Korea Geotechnical Survey Actual Quote Budget

Reconcile expert-approved borehole depths, surcharge intervals and test quantities against an actual written quote, including mobilization, closure, reporting and VAT in KRW.

Use an expert-approved survey plan and actual written quote. This tool does not determine adequate borehole count, depth, bearing capacity, or foundation type. Results use Korea-based KRW on a VAT-inclusive basis. Blank values are unknown, not zero.

1. Plan and quote records

2. Approved borehole depths

BH1

One surcharge row uses the total length automatically. Add segments for different ground-category rates, then enter each length and price in the ledger. Segment lengths must add up to this borehole’s surcharge total.

3. Drilling, tests, and ancillary quote ledger

Base drilling uses the full depth; surcharge applies only to the approved additional interval. Enter a bundled price once as an other / bundled item and link covered rows to it. Different plan and quote units are not automatically converted. Keep suppliers and VAT bases consistent.

1. BH1: drilling

Planned quantity uses the linked borehole depth / surcharge interval.

Plan unit: m

2. BH1: surcharge

Planned quantity uses the linked borehole depth / surcharge interval.

Plan unit: m

3. Test from approved schedule

Plan unit: test

4. Mobilization / access

Hole units use borehole count; lump / set use 1; closure in m uses total depth.

5. Borehole closure / reinstatement

Hole units use borehole count; lump / set use 1; closure in m uses total depth.

6. Survey report

Hole units use borehole count; lump / set use 1; closure in m uses total depth.

Related calculators

Reconcile a geotechnical survey quote against an approved plan

For a property owner or small business preparing a building project in Korea, a drilling base price can hide important differences in scope.
Individual borehole depths, ground-related surcharge lengths, field and laboratory tests, equipment mobilization, borehole closure and restoration, and the final report may appear elsewhere or be omitted.
Establish whether a lower quote covers the same work before comparing its total.

This Korea-based 2026 calculator checks quantities and actual quoted prices against a plan already confirmed by a qualified professional.
It keeps a record for each borehole and matches planned work to the billing quantities and units in a supplier quote.
Documented prices contribute to the confirmed subtotal, while missing scope prevents a complete budget from being presented.
Conditional extras appear separately so a possible future charge is distinguishable from the amount currently confirmed.

Confirm the investigation plan first. This tool does not determine the appropriate number or location of boreholes, drilling depths, test intervals, bearing capacity, or foundation type.
A successful quantity reconciliation does not certify engineering adequacy, site safety, or permit compliance.
Ask the responsible professional to review an unconfirmed plan before using it as a contract basis.

Prepare the plan, quote, and confirmation dates

The professionally confirmed plan

Have the plan reference or file name, confirmation date, borehole identifiers, depth of each hole, surcharge lengths, and test names and quantities ready.
Keep a change record if borehole identifiers or depths have changed.
A total drilling length alone can conceal how the work is distributed between holes, so obtain the individual allocation before entering it.

An actual quote for the same scope

Record the supplier and quote reference, confirmation date, quantities, units, unit prices, VAT basis, and written inclusions and exclusions.
Leave a verbal price unknown until it is documented.
Entering a date does not establish that a price remains valid; confirm the start date, validity period, and change conditions with the supplier.

Use one consistent quote and VAT basis in each calculation.
Mixing VAT-inclusive lines from one supplier with VAT-exclusive lines from another can produce an apparently comparable total that represents a different cash requirement.
Keep the plan and quote identifiers in the reconciliation text when requesting a revision so the supplier can identify the exact documents being compared.

Understand borehole depths and ground surcharges

A borehole depth is the planned base drilling quantity for that specific hole.
Two holes of 20m and 30m produce a total depth of 50m, but the individual records remain necessary when a depth or quoted scope changes.
Use identifiers that can be traced to the drawing and quote; leave an unknown depth unresolved rather than replacing it with an assumed average.

Apply a surcharge only to its recorded length

A surcharge length is the portion for which an additional ground-related rate is expressly confirmed in the quote.
For a 20m hole with a 5m surcharge section, reconcile 20m of base drilling plus 5m of additional charges.
The surcharge length cannot exceed the hole depth, and the surcharge does not replace the base drilling price.
Add separate surcharge segments under the same borehole to preserve different ground-category lengths and rates.
A single surcharge row uses the borehole total automatically; with two or more rows, their individual planned lengths must sum to that total.
Missing lengths or a different segment sum keep the complete budget pending.
Check overlapping intervals and actual surcharge conditions against the expert-approved plan and written supplier scope.

Copy each test name and quantity from the confirmed investigation plan.
The calculator does not infer a standard penetration test frequency or a laboratory sampling schedule from total depth.
Tests with similar names can include different deliverables, sample transport, or analysis scope; record those differences in the item name and written evidence.

Match planned units to quoted billing units

  • Per meter: Compare drilling depth and surcharge length with quantities quoted in m.
    Check whether the price is KRW/m or KRW/borehole before copying it.
  • Tests and boreholes: Compare tests with the recorded count, and per-hole closure work with the total number of boreholes.
    Do not use a fractional quantity for an item billed as an indivisible count.
  • Lump sums: Enter the package price once as an other/lump-sum item and link the included drilling, testing, and ancillary lines to that priced item.
    Written inclusion evidence is needed to prevent the same package from being added twice.
  • Different units: A plan measured in meters cannot be automatically reconciled with a per-hole quote.
    Ask which depth the per-hole amount covers and document a package inclusion or obtain a revised quote in matching units.

A quoted quantity below the required quantity blocks a complete budget even when the known portion has a price.
If the quote bills more than the required quantity, the calculator uses the quoted billing quantity rather than silently reducing the charge to the plan quantity.
Ask whether the excess represents a minimum billable amount or an allowance before signing.

Check mobilization, closure, restoration, and reporting

Equipment and site conditions

Confirm whether mobilization is separate or included in drilling prices.
Add access-related transport, equipment moves, waiting time, or remobilization only when those charges are supported by the actual contract.
This tool does not assess site access or select equipment; an unresolved condition should remain conditional or unknown.

Closure and deliverables

Check which price covers borehole closure, surrounding restoration, generated material handling, logs, test results, and the investigation report.
Check whether billing is per hole or lump sum; a per-meter closure quote must be reconciled with total depth.
These are contract omission checks, not a declaration of universal statutory duties or a method specification for every site.

If an ancillary item has been confirmed unnecessary, use a permitted not-required status and record the reason.
Required drilling and tests cannot be omitted merely to reduce a displayed price.
When a supplier says an item is included, identify the directly priced package and retain the written scope so the basis remains clear when invoicing begins.

Calculation formula and Korean VAT basis

Line amount = quoted quantity × actual unit price × VAT factor

The factor is 1 for a VAT-inclusive quote and 1.1 when the user confirms an ordinary taxable, VAT-exclusive quote.
Each VAT-inclusive line amount is rounded to whole KRW before aggregation.
This is a budget display convention; it does not establish tax-invoice rounding or determine tax treatment.

Article 30 of the Korean Value-Added Tax Act provides the standard 10% rate.
The verified version is MST276117, effective 2026-01-02, checked on 2026-11-16.
The calculator does not add another 10% to an amount that already includes VAT, and an unknown VAT basis prevents a complete total.
Exempt, zero-rated, and special transactions require separate confirmation rather than an automatic tax classification here.

An included line is counted through its directly priced package once, without adding the same charge again.
Conditional charges are separated at their documented amount without a probability estimate.
Dates and prices come from the documents you enter; no national average or local market rate is supplied.

Check a fictional worked example

The following fictional example explains the arithmetic and is not a market price guide.
The two holes are 20m and 30m deep, with surcharge lengths of 5m and 0m, and all prices are assumed confirmed as VAT-inclusive KRW.

Fictional VAT-inclusive geotechnical investigation quantities and charges
ItemQuantityUnit price · KRWAmount · KRW
Base drilling combined50m100,0005,000,000
Ground surcharge length5m50,000250,000
SPT tests10 tests30,000300,000
Mobilization1 lump sum500,000500,000
Closure and restoration2 holes100,000200,000
Report1 lump sum300,000300,000
Confirmed subtotal——6,550,000

When a conditional charge remains

Add a documented conditional site-work charge of 200,000 KRW for one lump-sum item.
The confirmed subtotal remains 6,550,000 KRW, the conditional addition is 200,000 KRW, and the scenario total is 6,750,000 KRW.
The confirmed total remains pending while a conditional line exists.
Remove that conditional line and confirm every remaining scope item to obtain a confirmed total of 6,550,000 KRW.
If all these fictional prices instead exclude VAT on an ordinary taxable basis, the base total is 7,205,000 KRW and the scenario total is 7,425,000 KRW.

If a test quantity or the report scope becomes unknown, known prices may remain in the partial subtotal while the complete budget becomes pending again.
When replacing the example with your own quote, recheck quantities and written inclusions as well as the amounts.

Use the tool and interpret the results

  1. Enter the plan and quote references and dates, and confirm whether a professional has approved the plan.
  2. Enter each borehole depth and surcharge length, then add the planned test names and quantities.
  3. Copy quoted quantities, units, and prices; distinguish priced, package-included, conditional, and unknown lines.
  4. Check mobilization, closure, restoration, reporting, and the VAT basis before calculating.
  5. Read the missing-item list first, then review the subtotal and conditional additions separately.
    Copy the reconciliation text, or select it manually, to request a revised quote.

The confirmed subtotal is the sum of currently documented prices on a known basis.
A confirmed total requires a confirmed plan, complete required scope, and no conditional lines.
A scenario total assumes the listed conditional charges occur after all unknowns have been resolved; it is not a maximum-loss cap or an agreement prohibiting other charges.
A pending result identifies which evidence is missing rather than implying that a useful budget can never be prepared.

Keep unknown values separate from confirmed zero

A blank unit price means the price is unknown.
It differs from a documented free-of-charge item entered as zero KRW.
If a service is included in a package, linking it to the actual priced item with written scope evidence gives a clearer audit trail than treating it as an unrelated zero-price line.

A unit mismatch, insufficient quoted quantity, missing drilling or surcharge line, unknown VAT basis, or missing inclusion evidence prevents a complete budget.
Invalid dates, negative or nonfinite numbers, and surcharge lengths exceeding borehole depth require corrected inputs.
After changing a record, compare the revised plan with the actual quote before calculating again rather than relying on an earlier confirmation.

Avoid double counting a shared package

If testing and reporting share one lump-sum quote, count the package only once.
An included item pointing to another included item, itself, or a nonexistent record does not establish a clear pricing basis.
Select a directly priced item and preserve the supplier’s written description of its inclusions.

Practical situations for owners and small businesses

Normalize scope before comparing suppliers

A per-hole package and a per-meter quote cannot be compared solely by their headline amounts.
Obtain written confirmation that each covers the same approved plan, borehole depths, and tests, then calculate each quote separately.
This calculator does not rank suppliers or guarantee work quality.

Request a revision after a plan change

Once a depth increase or test change has been confirmed, use the revised quantities and the uncovered portion of the previous quote to request a new breakdown.
Distinguish an agreed additional price from a charge dependent on site conditions, and check for overlap with the existing package.
Do not conceal unknown scope with an arbitrary contingency amount.

Geotechnical investigation is one part of a construction budget.
For the wider project, use the detached-house construction cost calculator while checking that investigation costs already included in another allowance are not added again.

Frequently asked questions

How many boreholes should I use?

A qualified professional must decide borehole number, location, and depth for the actual site and purpose.
This calculator reconciles approved quantities and prices; it does not recommend borehole counts or test intervals.

Can I use an unconfirmed plan?

You can organize inputs and review known portions, but the complete budget remains pending.
Do not use provisional quantities as a confirmed contract scope; recheck all linked items after the plan is approved.

Does the surcharge length reduce base drilling depth?

No.
The calculation adds the confirmed surcharge length to the cost of drilling the entire base depth.
If your contract follows a different structure, request a consistent itemized breakdown instead of altering rates arbitrarily.

How do I enter a package that includes tests and a report?

Record its price once as an other/lump-sum item and link the detailed lines as inclusions.
Obtain written evidence that the package covers the specified test types, quantities, and report scope.

Are a zero price and a blank price the same?

No.
Blank means unknown.
Zero represents a confirmed zero charge or free service and requires evidence before it can be treated as a known amount.

Are conditional charges probability-weighted?

No probability is estimated.
Documented conditional charges are added separately at their full listed amount and used unchanged in the scenario total.
The result is not a cap on every possible additional cost.

Is 10% VAT always added?

VAT is not added again to an inclusive quote.
The 10% factor applies only when the user confirms an ordinary taxable, VAT-exclusive basis; an unknown basis keeps the total pending.
Exempt and zero-rated transactions require separate review.

Does a confirmed budget prove the investigation is adequate?

No.
Quantity and price reconciliation differs from engineering and safety review.
Ask the responsible professional about bearing capacity, foundation type, additional investigation needs, and actual execution methods.

Official sources and verification date

Sources were checked on 2026-11-16 for this Korea-based 2026 page.
The Korea Rural Community Corporation Hongsan drainage improvement detailed-design task specification, 2026.3 edition, pages 51–53, supports checking plan approval, borehole depth, test planning, and report scope.
It is a project-specific document, not a national price schedule or a universal quantity and contract specification.

No fixed market rates, appropriate investigation quantities, or site-specific mobilization and closure charges are taken from these sources.
Recheck borehole depths, test quantities, inclusions, dates, and VAT basis whenever the plan or quote changes, and review the applicable legal version if the law or transaction type changes.

Attach the approved plan and request an itemized revision

Start with the unresolved boreholes, tests, and ancillary items in the results.
Send the plan reference and date together with borehole depths, test quantities, billing units, and inclusion questions so the supplier can identify exactly what needs clarification.
When the revision arrives, check its written conditions and VAT basis as well as the changed prices before calculating again.