Office Floor Stripping & Wax Quote Calculator
Match the scope of two real quotes. Compare contractor payment, business downtime and the planned return to your office.
Start with the same work scope
Area is in m², up to 3 decimals. Confirm required coats and return conditions for the actual product and floor.
What is known so far
Start with the actual work area, then enter each contractor’s scope and prices.
KRW · m² · KST (UTC+09:00). Only entered separate tax is added. Planned time is not site clearance or a safety guarantee.
Compare the floor process beside the quoted total
Two vendors can quote for the same office while allowing for different stripping, coating passes and furniture handling.
Check those boundaries before treating a lower price as the same service.
This office floor stripping and wax quote calculator reconstructs two written quotes and adds the cost of the actual work disruption.
It shows the vendor payment and projected re-entry time alongside the operating budget.
Enter the rates, minimum charge, separate tax amount and durations the vendors have confirmed.
The tool supplies no market rate or standard curing time.
A missing amount or required process leaves the final comparison open while preserving the known subtotal.
Use the saved questions to obtain revised quotes for an identical scope before booking.
Amounts remain KRW, areas remain m² and the schedule uses Korea Standard Time (KST), including on this English page.
Start with the actual work area and floor material
Mark the same boundary in square metres
Enter the area that will actually be cleaned, stripped and coated.
The leased area may include fixed cabinets, a server room or an entrance with another finish.
Mark included and excluded areas on a plan and send the same drawing to both vendors.
The area must be positive and can have up to three decimal places.
Calculate zones separately when they are serviced on different visits or reopen at different times, so separate minimum charges and return times remain visible.
Record the material and existing finish
Use the product record, current coating information and the method the vendor has checked on site.
Similar-looking floors can have different care requirements.
Ask both vendors to confirm the same substrate and existing film.
The calculator does not diagnose flooring or decide whether a wax product is suitable.
A maintenance coat over an existing film is not automatically the same scope as removing that film first.
Agree on stripping, coating passes and furniture return
Set the required stripping, number of coats and furniture move-and-return requirement before copying the quotes.
The required coat count is a positive whole number confirmed for the actual product and site, rather than a recommended default.
A quote for two coats and a quote for one coat do not form a completed equal-scope comparison.
A higher count also differs from the requested count and needs a revised scope confirmation.
- Included means another entered rate already covers the process, so its separate charge is zero.
Mark where it is included in the original quote. - Separate means a confirmed stripping rate per m² or the full furniture move-and-return amount for the zone.
Convert a per-item furniture offer into its agreed total first. - Not provided means a required process is absent.
Do not choose that incomplete scope simply because its displayed cost is low. - Unknown means the vendor has not confirmed provision or inclusion.
It is not treated as included or free.
Transfer the quotes in three steps
- In shared scope, enter the actual work area, material and existing coating, required coats, stripping and furniture requirements.
Record the start in KST and the whole team’s actual hourly disruption cost. - In quotes, enter A’s cleaning and per-coat wax rates, offered coat count, stripping and furniture status, base minimum, other extras and separate tax amount.
Add the work, final curing and actually disrupted minutes, then confirm the written scope and schedule.
Switch to B and enter its own offer using the same basis. - In results, compare vendor payments, disruption costs, operating budgets and projected return times.
Return to the relevant quote to answer missing questions and save the TXT checklist for written confirmation.
Loading the fictional example preserves your inputs, step and selected vendor so you can return to them.
A blank and a confirmed zero are different.
Enter zero when the vendor confirms there is no minimum or separate charge; leave an unanswered amount blank.
Negative numbers, exponent notation, malformed grouping commas and values beyond safe integer arithmetic need correction.
Changing shared or vendor process scope requires renewed scope confirmation.
Calculate each process, then apply the base minimum
Multiply the area and coat count at the correct line
Cleaning charge = work area × cleaning KRW/m².
Wax charge = work area × wax KRW/m²/coat × offered coat count.
Separate stripping charge = work area × stripping KRW/m².
Round each exact decimal process product once to the nearest won, with a half-won rounded up, then add the lines.
Stripping that is not required or is confirmed included adds no separate amount.
If a wax price is a package for all coats, obtain the per-coat breakdown before entering it, so the coat count is not multiplied twice.
Apply the minimum once to the three base processes
Base = max(cleaning + stripping + wax, base minimum).
Vendor total = base + separate furniture total + other extras + separate tax amount.
The minimum here applies to cleaning, stripping and wax together; furniture, other extras and tax follow it.
If the contract uses an invoice-wide minimum, includes travel in that minimum or applies separate process minimums, request a breakdown matching this calculation order.
Do not enter furniture again under other extras.
Check the separate tax amount and written final total
Every amount is in KRW.
If the vendor bills VAT separately, enter the actual tax amount it confirms.
If the rates and extras already include tax, the separate tax amount is a confirmed zero.
The calculator sets no tax rate, issues no tax invoice and does not determine taxability.
Check any exemption, discount or invoicing condition against the actual written offer.
The optional written final total is a reconciliation figure for the reconstructed vendor total.
A difference keeps the budget ranking on hold until it is explained.
Check discounts, minimum-charge order, area, per-coat versus package rates and duplicated included charges.
Leaving this optional figure blank does not erase confirmed line amounts.
If the vendor supplies only a single final price, request the process breakdown before using this itemised model.
Separate the work window from final curing
Projected re-entry = start + total work minutes + vendor-confirmed final curing minutes.
Total work includes preparation, cleaning, stripping, coating and the drying between coats.
Do not add intercoat drying again when it is already inside the work duration.
The final curing input is the waiting period after the last coat required for the agreed use.
When the result crosses midnight, check the date as well as the clock time against the next scheduled users.
Walking, normal work and furniture return can differ
A surface described as dry is not automatically ready for heavy furniture or normal operations.
Ask both vendors to use the same return-to-use condition.
Ventilation, site temperature, humidity and actual conditions can affect handover.
The calculated time only adds the entered waiting period; it is not a safety approval or guaranteed completion time.
Have the responsible person confirm site conditions and handover before reopening.
Add the disruption cost to read the operating budget
Disruption cost = disrupted minutes × whole-team hourly cost ÷ 60, rounded to the nearest won.
Operating budget = vendor total + disruption cost.
Overnight curing can involve zero affected working minutes if operations incur no extra cost during that interval.
With zero disrupted minutes, the disruption cost is zero even if the hourly amount is blank.
For a positive interval, enter the actual whole-team hourly amount once rather than multiplying the result by headcount again.
Disrupted minutes cannot exceed the combined work and final-curing window.
Check external workspace minimum bookings, later travel or rental losses outside that window separately in your office budget.
The tool does not forecast a sales-loss percentage or productivity reduction.
A lower budget is not ranked as a completed choice when required work is absent or the necessary schedule is unknown.
Worked example: two coats over the same 100 m²
These fictional rates and times illustrate the arithmetic, not a market price or recommended process.
The office requires stripping and furniture handling over 100 m² with two coats.
Both vendors start on 2026-11-20 at 18:00 KST and confirm the same material, scope and schedule.
The whole-team disruption rate is KRW 30,000 per hour.
Quote A · vendor KRW 462,000
Cleaning is KRW 500/m², separate stripping KRW 1,000/m² and wax KRW 800/m²/coat for two coats.
The process sum is 50,000 + 100,000 + 160,000 = KRW 310,000, so the KRW 350,000 minimum applies.
Furniture KRW 50,000, other extras KRW 20,000 and separate tax KRW 42,000 bring the vendor total to KRW 462,000.
Work takes 240 minutes and final curing 480 minutes, giving projected re-entry at 06:00 on 2026-11-21.
The affected 120 minutes cost KRW 60,000, making the operating budget KRW 522,000.
Quote B · vendor KRW 352,000
Cleaning is KRW 600/m², stripping is included and wax is KRW 1,000/m²/coat for two coats.
The process sum is 60,000 + 0 + 200,000 = KRW 260,000, so the KRW 300,000 minimum applies.
Furniture is included; other extras KRW 20,000 and separate tax KRW 32,000 bring the vendor total to KRW 352,000.
Work takes 180 minutes and final curing 360 minutes, giving projected re-entry at 03:00 on 2026-11-21.
The affected 60 minutes cost KRW 30,000, making the operating budget KRW 382,000.
With all common conditions confirmed, B’s operating budget is KRW 140,000 lower.
Changing A’s stripping status to unknown or B’s coat count to one holds the equal-scope comparison open.
The remaining known subtotal is neither the final invoice nor an upper bound.
Adjust the inputs to the real work arrangement
A single after-hours visit
Confirm normal use before the next shift or customer appointment and identify when furniture will return.
Enter only the minutes that actually create extra expense, rather than the whole night.
Staged floors or zones
Compare each closure window separately when staff can use another zone while one cures.
Check whether each visit triggers a new minimum and whether furniture moves twice.
A low rate with a high minimum
A lower area rate can still produce a higher payment when the base minimum applies.
Check which amount controls the base and whether extras sit inside or outside it.
A later scope change
If fixed-cabinet areas or stripping are added, revise the area, coats, schedule and price together.
Request a new written scope confirmation for the changed conditions.
Use the saved questions before placing an order
- Have both vendors checked the same floor product, existing coating, stripping requirement and manufacturer instructions?
- Are the actual area, coat count, furniture move-and-return responsibilities and fixed-furniture exclusions written down?
- Have you reconciled the minimum’s scope, per-coat rate, other extras and tax basis without duplicate included charges?
- What use is allowed after the final waiting period, and who handles delayed curing and site handover?
The TXT comparison records the currency, tax treatment, KST schedule, input scope, known subtotal and unresolved questions.
Check it against the original quotes and the same marked plans and photographs.
Saving the checklist does not place an order or enter a contract with a vendor.
Frequently asked questions
1. Does this provide a market price for office waxing?
No standard rates are supplied.
Enter actual cleaning, stripping and per-coat wax rates to check the scope and arithmetic of written offers.
2. What if stripping is not needed?
Select that stripping is not required in shared scope.
Inactive stripping rates and earlier statuses do not add a separate stripping charge.
Confirm whether stripping is needed using the site and product guidance.
3. Can I compare different coat counts?
Individual amounts can remain visible, but ranking waits when a quote differs from the required count.
Obtain revised quotes for the same count and confirm the scope again.
4. What if there is no minimum or tax is included?
Enter a confirmed zero for no base minimum.
If entered prices already include tax, enter zero as the separate tax amount.
A blank remains unconfirmed instead of becoming zero.
5. Why does the reconstructed total differ from the quote?
Check area, per-coat pricing, minimum order, duplicated included work, discounts and tax.
A mismatch with the optional written final total holds ranking until the difference is reconciled.
6. How many curing hours guarantee safe re-entry?
There is no universal time in this tool.
Enter the final wait the vendor confirms for the product, material, environment and intended use.
A projected time is different from site safety approval.
7. Does the whole overnight closure count as lost work?
Enter only the portion of work and curing that actually creates disruption expense.
Zero affected minutes means zero disruption cost.
The tool does not forecast lost sales.
8. Can I use this for recurring cleaning or carpet?
This model covers a one-off hard-floor cleaning, stripping and waxing process.
Use the recurring-cleaning comparison for monthly labour and outsourcing, or the carpet calculator for textile cleaning and drying.
Sources and the 2026 checking basis
Vendor primary service information was checked on 2026-11-20.
C-Tech’s floor wax and coating service informed the material, existing-film, stripping, coating and return-to-use checks.
Office Clean’s floor cleaning and wax coating service informed the separate-process, area, furniture and schedule checks.
The roadmap’s general service address was access-restricted, so the same vendor’s detailed floor page was used.
Public descriptions do not replace the actual contract or the chosen product’s manufacturer instructions.
Recheck rates, minimums, included work, tax amounts and return-to-use conditions for each contract, and review public service descriptions periodically.
This is arithmetic for user-supplied 2026 quotes; it does not set statutory prices, tax rates, methods or construction safety conditions.
The English interface keeps KRW, m² and KST and does not convert the quote to another jurisdiction’s tax system or local market rates.
Request revised quotes for the same process
Fill the unanswered process details above and save the comparison for the vendors.
Once area, products, coating passes and intended use agree, assess the payment alongside the projected return time.
For a different cleaning decision, use the office carpet cleaning scope and downtime calculator or the recurring office cleaning outsourcing versus employment comparison.
Related calculators
- Office Carpet Cleaning Scope and Downtime CalculatorCompare carpet cleaning quotes for the same office, including stain treatment, furniture moves, drying time and temporary workspace costs.
- Office Cleaning Outsourcing vs Direct Hire Cost CalculatorCompare directly hired office-cleaning staff with an actual Korean vendor quote over the same area, worker count, visits, service hours, and horizon. The dedicated bilingual calculator reuses one pure KRW function for paid hours, wage, company-specific employer burden, an optional retirement-benefit planning reserve, leave and absence cover, supplies, equipment, recruiting, training, health management and internal oversight, plus vendor setup, monthly base, service-hour fees, supplies add-ons, annual extras and retained coordination. It solves total, monthly, per-service-hour and per-pyeong cost, three rate thresholds, horizon sensitivity and cumulative crossover. The guide preserves the 2026 KRW 10,320 minimum-wage notice, Minimum Wage Act Article 6, Labor Standards Act Articles 18, 55 and 60 and Enforcement Decree Article 30, Employee Retirement Benefit Security Act Articles 4 and 8, Occupational Safety and Health Act Articles 63 and 64, and Worker Dispatch Act Article 2 as checked on July 31, 2026, without inventing a market-average cleaning rate, statutory combined burden, paid-hour entitlement, vendor compliance or legal classification.
- Korea Cleaning Quote Scope ComparisonCompare two or three actual cleaning quotes for the same home, area basis and work scope. Separate confirmed subtotals, conditional extra charges and remaining cash in KRW.
- Office Moving Quote Comparison by Asset and ScopeCompare two written office moving quotes against the same inventory, work window and IT handover requirements.