Water Tank Cleaning Quote Comparison
Match the work scope. Compare cleaning, testing and outage costs in KRW.
Actual tax-inclusive quotes · KRW
Define the same tank and work
Compartments describe the scope; no automatic fee is added per compartment. For covered Korean facilities, separately check cleaning at least once each half-year.
Related calculators
- Korea Building Statutory Inspection & Training Deadline CalculatorOrganize Korean 2026 water-tank, indoor-air, asbestos, mechanical parking and playground inspection, training and reporting duties, with conditional fine estimates.
- Commercial Facility Integrated FM Outsourcing vs In-House TCO CalculatorCompare outsourced integrated facility management with an in-house team using monthly cash flow, nominal and present-value TCO, equivalent cost, break-even thresholds, and fixed stress cases.
- Korea Building Safety Inspection Cost CalculatorEstimate a Korean building regular inspection, detailed inspection, or detailed safety diagnosis fee from statutory person-days, 2026 engineering wages, overhead, technical fees, direct expenses, corrections, and VAT.
Compare water-tank cleaning quotes on the same scope
This calculator helps building owners, management offices and business operators compare two actual water-tank cleaning and disinfection quotations.
A lower price per cubic metre may exclude draining, sediment removal, laboratory testing or temporary water supply.
Start with a common tank scope, then identify what each supplier includes.
The result compares a known subtotal and conditional upper bound for one job and for the year.
All amounts must be actual tax-inclusive payments in Korean won.
If a quote states only a pre-tax amount, ask for the final payable figure before entering it.
Example amounts illustrate arithmetic; they are neither market prices nor statutory rates.
Tank material, access, contamination, staffing and safety arrangements must be reflected in a site-specific quote.
This tool does not certify water quality or worksite safety.
Legal context below is for South Korea, verified in 2026.
Set the common tank and annual job count
Enter the total capacity of all tanks covered by this quotation in cubic metres (m³).
The compartment count records the agreed scope; the calculator does not invent a surcharge per compartment.
If compartments have different sizes, use their combined capacity and confirm whether draining and refilling each one is covered.
A separately quoted compartment charge must be reflected in the basic fee or a relevant confirmed extra.
The annual job count is the number of equivalent jobs you are budgeting for under the same price and scope.
It does not determine whether the building is legally covered or deduct work already completed.
The planned date is a record, not a statutory deadline calculation.
When an allowed outage duration is supplied, each contractor must provide an estimated outage duration within that limit for the comparison to be eligible.
Confirm actual restoration arrangements and the affected water systems in writing.
Choose required work and its charging frequency
The checklist covers draining and residual water, sediment removal, internal washing, disinfection, a designated-lab water test, temporary water supply and outage notices.
The first five are initially selected as a review starting point.
Adjust this to the facility and the work being purchased.
Establish who pays for temporary water and notices, including work handled by another supplier or building management.
Agree responsibility for drained water and removed sediment.
Each task can be charged per job or once per year.
The designated-lab test initially uses once per year, which is a budget setting rather than an automatic legal decision.
If testing has already been completed and does not belong in this budget, deselect it.
Multiplying an annual lab fee by every cleaning can overstate the budget.
If retesting or additional sampling is contractually required, obtain and reflect that cost.
Previously entered amounts for deselected tasks are excluded.
Understand included, fixed extra and conditional cap
Included means the supplier covers the task within the basic fee, with no additional payment.
A fixed extra is a confirmed additional payment and increases the known subtotal.
A conditional cap is the maximum additional charge for a task whose occurrence or final amount is not yet fixed.
It increases the upper bound without increasing the known subtotal.
Enter the extra charge cap, not a second all-inclusive quote total.
Not included means a required task is absent from that quote; unknown means inclusion itself has not been confirmed.
Neither status is treated as free.
Known amounts remain visible, but the full upper bound stays unresolved while required scope or prices are missing.
If another supplier will perform missing work, confirm the amount before treating the common budget as complete.
A verified minimum fee of zero must be entered as 0; a blank minimum is not assumed to be zero.
Basic fee, one-job total and annual budget formulas
Basic fee = max(flat fee or total capacity × price per m³, minimum fee).
A volume rate may have two decimal places, and the calculated basic fee is rounded to whole won.
Flat fees and extras use integer won.
Commas are accepted during input, and the text being edited is retained.
Missing common tank conditions or an unconfirmed minimum leave the basic fee unresolved.
One-job known subtotal = basic fee + confirmed fixed extras.
Its full upper bound adds the conditional extra caps.
This one-job figure represents a job on which once-per-year items are also charged.
Annual known subtotal = basic fee × annual job count + the sum of each fixed extra × its frequency.
The frequency is the annual job count for per-job charges and 1 for once-per-year charges.
The annual upper bound adds conditional caps using the same frequencies.
Missing or excluded required work prevents a complete upper bound.
Worked example: compare the annual ranges
Assume 100m³, 2 compartments and 2 jobs per year.
Quote A charges KRW 5,000 per m³ with a KRW 400,000 minimum, giving a KRW 500,000 basic fee.
Draining adds a confirmed KRW 50,000 per job.
The designated-lab test adds KRW 100,000 once per year.
Temporary water may add up to KRW 80,000 per job; the remaining required tasks are included.
The one-job known subtotal is KRW 650,000 and its upper bound is KRW 730,000.
The annual known subtotal is KRW 1,200,000 and the annual upper bound is KRW 1,360,000.
Quote B has a KRW 620,000 flat fee, a confirmed zero minimum, and only the KRW 100,000 annual lab test as an extra.
Its one-job amount is KRW 720,000 and annual amount is KRW 1,340,000.
B lies inside the annual range for A, so the calculator does not establish a cheapest quote.
Ask A when temporary water charges arise and how much they would be.
In this example both contractor filings are confirmed; the allowed outage is 8 hours, with A estimating 6 hours and B estimating 5 hours.
Turn the result into a contract and outage plan
Read the completion status before comparing totals.
A known subtotal is not confirmation that missing tasks are covered.
When annual ranges overlap, neither supplier is necessarily cheaper.
The ranges separate only when one upper bound is below the other known subtotal.
Identical fully fixed annual totals are shown as equal.
A usable comparison also requires valid common conditions, complete required scope, confirmed contractor filing status and compliance with an entered outage limit.
The separate outage-response figure tracks extra charges for temporary water and notices.
It does not estimate an embedded share of the basic fee, lost sales or compensation.
Restaurants and retail tenants should first establish water needs, working hours and who must receive notices.
For compartment-by-compartment cleaning, align the outage scope and responsibility for confirming restored supply.
For a long-term contract, verify that the annual projection assumes unchanged prices and scope.
South Korean cleaning, inspection and record requirements
For covered buildings and facilities under Article 50 of the Enforcement Decree of the Water Supply and Waterworks Installation Act (수도법 시행령), Article 22-4 of its Enforcement Rule requires cleaning at least once each half-year and hygiene checks at least monthly.
New tanks, or tanks unused for at least one month, must be cleaned before use.
A half-year schedule is not simply six months after the last cleaning.
Coverage depends on building use, size, supply arrangements and applicable local rules; confirm with the water supplier.
Exceptional disaster-related deferrals cannot be applied at user discretion.
After-cleaning checks of residual chlorine, pH and turbidity after refilling are distinct from the designated drinking-water laboratory examination.
These are addressed separately in Article 22-4(3) and Article 22-4(4)–(5).
The lab examination is required at least once within the period ending on the last day of the month containing the one-year anniversary of the previous examination.
Its six items include microbiological testing.
Ask whether the disinfection scope includes post-cleaning checks and delivery of results, and agree responsibility for notifying users and handling noncompliant results.
Article 34 of the Act concerns acceptance of a water-tank cleaning business filing.
Check the supplier name against its filing documentation.
Article 22-5 of the Enforcement Rule also requires a cleaning supervisor on site when work is delegated.
Under Article 22-6, records of cleaning, hygiene inspections, water testing and remedial action must each be retained for 2 years.
The calculator does not query a licensing register: the confirmation option represents your own document check.
Use the form and return to your own draft
Enter common capacity, compartment count and annual job count, then choose required tasks and their frequency.
Complete the price method, minimum and task statuses for Quote A before switching to Quote B.
Keep a missing required task marked as not included until a revised quote resolves it.
The result shows known subtotals alongside unresolved items.
Changing common scope recalculates both quotes on the same basis.
Switching between quotes preserves the inputs for each supplier.
Opening the example preserves your existing form and position so that returning to editing restores your work.
After changing a price, also recheck required-task selections and per-job versus annual frequencies.
A supplier scope change needs updated inclusion and cap conditions as well as a new amount.
Before placing the order, verify the revised quote validity period and payment terms.
Frequently asked questions
Should I leave the minimum blank when there is none?
Enter 0 after confirming that there is no minimum.
A blank remains unknown and prevents a confirmed basic fee and complete upper bound.
Does a post-cleaning check replace the annual lab test?
The immediate checks and designated-lab examination have different statutory scope.
Confirm the type of test and report supplied, and check the obligations of the facility with the water supplier.
Why is the lab fee added only once annually?
That task is set to once per year.
Switching it to per job multiplies it by the annual job count.
Use the actual contract and testing plan.
How should I choose when the ranges overlap?
Confirm the trigger and amount of conditional extras first.
Then compare complete scope, outage duration and required documentation.
Does the planned date calculate a legal deadline?
It records your schedule.
Use the building statutory inspection and education deadline calculator and the relevant authority guidance for deadline checks.
Official sources and version date
Verified on 2026-11-19 for South Korea.
The Act is effective 2026-09-18 and its Enforcement Decree 2026-11-10.
The Enforcement Rule carries a 2026-07-01 overall effective date; individual Articles 22-4 to 22-6 used here are effective 2026-06-26.
Recheck amendments and facility coverage before ordering.
Request a revised quote for missing work
Send both suppliers the same capacity and scope, then clarify unknown tasks, test type, outage duration and business filing documents.
For schedule checks, also use the building statutory inspection and education deadline calculator.