so read the opening-level ledger as well.

Link remediation tasks to the affected openings

Each task records a description, quantity, unit, affected openings and the low and high unit prices in an actual quote.
Use descriptions that show the scope, such as small-bedroom installation, bedroom glazing replacement or finishing restoration around two frames.
The tool supports 0–80 tasks, quantities greater than zero and no more than 10,000, and unit prices from zero to KRW one billion.
Leave an unknown amount blank.

One package can cover several openings

If a single call-out or reinstallation quote covers several windows, link those openings to one task.
Enter the package amount once rather than repeating it for each linked opening.
If one opening has several remediation tasks, separate their scope and check that no cost appears in more than one task.

A task without a linked opening can represent shared site work, but it does not replace the remediation plan for an unfinished opening.
Every unfinished opening needs an associated task before the whole remediation scope can be complete.
When the agreed work is free, link a confirmed zero-cost task with evidence instead of leaving its cost unknown.

Confirm quotes and use VAT-inclusive amounts throughout

Every amount in this calculator is VAT-inclusive KRW.
The tool does not add VAT or determine tax treatment.
Request a consistent quotation basis if inclusive and exclusive figures are mixed.
A task cost is confirmed only when both unit-price bounds, quote confirmation, VAT-included confirmation, evidence and a date are supplied.

Task cost low = quantity × confirmed unit price low
Task cost high = quantity × confirmed unit price high
Round each task cost to the nearest whole KRW

For a fixed quote, enter the same amount as both bounds.
For work priced within a conditional range, use only the range actually provided by the contractor.
An unconfirmed upper price leaves the overall budget pending.
Do not replace missing information with a market average or an invented contingency rate.
If the quotation rounds line items or packages differently, align the entered quantities and prices with that quotation first.

Separate agreed contractor contributions from household cash

The agreed contractor contribution is the confirmed amount for the entire task.
It is not a contribution per unit or per linked window and is deducted once from that task.
The contribution agreement must be confirmed and its amount entered before a household preparation budget is available.
Enter a confirmed zero when the parties agreed that the contractor contributes nothing.

Household budget low = task cost low − agreed contractor contribution
Household budget high = task cost high − agreed contractor contribution
0 ≤ agreed contractor contribution ≤ task cost low

A contribution larger than the task-cost lower bound needs correction or clarification.
Do not present a conditional contribution as a fixed agreement before the parties resolve its basis.
An unknown contribution leaves household cash unknown even when the gross remediation cost is known.
The tool assumes neither full contractor coverage nor full household payment for an unresolved contribution.

This result is an arithmetic preparation budget.
It does not establish reimbursement, contractor liability, a damages claim or a lawful deduction from the unpaid contract balance.
Payment and deduction disputes require separate consideration of the contract and facts.

Keep confirmed partial subtotals separate from the overall budget

Confirmed partial subtotal

This includes only tasks meeting the relevant confirmation requirements.
You can see confirmed costs while other quotes or opening links are missing, but the subtotal does not mean the entire project can be completed for that amount.

Overall remediation budget

This requires confirmed overall scope, a task linked to every unfinished opening and confirmed costs for every task.
The overall household budget additionally requires every contractor contribution agreement to be confirmed.

An empty task list does not automatically establish a zero budget.
Zero tasks can mean a confirmed zero only when all opening records are reconciled and overall remediation scope is confirmed.
If an opening remains unfinished without a task, resolve that missing link first.
Use the list of pending reasons alongside the opening and task records to request the missing information.

Worked example: three windows and two remediation tasks

These are fictional values for checking the calculation, not price guidance.
The living-room window is installed and fully record-reconciled, the small-bedroom window is delivered but uninstalled, and the main-bedroom window is installed with a different glazing entry.
Link remediation tasks to the two unfinished openings and confirm overall scope, quotes and contribution agreements.

Fictional contract dimensions and installation review for three windows
LocationContract size mmArea m²Recorded status
Living room1,200 × 1,0001.20Installed and reconciled
Small bedroom600 × 6000.36Delivered, not installed
Main bedroom1,000 × 1,0001.00Installed, glazing entry differs

Total contract area is 2.56m²: three delivered windows, two installed windows, one reconciled record and two openings requiring follow-up.
Small-bedroom installation is 1 task × KRW 100,000–120,000 with a KRW 100,000 contractor contribution.
Bedroom glazing remediation is 1 task × KRW 200,000–250,000 with a KRW 50,000 contribution.
Gross remediation totals KRW 300,000–370,000, agreed contractor contributions total KRW 150,000 and household preparation cash is KRW 150,000–220,000.

Removing the small-bedroom upper price or its contribution confirmation prevents the same overall household budget from being established.
Removing the main-bedroom task link leaves an unfinished opening outside the confirmed scope.
If both tasks are actually one quoted package, link both openings to one task and enter that package amount once.

Step-by-step use and practical review tips

  1. Gather the final contract, amendments, product and glazing labels, and measurements, then use consistent location names.
  2. Enter one physical window per row, its contract specification, actual entries, stage and unconfirmed details.
  3. Record evidence and the check date, then separately confirm specifications and finishing or operation.
  4. Link remaining work to each unfinished opening and enter actual VAT-inclusive quotes and contribution agreements.
  5. Review partial subtotals, overall budgets and pending reasons, then copy or print the review sheet for contractor follow-up.

When a family member visits the site on behalf of the owner, consistent location and evidence names help avoid counting the same window twice.
For staggered installation, preserve an intermediate result as a dated progress record rather than treating it as final completion confirmation.
After agreed changes or remediation work, update actual records and evidence and calculate again.

Do not perform hazardous exterior work or remove glazing merely to obtain a measurement.
Ask the responsible installer or a qualified professional for information that cannot be checked safely.
Keeping an item unconfirmed provides a clearer follow-up question than guessing that it matches or is complete.

Frequently asked questions

Does installation alone complete the review?

No: all five actual fields, matching contract entries, user specification confirmation, completed finishing, evidence and a date are also required.
A reconciled record is not certified quality inspection or legal acceptance.

Does a different glazing description or model prove a defect?

The calculator identifies recorded differences without deciding legal defects or performance superiority.
Check product documents and change agreements, then align the description basis.

Can identical windows share one opening row?

Use one row per physical window so delivery, installation and review can be tracked by location.
One remediation task can still link to several windows in a shared quotation.

Should I leave free remediation costs blank?

Blank means unknown rather than free.
Record confirmed zero unit prices, quote and VAT-included confirmation, evidence, a date and the contribution agreement.

How do I enter one quotation covering several windows?

Link all affected openings to a single task and enter the package amount once.
Do not repeat the same package price for each opening.

Why is the overall budget unknown when some costs are known?

An unfinished opening may lack a task, a price or VAT basis may be unconfirmed, evidence or overall scope may be missing, or a contractor contribution may still be unresolved.
A partial subtotal covers only confirmed tasks.

Can I deduct the remediation budget from the unpaid balance?

This tool does not calculate a legally deductible amount, a right to refuse payment or damages.
Do not treat the arithmetic budget and contribution agreement as a decision about payment obligations.

Does the calculator add VAT or inspect photographs?

Enter confirmed VAT-inclusive KRW amounts; no tax rate is applied.
Instead of uploading or automatically interpreting photographs, record retrievable evidence notes and check dates.

Sources, reference date and next steps

Official reference material was checked on 2026-11-16.
The Korea Fair Trade Commission interior-construction and window standard contract No.10079, initial edition dated 2018-03-21, provides context for scope and product specification records in Article 3, completion-to-contract confirmation in Article 4 and agreed changes in Article 8.
The initial edition was not established as the latest revision; check the applicable contract and current edition separately.

The National Law Information OPEN API returned the current Civil Act as ID001706, MST284415, Act No.21454, with statute-version effective date 2026-03-17.
That date does not mean Articles 665 and 667 were newly created then.
These provisions explain the boundary between budget arithmetic and legal questions; no statutory deduction or damages rate is applied.
For later use, recheck the law and contract edition, final product records, actual remediation quotes, contribution agreement and VAT-inclusive basis.

Use the ledger for a concrete contractor discussion

List unconfirmed openings and tasks, then ask the contractor to review the same locations and evidence.
Before signing a contract, use the per-opening window specification and installation quote comparison instead.
For legal remedy questions, check the scope of the construction defects and damages calculator; for unpaid construction amounts, see the construction payment claim and lien calculator.