Promotional Goods MOQ & Imprint Quote Comparison

Match distribution quantities, product specifications and logo requirements across two supplier quotes.
Compare MOQ, price tiers, plates, packing and shipping in KRW, then save a review checklist.

Initial inputs are fictional examples for explaining the calculation. Replace them with original supplier quotes. All amounts are KRW; tax rates and defect percentages are your confirmed terms or assumptions.

Required arrival and product requirements

Both suppliers must satisfy every item under matched conditions before comparing bundled totals. Mixed-supplier optimization is outside this model.

Item 1

1–1,000,000

0–100

0–50

Required product, logo and imprint specifications

0–8

0–16

Record the exact model, material, size and logo revision. For unprinted products, use matching “not applicable” labels for logo/method. Defects are a user assumption, separate from exact-quantity delivery terms.

Supplier A
Check quoted product, logo and imprint specifications

0–8

0–16

Match the exact required labels. Plate count is not inferred from locations × colors.

1–1,000,000

1–1,000,000

Quantity tiers: product unit price (KRW)

The selected tier price applies to every ordered item. Do not add included imprint charges again.

1–1,000,000

0–1,000,000 · confirmed free/included = 0

1–1,000,000

0–1,000,000 · confirmed free/included = 0

Plates, additional costs and VAT basis

Blank means unknown; enter 0 only when included/free is confirmed. Normalize all charges to one VAT basis. Enter shared shipping or other common costs once, in one item or allocated across items. Amounts are KRW; unit prices allow two decimals.

0–1,000 · confirmed free/included = 0

0–1,000,000,000 · confirmed free/included = 0

0–1,000,000,000 · confirmed free/included = 0

0–1,000,000,000 · confirmed free/included = 0

0–1,000,000 · confirmed free/included = 0

0–1,000,000 · confirmed free/included = 0

0–1,000,000,000 · confirmed free/included = 0

0–1,000,000,000 · confirmed free/included = 0

0–100 · confirmed free/included = 0

Supplier B
Check quoted product, logo and imprint specifications

0–8

0–16

Match the exact required labels. Plate count is not inferred from locations × colors.

1–1,000,000

1–1,000,000

Quantity tiers: product unit price (KRW)

The selected tier price applies to every ordered item. Do not add included imprint charges again.

1–1,000,000

0–1,000,000 · confirmed free/included = 0

1–1,000,000

0–1,000,000 · confirmed free/included = 0

Plates, additional costs and VAT basis

Blank means unknown; enter 0 only when included/free is confirmed. Normalize all charges to one VAT basis. Enter shared shipping or other common costs once, in one item or allocated across items. Amounts are KRW; unit prices allow two decimals.

0–1,000 · confirmed free/included = 0

0–1,000,000,000 · confirmed free/included = 0

0–1,000,000,000 · confirmed free/included = 0

0–1,000,000,000 · confirmed free/included = 0

0–1,000,000 · confirmed free/included = 0

0–1,000,000 · confirmed free/included = 0

0–1,000,000,000 · confirmed free/included = 0

0–1,000,000,000 · confirmed free/included = 0

0–100 · confirmed free/included = 0

Order totals and comparison conditions

Supplier A · All-item total

770,000 KRW

Entered comparison conditions met

Supplier B · All-item total

649,000 KRW

Entered comparison conditions met

Under the entered conditions, supplier B costs 121,000 KRW less.

Item 1

Required distribution: 500 · Target usable with reserve: 500 · Production needed after assumed defects: 500

Quantities, itemized costs, totals and effective unit costs for both suppliers
MetricA · AB · B
MOQ / pack-rounded order1,000500
Extra order beyond production need5000
Assumed usable / spare after distribution1,000 / 500500 / 0
Applied unit price / threshold500 KRW / 1,000900 KRW / 1
Product cost / price tier500,000 KRW450,000 KRW
Confirmed plates / plate price50,000 KRW40,000 KRW
Sample cost20,000 KRW20,000 KRW
Artwork cost0 KRW0 KRW
Additional imprint charge0 KRW0 KRW
Individual packing100,000 KRW50,000 KRW
Shipping cost30,000 KRW30,000 KRW
Other cost0 KRW0 KRW
Line subtotal before added VAT700,000 KRW590,000 KRW
Added VAT (included quotes: no addition)70,000 KRW59,000 KRW
Order total770,000 KRW649,000 KRW
Effective cost per required item1,540 KRW1,298 KRW
Cost per ordered item770 KRW1,298 KRW

A · Next tier and review checklist

No higher price tier was entered.

Entered specification, arrival and cost checks passed. Actual delivery and quality remain contractual matters.

B · Next tier and review checklist

Next tier: 1,000 (+500) · Unit price 450 KRW · Total 704,000 KRW · Change from current +55,000 KRW
Cost reference for a larger order. Reconfirm quantity terms and arrival.

Entered specification, arrival and cost checks passed. Actual delivery and quality remain contractual matters.

Next: request aligned written quotes for logo locations, colors, actual plates, quantity, arrival and included costs. Assumed defects differ from production over/underrun policies. Lines round to whole KRW; VAT arithmetic uses only your quoted basis.

Compare the cash needed to distribute your promotional goods

A low advertised unit price can hide a larger minimum order, logo setup, individual packing and freight charges.
A lower unit price obtained by purchasing many more products does not necessarily reduce the cash needed for your event.
This calculator compares actual supplier A and B quotes against the same product, logo scope and required arrival date, then calculates total order cost and effective cost per required distribution unit.

Prepare the quote and approved specification

Have the product specification, logo revision, printing method, sides and colors, MOQ, pack size, quantity price tiers, actual plate count, additional charges and promised arrival date ready.
Starting values are fictional examples, not current supplier prices or market averages.
Leave unconfirmed charges unknown rather than assuming that they are free.
All monetary values use KRW; the model and reference pages were checked on 2026-11-16.

Small business owners, store operators and event organizers can use the comparison to identify missing charges before committing household or business funds.
The next step is a revised written quote on identical terms, supported by the saved TXT review or printed results.

Match the product and logo printing scope first

Product, logo revision and printing method

Describe the model, material, dimensions and color sufficiently to identify the required product.
Record the approved logo revision and supplier-confirmed printing method, rather than relying on a vague file name or product description.
Resolve differences in included printing, accessories and packing before comparing prices.

Sides, colors and actual plate count

Sides and colors describe the required print scope; actual plate count is a separately confirmed quantity for calculating setup charges.
Do not assume that sides × colors is a universal plate-count formula or that every printing method requires plates.
Use the actual quoted count and plate charge, and enter zero for an additional charge confirmed as included or absent.

Text is trimmed and compared exactly; similar descriptions are not automatically treated as equivalent quality or specification.
If differently worded alternatives are genuinely equivalent, obtain supplier confirmation and normalize both quotes and the common requirement to the same description.
Choosing between different materials or printing methods is a separate decision from comparing prices for the same product.

From distribution need to an MOQ and pack-rounded order

Required distribution N is the number you intend to give away or use.
Reserve percentage r increases the usable quantity needed for extra attendees or operating reserves; defect assumption d increases production quantity to allow for assumed unusable units.
The percentages apply at different stages and are not simply added together.
The defect assumption is neither a supplier production overrun/underrun policy nor a guaranteed usable yield.

Quantity formulas

Target usable T = ceil(N × (1 + r / 100))
Required production P = ceil(T / (1 − d / 100))
Order Q = ceil(max(P, MOQ) / pack size) × pack size
Surplus order = Q − P
Assumed usable units = floor(Q × (1 − d / 100))
Usable reserve after distribution = assumed usable units − N

ceil means round up to an integer; floor means round down.
The order must cover both required production and MOQ, then reach a whole pack multiple.
For example, production need 501, MOQ 500 and pack size 50 produce an order of 550 units.
The extra 49 units are not assumed to generate a refund, resale income or other economic value.

The application accepts up to four products, reserve assumptions from 0–100% and defect assumptions from 0–50%.
These are application input bounds, not manufacturing standards or acceptable defect levels.
Confirm exact-quantity delivery, short-delivery settlement and remake terms separately, especially when an event depends on receiving a specific usable quantity.

Check price tiers and the next discount threshold

Enter each actual tier as a starting quantity and unit price.
The greatest starting quantity no higher than Q selects one price for the entire order.
The model does not progressively add separate prices for quantities in earlier and later blocks.
If the supplier uses block pricing, request a suitable whole-order quote before using this model.

Choose the price after rounding

MOQ or pack rounding can move the actual order into a lower-price tier even when the original requirement was below that threshold.
Use the price applicable to Q rather than the unrounded need.
Duplicate thresholds or an order without a covering price tier require correction or further supplier confirmation.

Compare the next tier by total cash

The next higher threshold is rounded to a whole pack, its applicable price is selected again, and all quantity charges and VAT are recalculated.
Read the additional quantity together with the difference from the current total.
A lower unit price can still require more cash, so the next tier is not an automatic recommendation to increase the order.

If several thresholds fall inside the same pack multiple, the price at the quantity actually reached is used.
The comparison assumes other entered charges remain unchanged; reconfirm the revised quantity and promised arrival with the supplier.
Obtain a revised quote when a larger order changes setup, freight, packing or any other contract term.

Separate setup, quantity charges, freight and VAT basis

  • Product charge: Q × the selected unit price.
    Do not add basic logo printing again when the product price already includes it.
  • Plate and fixed charges: actual plate count × plate charge, plus samples, design, shipping and other order-level amounts.
    Use the charge actually quoted for this order, including confirmed reuse or sample-fee adjustments.
  • Quantity extras: round(Q × additional printing per unit) + round(Q × individual packing per unit).
    Each product, plate, printing and packing multiplication is rounded separately to whole KRW; unit prices accept up to two decimal places.
    Do not multiply an already confirmed printing rate by sides or colors again.
  • Shared charges across products: allocate a common sample, design or delivery charge once using supplier-confirmed amounts.
    Entering the same shared charge for every item would duplicate it.

Use one VAT basis throughout each quote

If every entered amount includes VAT, their sum is the total; embedded tax is neither split out nor added again.
If every amount excludes VAT, VAT = round(sum × user-confirmed rate / 100), and total = sum + VAT.
round means nearest whole KRW for this calculation; reconcile the result with the supplier’s actual invoice and settlement rounding.
Ask the supplier to normalize a quote that mixes inclusive and exclusive amounts.

The calculator does not determine tax applicability or a statutory rate in Korea or another jurisdiction.
The rate is a user-confirmed contractual input, and 10% below is a fictional example rather than a statutory default.
Unknown VAT inclusion or a missing rate for an exclusive quote prevents a final total from being confirmed.

How to compare two promotional goods quotes

  1. Set the distribution plan: enter the required arrival date, item quantities, reserve and defect assumptions.
    Allow for inspection and sorting rather than using the event date without preparation time.
  2. Write the common specification: match the product, approved logo, printing method, sides and colors.
    Confirm an unresolved requirement with the suppliers first.
  3. Transcribe A and B: record quote references, check dates, actual MOQ, pack size, tiers, plate count, charges and promised arrival.
    Select confirmation only after checking the original and exact-quantity delivery/settlement terms.
  4. Preserve unknowns: leave an unconfirmed charge blank and enter zero only for a confirmed included or free item.
    Review the missing-information list and obtain answers before making a final comparison.
  5. Save and request revised quotes: read totals, effective distribution cost, surplus and next-tier differences, then save the TXT review or print it.
    Editing inputs hides previous results; calculate again using the revised terms.

You can add up to four products, such as towels and tumblers, each with its own MOQ and tiers.
The portfolio comparison covers ordering every item from A versus ordering every item from B.
A mixed-supplier purchase may change shared freight and discounts, so request a separate quote for that arrangement.

Worked fictional example: distributing 500 units

Assume N = 500 and both reserve and defect assumptions are 0%.
Both suppliers match the approved product, logo, print scope and arrival requirement, and their original quotes and exact-quantity terms have been checked.
Every price and the exclusive 10% VAT input below is fictional; it is not a market quote or statutory-rate statement.

Fictional supplier A and B order comparison for 500 required distribution units in KRW
ItemSupplier ASupplier B
MOQ / pack size1,000 / 50 units500 / 50 units
Order × selected unit price1,000 × 500500 × 900
Product charge500,000450,000
Plate charge2 × 25,000 = 50,0002 × 20,000 = 40,000
Samples / shipping20,000 / 30,00020,000 / 30,000
Individual packing1,000 × 100 = 100,000500 × 100 = 50,000
Entered sum / fictional VAT 10%700,000 / 70,000590,000 / 59,000
Total order cost770,000649,000
Effective cost per required unit1,5401,298

Design, additional printing and other charges are confirmed zero in this example.
A moves from a base price of 600 to the 1,000-unit price of 500, but orders 500 more units than required production.
Its cost per ordered unit is 770, while its cost per required distribution unit is 1,540.
When all conditions are met, B requires 121,000 less cash.

What if B offers 450 per unit at 1,000 units?

Product cost becomes 450,000, plus plates 40,000, samples 20,000, packing 100,000 and shipping 30,000: an entered sum of 640,000.
With the same fictional VAT input, total cash is 704,000, which is 55,000 more than the current order.
The lower unit price therefore ties up additional cash rather than reducing the order total.

Interpret totals, effective cost and surplus correctly

Ordered units versus required distribution

Cost per ordered unit is total / Q; effective cost per required distribution unit is total / N.
Neither is the quoted product price before setup, samples and freight.
A large MOQ can lower the first measure while increasing the cash needed to distribute the required quantity.

Surplus and assumed usable quantity

Surplus order is the quantity added beyond required production by MOQ or pack rounding.
Assumed usable units and reserve after distribution are planning figures, not inspection results.
Distinguishing planned reserve, defect allowance and MOQ surplus explains why products may remain after the event.

For multiple products, the model sums the complete A portfolio and complete B portfolio.
A single item with unresolved specification or arrival requirements places the portfolio ranking on hold.
Equal confirmed totals produce a tie; that does not establish equal quality, service, warranty or remake responsibility.
Check the original commercial terms before placing an order even after the cost comparison is complete.

Unknown charges and arrival dates hold the ranking

Blank means unknown; zero means confirmed free or included

A blank shipping charge does not imply free delivery.
Unknown plate, sample, packing or other charges leave only a known partial sum, distinct from a confirmed final total.
Do not select a cheaper supplier by comparing one incomplete sum with the other supplier’s complete total.
Enter zero only after confirming that the charge is included or free.

Arrival at the destination is different from factory dispatch or production completion.
Confirm whether production starts after artwork approval and whether the promised date includes transport and receipt at the actual destination.
A missing arrival date or one later than the requirement prevents a confirmed ranking.
Invalid calendar dates and a quote-check date after promised arrival must also be corrected.

Supplier overrun, underrun and actual-receipt billing terms can differ.
The confirmation checkbox should reflect a real review of the original and exact-quantity delivery/settlement terms.
Obtain written clarification of quantity availability, shortages, remakes and event timing rather than selecting confirmation merely to unlock a comparison.

Practical uses and purchasing limits

Store openings and group events

Compare a smaller, higher-unit-price order with a larger MOQ order once attendance and distribution needs are known.
Future use of leftovers does not remove their cost from the cash needed now.
Products printed with an event name or date may have limited reuse, so choose reserve quantities for the actual purpose.

Multiple products, revised logos and reorders

Review missing charges across products with different MOQ and printing methods.
A reorder may still need new setup when the logo or printing location changes.
The calculator does not determine plate ownership, storage duration or reuse rights; obtain current written charges for this order.

  • Compare prices covering the same imprint scope and avoid double-counting additional printing.
  • Do not treat an assumed price, production time, defect rate or production variance as a supplier-confirmed default.
  • Results do not certify quality, safety, stock, rights, artwork approval, delivery guarantees or tax treatment.
  • For sheet layouts and paper purchasing, use the print imposition and paper quantity calculator.
    For separately manufactured boxes, dielines, split delivery and storage, use the custom packaging box quote calculator.

Frequently asked questions

Must I order the full MOQ when I need fewer units?

The model rounds the greater of production need and MOQ to a whole pack multiple.
Ask the supplier whether a short-run exception or another printing method is available.
Enter the revised confirmed MOQ and price if an exception is offered.

Do two sides and two colors automatically mean four plates?

No.
Sides and colors are specification checks, while actual plate count is a supplier-confirmed cost quantity.
Setup structures depend on printing method, so sides × colors is not treated as a universal formula.

Can I enter zero for unknown sample or freight charges?

Zero means confirmed free or included.
Leave an unconfirmed charge blank and send the missing-information list to the supplier.
Known partial sums remain distinct from final totals, and the lower-cost ranking is held until missing costs are resolved.

Is increasing the order worthwhile when the next unit price is lower?

Check the total including additional product, packing and tax amounts.
In fictional B, the 1,000-unit price drops to 450, but total cash rises from 649,000 to 704,000, an increase of 55,000.
Whether the extra products will be useful is a separate decision.

How do reserve and defect assumptions differ?

Reserve increases the usable distribution target; the defect assumption increases the production needed to reach that target.
Neither predicts actual usable yield or supplier short-delivery terms.
Production variance, settlement and remake arrangements require separate written confirmation.

Is a Korean statutory VAT rate applied automatically?

No.
The calculator uses the inclusion basis and rate confirmed by the user from the quote.
The example’s 10% is fictional; confirm actual applicability, rate, invoice rounding and settlement with the supplier.

Can I rank prices before the arrival date is confirmed?

You can review calculated charges and missing information, but a missing or late arrival date holds the final ranking.
Confirm artwork approval timing, production and transport before recording a promised arrival date.

Does the model optimize a mixed order across A and B?

It compares ordering every product from A with ordering every product from B.
Mixing suppliers can change shared freight and volume discounts, so it is not automatically optimized.
Use the TXT review or printout to request a separate mixed-order quote.

Sources, updates and your next supplier request

These supplier-owned references support checking MOQ, setup, imprint extras, packing, production, transport and quantity settlement separately.
They were checked on 2026-11-16; a check date is not a published effective date when the page provides none.
An overseas supplier’s policy is not treated as a common Korean market price, tax rule or purchasing term.

Request the same quantity, logo and arrival date

Resolve the report’s missing charges and specification differences, then send both suppliers the same sides, colors, confirmed plate count, quantity, included imprint scope and destination arrival requirement.
Use a TXT review or printed copy with quote references and check dates to obtain revised written terms.
Recheck actual stock, quality, approval requirements, taxes, freight and exact-quantity delivery/settlement arrangements before every final order.

Related calculators