Office Moving Quote Comparison

Match two quotes to the same moving tasks.
Compare the fixed costs and see where extra charges could apply.
Assets and tasks
Enter required quantities to compare both bids against the same tasks.
Allowed work windowKST
Compare office moving quotes against the same work list
An office moving quote becomes useful when you can trace its price to the assets, tasks, and working hours it covers.
A desk may need dismantling at the old office, transport, assembly, and placement at a specified seat.
A server may require physical handling followed by a separate IT handover.
This calculator compares two actual quotes against one shared list so you can identify quantity shortfalls, additional charges, and responsibilities that still need agreement.
The intended decision is which written quote can cover the required move within its agreed conditions, and which details need a revised quotation.
This English interface uses Korean won and the local working times of the Korean moving sites.
Enter the tax-inclusive cash amounts shown in your documents, using the same basis for both providers.
All example prices below are hypothetical inputs for checking the arithmetic.
Prepare the common asset and task list
Furniture and documents
Count desks, cabinets, partitions, and document boxes in consistent units.
Keep dismantling and assembly as separate tasks when their coverage differs.
For records, distinguish boxes going to the new office from items approved internally for disposal.
Confirm how sealed boxes will be handed over and who will check receipt.
IT and specialist work
Define the required handling for PCs, servers, network equipment, and leased devices.
Record responsibility for reconnection, boot checks, network settings, and operational acceptance.
For additional workers, use the same agreed charging unit in the required quantity, included quantity, and unit price.
A person, a person-hour, and a completed task are different units.
Match each quote to the same version of the inventory and layout plan.
If a desk is moved to storage while another goes to the new office, make their destination and handling conditions clear in the supporting work list.
A required quantity of zero makes that row inactive in the calculation.
Included capacity above the requirement produces a zero shortfall.
Read the quote inputs correctly
- Required quantity is the amount of work both providers must cover for the shared comparison.
- Included quantity is the amount covered by that provider’s base quote for the row.
- Confirmed extra unit price is the written amount charged for each unit of shortfall when that charge is confirmed.
- Conditional additional-charge cap is the maximum additional amount for the entire shortfall on that row under the stated conditions.
- Responsible party identifies the moving provider, the customer, a third party, or an unresolved assignment.
- Base quote and amount already paid come from the same quote revision and payment record.
Confirm zero and missing amounts
Use a confirmed zero only when the supporting agreement explicitly makes the additional work free or includes it elsewhere.
An unanswered price question remains unresolved.
Check whether each cap applies to the listed quantity and working conditions, and whether it includes tax.
If several rows share one package price, allocate that price once and document how the remaining rows are covered.
How the amounts are calculated
Quantity shortfall
max(required quantity − included quantity, 0)
Confirmed subtotal
Base quote + sum of confirmed extra unit price × quantity shortfall
Conditional upper amount
Confirmed subtotal + sum of applicable row-level additional-charge caps
Remaining confirmed amount
Confirmed subtotal − amount already paid
A conditional cap applies once to the entire shortage on its row.
A confirmed unit price is multiplied by that shortage.
The same additional work should have one charging basis in the comparison.
Payments already made reduce the remaining amount and are already part of the overall spending.
An overpayment requires reconciliation with the provider and the payment record.
A subtotal can remain useful while other costs are unresolved.
Read it alongside the outstanding items, because an unknown cost can change the final amount.
The complete scope also depends on agreed responsibilities and working times.
Resolve these conditions before using an upper amount as a basis for selecting a provider.
Worked example with quotes A and B
Assume both quotes cover the same required work window and have confirmed responsible parties.
Quote A has a KRW 2,000,000 base price, covers 10 of the 12 required desks, and charges a confirmed KRW 30,000 for each additional desk.
A separate task has a conditional additional-charge cap of KRW 80,000.
The customer has already paid KRW 500,000 toward A.
Quote B confirms the entire same scope for KRW 2,100,000.
| Comparison item | Quote A | Quote B |
|---|---|---|
| Confirmed subtotal | KRW 2,060,000 | KRW 2,100,000 |
| Conditional upper amount | KRW 2,140,000 | KRW 2,100,000 |
| Amount already paid in this example | KRW 500,000 | KRW 0 |
| Remaining confirmed amount | KRW 1,560,000 | KRW 2,100,000 |
The two extra desks add KRW 60,000 to A.
A begins KRW 40,000 below B, but its upper amount is KRW 40,000 above B.
The ranking therefore depends on the final charge for the conditional task.
A conditional charge of KRW 40,000 makes both totals equal.
The KRW 500,000 payment affects A’s remaining cash obligation, while the total-price comparison continues to use the full quote amounts.
Check working windows and the IT handover
Record the agreed access window at the departure building and the arrival building using local site time.
Include the date when work spans midnight, and confirm lift reservations, loading access, and any restricted hours with the relevant building contacts.
A provider’s availability must cover the required windows at both ends.
Changing the window can change staffing, equipment availability, and the quote conditions.
Agree an IT and telecom verification schedule that allows the responsible team to attend.
Assign the handover for network settings, security configuration, and operational checks explicitly in your work list.
A named customer or third-party owner may still have a separate invoice, so reconcile that cost with the project budget.
If the timetable or responsible party is unresolved, use the result to request confirmation before choosing on price.
Move through the comparison in three steps
Choose ‘Load example’ to explore how extra desks and a conditional charge affect the results.
If you have already entered values, a confirmation appears before the example replaces them.
For your actual comparison, collect both dated quotations, the inventory, the destination layout, and payment records.
- Common scope
Enter the shared quantities and the allowed work window using consistent units and local site time.
Set the IT verification time when IT tasks are required, and update the end date when work runs past midnight.
A required quantity of zero removes that task from both quotes. - Vendor quotes
Choose ‘Enter vendor quotes’, then use the ‘Quote A’ and ‘Quote B’ buttons to switch between providers.
Each quote retains its values when you switch.
Enter the tax-inclusive base amount, payments already made, quoted schedule, included quantities, and responsible parties.
For shortages, enter a confirmed extra unit price or a conditional cap, and leave unanswered pricing questions unresolved. - Results
Choose ‘View comparison’ to review both confirmed subtotals, conditional ceilings, and remaining confirmed amounts.
Check shortages and unresolved costs, responsibilities, or schedule confirmations, then save the checklist for your revised-quote request.
Choose ‘Edit vendor quotes’ to update the relevant provider when a revision arrives.
What to include in a revised-quote request
- The inventory revision, row name, unit, required quantity, and provider’s included quantity.
- The additional quantity and its confirmed unit price, or the total conditional cap and the conditions that trigger it.
- The party responsible for dismantling, packing, departure handling, transport, arrival handling, and final placement.
- The owner and time of the IT or telecom handover, including the agreed acceptance checks.
- The approved handling of retained documents and disposal items, with any agreed sealing, attendance, or completion evidence.
- The tax-inclusive total, quote validity date, payment reconciliation, and any remaining items requiring a separate quote.
For a weekend move, the most valuable correction may be an explicit completion window.
For a records-heavy office, it may be confirmed box quantities and handover responsibility.
For a server-dependent team, it may be a named IT contact and verification appointment.
Use the missing items to frame a specific request that the provider can answer against the same work list.
Frequently asked questions
Can I compare a lump-sum quote?
Enter the lump sum as the base amount, then ask the provider to confirm the quantities and work included in it. The comparison becomes more reliable as each coverage question is answered.
What if an extra unit price is missing?
Keep the cost unresolved until the provider gives a confirmed price or a written conditional cap. A known subtotal can be displayed while that question remains open.
Does a cap apply to every missing item?
The cap field represents the total maximum additional charge for the shortage on that row. Use the unit-price field when the agreement charges separately for each extra unit.
How should I handle a customer or third-party task?
Assign its actual owner and verify the schedule. Reconcile any separate invoice in the wider move budget and ensure that the cost is entered only once.
What if the deposit exceeds the confirmed subtotal?
Check the quote revision, payments, and any conditional work already invoiced. An excess payment indicator calls for reconciliation with the provider before making a further payment.
Can the result establish document disposal or tax treatment?
Document selection, retention obligations, tax treatment, and contractual responsibility require the relevant records and professional assessment. The calculator uses the quantities and tax-inclusive amounts supplied for this comparison.
Sources and review date
Provider service descriptions were checked on November 19, 2026.
Muisj’s corporate-moving FAQ describes quantity, access, scheduling, and IT responsibility considerations.
The 2484 office-moving guide describes site surveys, furniture handling, placement, and completion checks.
These descriptions support the work-list structure.
Verify prices, included quantities, tax treatment, working windows, and caps against each current written quote.
Turn the checked quote into a relocation budget
Once the moving scope is agreed, carry its confirmed cost into the wider relocation plan.
Double rent, deposit funding, fit-out, telecom contracts, and business interruption can create further cash needs.
The office relocation budget calculator can combine those wider inputs while this comparison retains the detailed asset and task reconciliation.
Related calculators
- Office Relocation Total Cost & Downtime Loss CalculatorCombine itemised move, fit-out, furniture, IT, occupancy overlap, continuity, downtime, and lease-deposit cash flow into economic cost, peak funding, and a stress case.
- Korea Office Fit-Out Trade Estimate & Move-In Cash Flow CalculatorNormalize thirteen Korean office fit-out trades, contingency, and 10% VAT, then stage contract, progress, move-in, deposit, allowance, and refund cash to find peak funding and any gap.
- Korea Moving Quote Scope ComparisonCompare two or three written moving quotes for the same inventory, trucks, workers and work scope. Separate confirmed subtotals, conditional caps and remaining cash in KRW.
- Virtual vs Coworking vs Private Office TCO CalculatorCompare virtual-office, coworking, and private-office costs across one planning horizon, including deposits, setup, recurring services, internal administration, exit cost, escalation, stress, and present value.