Compare independent renovation inspection visit contracts
Different construction stages need attention on different days: after demolition, before concealed work is covered and at final handover.
A headline service fee does not tell a homeowner how many visits are included, how long each lasts, or whether photographs, reports and drawing reviews are included.
This calculator matches your required stages with actual vendor terms to expose extra charges and unconfirmed scope.
It serves homeowners, families arranging work from a distance, and operators commissioning renovations to a shop or small building.
Start with the stages you need covered and the dates when access is possible.
A lower quote that omits a critical visit is a different service, so read the stage-coverage results alongside the amount.
Results are in KRW, using the contract conditions you enter and the Korean context described below.
Match the scope before comparing prices.
Visit dates, inspection items, time allowances, deliverables and additional conditions matter more than the label “package” or “per visit.”
Do not substitute construction-cost percentages or statutory supervision fees for this private advisory service.
Build the required stage schedule first
Enter a quote-confirmation date, the contractual round-trip billing distance and the required visits.
Each stage needs a descriptive name, scheduled date, expected minutes and a decision on whether a report or drawing review is required.
Scheduled dates must be on or after the quote-confirmation date.
If the schedule changes, obtain confirmation again; the calculator does not choose technically appropriate inspection stages or construction sequencing.
One row means one visit
Create separate rows for separately billable visits, including return visits and two visits on the same day.
Describe the items you expect checked so that a confirmed visit refers to a defined task rather than a date alone.
The contractor and inspector must confirm when access to concealed work is possible.
Minutes and round-trip kilometres
Use minutes for duration and the contractually billable round-trip kilometres for distance.
The calculator never doubles the distance automatically.
Use the same distance basis for the free allowance and excess-kilometre rate; a map application may show a one-way journey instead.
The form supports 1–30 stage rows and 1–1,440 minutes per visit.
Confirm actual access dates rather than inventing dates for an undecided schedule.
Use stage names and quote notes to identify the drawings, construction photographs, material records or test results to be reviewed.
Those records help clarify the promised work but do not establish that all concealed conditions can be inspected.
Reconcile each vendor’s included work
Start with the base contract fee, included visit count and included minutes per visit.
For pay-per-visit terms, enter explicit confirmed zero for the base fee and included visits, then enter the actual visit rate.
A package base fee is counted once for the contract and is not repeated in every stage row.
Keep the quotation date, document version, contact and change or cancellation wording in the reference notes.
- Additional visits and overtime: identify the per-visit excess fee, overtime billing unit in minutes and charge per unit.
- Travel: confirm the free round-trip distance and excess charge per kilometre on every visit.
Put separately agreed parking, tolls or other conditions in the conditional-cost range and notes, without duplicating them elsewhere.
- Deliverables: mark required reports and drawing reviews as included, extra, unknown or excluded for each stage.
Enter the actual fee when they are extra.
- Changes and cancellations: enter actual chargeable event counts and fees.
These counts are independent of the scheduled visit count.
Confirm what “included” means: a few shared photographs may differ from a structured report with a delivery deadline and revision terms.
Clarify whether drawing review covers one stage or a broader set of documents.
The written-terms confirmation checkbox records your own check; it does not authenticate a professional qualification, legal authority or scope of liability.
Visit, overtime and travel formulas
Additional visits = max(0, confirmed visits − included visits)
Confirmed visits consume the allowance in date order, with original row order breaking same-date ties.
Overtime units per visit = ceil(max(0, required minutes − included minutes) ÷ overtime unit minutes)
Round up separately for each visit, then add the charges.
Do not pool excess minutes across visits.
Travel per visit = round(max(0, round-trip billing km − free round-trip km) × excess-km rate)
Round each visit’s travel charge to a whole won.
Stage details show additional-visit, overtime, travel and required extra-deliverable charges.
With 60 included minutes and 30-minute overtime units, a 60-minute visit uses zero overtime units, 61 or 90 minutes uses one, and 91 minutes uses two.
Two 61-minute visits each use one unit; their two excess minutes are not pooled into one charge.
If a vendor sells shared hours or a daily bundle, obtain written terms on a compatible billing basis rather than assuming this formula applies.
Keep known amounts separate from complete totals
A blank price means unknown; zero means explicitly confirmed free or no charge.
If an additional visit occurs but its fee is blank, the known subtotal still includes confirmed base and travel amounts, while the missing visit price stays unknown.
If no additional visit occurs, an unused blank additional-visit rate does not create an unknown cost.
A subtotal containing only known amounts is not a complete contract price.
Scheduled-scope gross amount
This appears when every incurred price and the tax basis for currently confirmed visits are known.
It can still omit an unconfirmed required visit or deliverable.
Check stage coverage independently before treating two prices as comparable.
Conditional lower and upper amounts
Enter the known bounds for additional conditions on the same tax basis as the quote.
A blank upper amount remains unknown, not zero and not consent to unlimited billing.
The range is a scenario within the entered scope, not an automatically guaranteed contractual cap.
Do not replace unknown fees with a market average or turn an excluded report into free included work just to obtain a total.
Use unknown items as questions for the vendor.
New stages and work outside the entered conditions require a fresh quotation, and a legally binding cap must be confirmed separately in the written contract.
Put VAT-inclusive and VAT-exclusive quotes on one basis
For a tax-inclusive quotation, the tool adds no further tax.
For an exclusive quotation, enter the applicable rate yourself; it is applied once to the aggregate and rounded to a whole won.
Unknown tax treatment, or an exclusive quotation with a blank rate, withholds the gross total while preserving the entered-basis known subtotal.
If a single quote mixes inclusive and exclusive line prices, request a revised quotation on one consistent basis first.
Gross amount for an exclusive quote = round(entered total × (1 + entered rate ÷ 100))
For each conditional bound, add that bound to the entered total before applying the same tax calculation.
The general 10% rate in Article 30 of the Korean Value-Added Tax Act was verified, but the calculator does not determine whether the individual service is taxable or prefill that rate.
The 10% used in the synthetic example below is an entered quotation assumption.
Confirm the supplier’s tax treatment, supporting invoice and amount basis before calculating.
Synthetic example: KRW 985,000 versus KRW 990,000
These figures demonstrate arithmetic and are not market prices or recommended contract terms.
The quote-confirmation date is 2026-11-18; visits are on 2026-11-20, 2026-11-25 and 2026-11-30 for 60, 90 and 60 minutes, with 40km of round-trip billing distance.
Every stage requires a report, and the first stage also requires drawing review.
Synthetic vendor A: two included visits
The base is KRW 600,000 with 60 minutes per visit.
Add KRW 200,000 for the third visit and KRW 25,000 for one 30-minute overtime unit on the second visit.
With 20 free round-trip kilometres and KRW 1,000 per excess kilometre, travel is KRW 20,000 per visit or KRW 60,000 in total.
The final report costs KRW 50,000, first-stage drawing review KRW 30,000 and one chargeable change KRW 20,000.
The scheduled-scope tax-inclusive amount is KRW 985,000.
Synthetic vendor B: three included visits
The KRW 900,000 base includes all three visits, 90 minutes per visit, 40 round-trip kilometres and required deliverables.
One change is confirmed free.
An entered tax-exclusive 10% rate gives KRW 990,000 gross.
Other conditional costs are confirmed zero.
If A has conditional extras of KRW 0–100,000, its range is KRW 985,000–1,085,000, overlapping B’s KRW 990,000.
The tool therefore withholds an overall lowest-cost candidate.
If A’s conditional extras are later confirmed in writing as zero to zero, and all scope and terms checks are complete for both vendors, A is lower by KRW 5,000 throughout the entered ranges.
Use the results to request written clarification
- Build one common schedule. Name the required inspection items and deliverables and confirm access before the work is covered.
- Enter actual quotation terms. Match visits, time, distance, fees, changes, cancellations and tax treatment to each vendor’s stage offer.
- Read the detail and withheld decisions. Locate the stage causing additional visits, overtime or travel and identify missing reports, reviews and prices.
- Review the export before contacting a vendor. TXT saving and printing include the full inputs, conditions, results and clarification checklist.
Saving creates a local browser file and does not automatically send it to a vendor.
- Recalculate after answers or changes. A different date or requirement invalidates the basis for an earlier confirmation; obtain updated written agreement.
Practical decisions beyond the headline price
A homeowner living far away
Check whether visits cover the necessary stages, not simply whether the visit count looks generous.
A report arriving after the next construction stage may be too late for your intended discussion.
Confirm delivery timing and who explains findings; photographs alone do not establish the condition of every concealed element.
An operator with changing work dates
Separate change fees from return visits and cancellation charges.
A cancelled visit with a cancellation fee is not an active visit as well.
Confirm night, holiday or specialist-review work in the notes and conditional range if it falls outside the standard entered terms.
Even comparable price ranges do not measure report quality, communication, professional competence or liability terms.
When amounts are close, check practical availability and responsibility for following up with the contractor.
A lowest-cost candidate is a statement about the entered price ranges, not an endorsement of a vendor or an instruction to sign a contract.
Private advisory inspection and statutory supervision
This tool reconciles private confirmation and advisory service visit/report fees.
It does not determine or replace statutory construction supervision, appointment requirements or authority under Article 25 of the Korean Building Act.
It does not certify workmanship, structural, electrical or waterproofing safety, defects, repairs or compensation liability.
- Multiple sites, daily bundles, pooled visit time and automatic contract-specific discounts are outside this model.
Request written compatible terms rather than silently converting them.
- Do not remove a necessary but unknown visit to produce a lower total.
Keep it visible as a scope gap and request confirmation.
- Arrange site access, drawing and photograph sharing rights, privacy, security and authorised recipients separately.
- Agree who communicates findings to the contractor and whether follow-up inspection incurs another fee.
Hiring a private inspector does not automatically change the contractor’s construction or defect responsibility.
Frequently asked questions
Does this calculator provide market inspection prices?
It reconciles actual written quotations against your required visit schedule.
It contains no price per floor area or percentage of construction cost.
A similar contract total does not establish equal expertise, deliverables or responsibility.
Can I compare a package with a pay-per-visit contract?
Yes.
For a package, enter its base fee, included visits and additional-visit rate.
For pay-per-visit terms, enter confirmed zero for the base fee and included visits, then the actual visit rate.
Both vendors must cover the same required stages and deliverables.
How do I enter two visits on one day or a return visit?
Create a separate stage row for each separately billable visit.
Two rows on the same date count as two visits.
The model does not pool time across visits or apply daily bundles; request a written quotation on this billing basis if your contract differs.
Are missing reports automatically priced?
A report is charged only when it is required, marked extra and has an entered fee.
Excluded or unknown reports remain a scope gap.
Reports and drawing reviews at an unconfirmed or excluded visit are not treated as a completed service or silently charged.
How does blank differ from zero?
Blank means unknown.
Zero means an explicitly confirmed free charge or no charge.
An unused rate can stay blank without creating an unknown cost, but a blank rate for an incurred additional visit prevents a complete total.
Is the conditional upper amount a guaranteed final bill?
No.
It is a scenario using the additional conditions and upper amount you entered.
A blank upper bound remains unknown.
New work outside the entered scope requires a separate agreement, and a contractual cap must be confirmed in writing.
Does the tool determine cancellation rights or refunds?
It multiplies actual chargeable change or cancellation counts by confirmed per-event fees.
It does not calculate statutory cancellation percentages, termination rights, refund eligibility or repayment of prior payments.
Remove a cancelled visit from the active schedule and enter its cancellation charge separately.
Why is there no lowest-cost candidate?
Selection is withheld if required visits or deliverables, prices, tax, written terms or conditional bounds remain unknown, or if complete cost ranges overlap.
A candidate appears only when its upper bound is strictly below every other lower bound.
A tie does not establish a price advantage.
Primary sources and review date
Sources were checked on 2026-11-18 for the 2026 Korean context; amounts are in KRW.
The provider’s public material supports the service structure, not a universal rate.
Recheck the actual quotation version, visit scope, deliverables, authority, extras and tax treatment for each contract.
- LAYER92 inspection service description: stage visits, document review and reporting as private confirmation and advice.
Use the actual agreed fee after consultation; the advertised light-service KRW 0 is not a free default or a market-rate assumption.
- Building Act Article 25, effective-date text: law ID001823, MST288701, Act No21880, promulgated 2026-08-11, effective 2026-11-12.
Used to distinguish statutory supervision from this private contract calculation.
- Value-Added Tax Act Article 30: law ID001571, MST276117, Act No21065, promulgated 2025-10-01, effective 2026-01-02.
The general rate is 10%; applicability to the individual service is not determined here.
Request a quote with named visits and report terms
Gather the unknown visits, fees, deliverables and change conditions and ask each vendor to confirm them in writing.
Recalculate on the same scope once those answers arrive to identify extra charges and scheduling gaps hidden by base-fee comparisons.
Use the related tools separately when the decision concerns construction quantities or remedial work rather than the independent inspection service.