Laser Cutting Material, Piercing & Lot Quote Calculator

Compare actual quotes for one drawing: material, cut length, piercings and minimum charges in KRW.

Order quantities for one drawing

Above 0–100,000 · whole numbers

Above 0–1,000 · up to 4 decimals

0–100,000 · up to 4 decimals

0–1,000,000 · whole numbers

Enter supplier-confirmed CAM length and piercing counts. This tool does not infer paths from outlines or perform automatic nesting.

Start with quantity and have your CAM report and actual quotes ready.

Laser cutting quotes: what comes after the price per metre?

This laser cutting material, piercing and lot quote calculator compares supplier charges for the same drawing and order quantity.
A low cutting rate can still produce a higher payable total after material, piercings, setup and the minimum charge are included.
Adding a fee that is already inside a package can also count the same cost twice.

Keep the supplier quote and confirmed CAM quantities beside you, then check the lot total, price per piece, repeat-order amount and unresolved items together.
The calculator does not estimate market prices or analyse a drawing.
All prices come from your inputs, with no built-in industry rate or statutory tax rate.
Amounts are in KRW in both languages.

Who can use it, and what decision does it support?

Small fabricators and business owners

Use it when ordering repeated brackets, nameplates or decorative panels from one drawing.
Check the cash required for this lot and the effect of setup charges before relying on a headline unit rate.

People organising supplier quotes

A buyer or family member can translate differently formatted quotes into the same fields.
Supplier aliases and quote references help organise a revision request without entering unnecessary customer or drawing details.

The decision is how much to pay and how many pieces to order for matching material, thickness, drawing revision, surface and delivery scope.
When totals differ, identify missing processes before requesting a revised quote.
Different materials or quality requirements are not equivalent products simply because both quotes have a total.

Common drawing and lot inputs

  • Order quantity: enter 1–100,000 whole pieces of the same part.
    Every supplier is evaluated against this common quantity.
  • Material, drawing revision and thickness: record the supplier-confirmed grade, revision and thickness in mm.
    Thickness does not generate a cutting speed or material price.
  • CAM cut length per piece: enter the confirmed chargeable path in m/piece.
    A simple outside perimeter may differ from CAM quantities that include internal features and starting paths, so use the supplier record.
  • Piercings per piece: enter the supplier-confirmed number of starts per piece.
    Do not assume that this always equals the number of holes.
    A confirmed count of zero is valid.
  • Order date: enter YYYY-MM-DD to compare it with the quote validity dates.
    Confirm actual availability, delivery and commercial validity with the supplier.

Quantity is applied once to the per-piece length and piercing count.
If your CAM report already gives lot totals, convert them to per-piece values first.
Reconcile mm and m before comparing quotes, and use a whole number for the piercing count.

Supplier material area, rates and inclusion states

First confirm whether the supplier provides the material or the customer supplies it.
For separately billed supplier material, enter the supplier-confirmed area in m²/lot and the rate in KRW/m².
Unlike per-piece length, this area is not multiplied by quantity again.
Ask whether spacing, remnants and sheet allocation are included; do not silently substitute the net part area for the billed area.

Unknown

The supplier has not yet confirmed whether a charge is included or separate.
A blank or unknown item is not free, and the final comparison stays on hold until it is resolved.

Included

The item is already inside the setup/package charge or another billed item.
It is not added again, and an old rate hidden by this selection is not used in the total.

Separate

Enter cutting in KRW/m, piercing in KRW/start, and finishing and shipping in KRW/lot.
If a separate item is confirmed free, explicitly enter zero for its rate or lot amount.

Customer-supplied material creates a zero supplier material charge here, but excludes the customer’s external material purchase cost.
The lowest-price ranking is held when supplier-provided and customer-supplied quotes are mixed because their spending scopes differ.
Check external purchase, transport and remnant ownership before deciding the full cost of supplying your own material.

Three steps: drawing → quotes → results

  1. Enter common drawing quantities. Start with quantity, then material, thickness, per-piece length and piercings.
    Confirmed common inputs show the total lot length and piercing count before the quote is complete.
  2. Transfer up to four supplier quotes. Record the active supplier’s reference, validity, material ownership, inclusion states and actual rates.
    Confirm initial setup, repeat setup, minimum charge and minimum-charge scope independently.
  3. Confirm matching scope and read the result. With unresolved items, read the known subtotal and remaining questions.
    Once every condition is complete, compare lot and per-piece amounts on matching rows.
    Use the edit action to return to that supplier.

The worked example is fictional and is not a price list.
Loading it during editing preserves your inputs, workflow step and selected supplier for the restore action.
Switching suppliers or visiting results also keeps the entered amounts, so the same values do not need to be copied repeatedly.

Formulas that avoid adding the minimum twice

Let Q be quantity, L total lot length and P total piercings: L = length per piece × Q and P = piercings per piece × Q.
Material M is billed lot area × material rate; cutting C is L × cutting rate; piercing H is P × piercing rate.
S is initial setup, R repeat setup, F finishing and D shipping.

Minimum applies only to processing

base = M + max(S + C + H, minimum) + F + D

Material, finishing and shipping sit outside the minimum.
If processing falls below it, only the shortfall is added.
The whole minimum is not added on top of the processing subtotal.

Minimum covers the material-inclusive subtotal

base = max(M + S + C + H, minimum) + F + D

The minimum is compared with the subtotal including material.
Finishing and shipping remain outside the minimum in both supported models.
If your contract defines another scope, request an itemised quote before entering it.

The minimum uplift is max(0, minimum − covered subtotal).
Reducing length or quantity may leave the payable amount unchanged while the minimum still binds.
This is why the scope of the minimum must be confirmed before comparing rates alone.

Worked example: 20 pieces from the same drawing

These are fictional calculation inputs, not market prices.
Assume SUS304 / REV-A, thickness 2mm, 20 pieces, 1.5m cut length and 4 piercings per piece: 30m and 80 piercings for the lot.
The order date is 2026-11-23, and both quotes cover 2026-11-01–2026-12-31.

A: KRW 132,000 per lot · KRW 6,600 per piece

Material is 0.8m² × 50,000 = 40,000; cutting is 30m × 1,000 = 30,000; piercings are 80 × 100 = 8,000.
Adding initial setup of 20,000 gives processing of 58,000.
A processing-only minimum of 70,000 requires an uplift of 12,000.
Finishing of 5,000 and shipping of 5,000 produce a base of 120,000.
Assuming a user-confirmed separate tax rate of 10%, the payable total is KRW 132,000.

B: KRW 107,800 per lot · KRW 5,390 per piece

Material, length, piercings, finishing, shipping and the fictional tax rate match A.
Initial setup is 10,000 and the processing-only minimum is 40,000.
Processing of 48,000 already exceeds that minimum.
The base is 98,000 and the payable total is KRW 107,800, a difference of KRW 24,200 from A.
B is lower only after the full matching scope has been confirmed.

If only A’s minimum scope changes to include material, the covered subtotal is 98,000, above the 70,000 minimum.
Adding finishing and shipping gives a base of 108,000 and a payable total of KRW 118,800 under the same fictional tax assumption.
Identical numerical inputs can produce different totals when the minimum scope changes, so do not guess what a quote’s wording means.

Read repeat orders and length sensitivity separately

Confirm repeat setup independently

A repeat order replaces initial setup S with confirmed repeat setup R and applies the minimum again.
A one-off programming charge does not mean machine setup and loading are also free.
If R is blank, the initial total can be available while the repeat total remains pending.
With fictional R = 0, A remains KRW 132,000 because of its minimum.
B’s processing subtotal of 38,000 is raised to its 40,000 minimum, giving a repeat total of KRW 99,000.

A user assumption changing length only

Length sensitivity of ±10% changes only the per-piece CAM length, keeping material area, piercings, setup, minimum and tax unchanged.
Fictional A remains KRW 132,000 at both ends, while B ranges from KRW 104,500–111,100.
This is not a price confidence interval, discount offer or revised production quote.

A real drawing change can also change piercings, nesting and production time.
Use sensitivity to isolate the length item, then obtain new CAM quantities and supplier prices for a new revision.
When changing quantity, also update the supplier-confirmed billed material area for that lot.

Known subtotal, payable total, tax and validity

Derived payable totals are displayed up to KRW 1 trillion.
If only a repeat-order or length-sensitivity scenario exceeds this limit, its amount is withheld with a separate explanation.
A valid initial quote total remains available, so distinguish an unknown setup charge from a scenario exceeding the supported amount.

The known subtotal collects the cost items confirmed so far.
It can appear while material or shipping is unknown, but it is neither a complete payable amount nor an upper bound on missing charges.
Keep confirmed zero distinct from blank, and use the unresolved-item names to ask the supplier about inclusion and rates.

Use only the tax treatment confirmed for the quote

With added tax, payable = round(base × (1 + rate / 100)); with included or no tax, payable = round(base).
Intermediate items are not rounded.
The final lot total is rounded to whole KRW.
The per-piece amount divides this final total by quantity and displays up to two decimal places.
Included tax is not reverse-calculated, and the example’s 10% is never automatically applied to a real transaction.

A quote is held if the order date is before its start or after its expiry.
Both boundary dates are included, but a matching date does not guarantee supplier availability or that the price will be honoured.
Lowest-price markers and the highest-minus-lowest difference appear only when all selected quotes are complete and material ownership and scope match.
A single quote can still be checked, but has no ranking.

Three practical uses

Moving from a prototype to a production lot

See how initial setup and the minimum affect a small lot’s price per piece.
When quantity increases, reconfirm the rate, material allocation and delivery scope.
The calculator does not invent a volume discount for a new quantity.

Considering customer-supplied material

First identify why material is absent from the supplier charge.
Confirm external purchase and transport, responsibility for defects and remnant returns before judging total spending.
Holding the ranking against supplier-provided material highlights that scope difference.

Ordering the same drawing again

Confirm program reuse and unchanged material, finish and drawing revision.
A lower programming charge may not reduce the total while the minimum still applies.
The repeat result assumes the currently entered quantities, rates and validity; it does not guarantee a future price.

Pre-order checklist and saving your result

  • Confirm the same drawing revision, material grade, thickness, finish, tolerances and delivery scope.
  • Reconcile CAM length, piercing definitions, billed lot area and material/remnant ownership with the supplier.
  • Confirm setup, minimum, finishing and shipping inclusion, tax, quote validity and repeat-order terms.

Save a TXT worksheet or print the results to organise common conditions, confirmed supplier costs, unresolved items and the checklist.
When viewing fictional inputs, keep the example label so the output is not confused with an actual order record.
Checking a box does not verify a contract, and edited inputs require the changed scope to be checked again.

The tool does not decide cutting feasibility, machine power, process safety, quality compliance or contract enforceability.
Ask the supplier about machine-specific speed, gas, thickness limits, inspection criteria and delivery.
If quantities or rates are unconfirmed, leaving the result pending is more accurate than filling blanks with invented zeros.

Frequently asked questions

Is cutting length enough to calculate a quote?

It can show part of the length charge, but the final comparison is held while material, piercings, setup, minimum, finishing, shipping or tax are unknown.
Other rates are not inferred from thickness or length.

Is material area per piece or for the whole lot?

The supplier’s billed area is m²/lot.
Do not multiply an area already covering the full quantity again.
Only cutting length and piercings are entered per piece.

Do included and zero mean the same thing?

They may add the same amount but describe different commercial terms.
Included means the fee is already in another charge; separate zero confirms a separate item with a zero amount.
Unknown confirms neither.

Why can customer-supplied material look cheaper?

Only the supplier material charge is zero here; the customer’s external purchase is excluded.
Mixed ownership holds the lowest-price ranking, and external material spending must be checked separately.

Should I add the minimum charge on top?

No.
The larger of the covered subtotal and the minimum is used.
Select processing-only or material-inclusive scope from the contract, then inspect the uplift rather than adding the entire minimum again.

Can repeat setup always be zero?

Enter zero only after the supplier confirms it.
Program reuse and waived machine setup are different terms.
Unknown repeat setup holds only the repeat amount, independently of the initial total.

Which tax rate should I enter?

Use the transaction-specific tax treatment confirmed in the quote and with the supplier.
A confirmed percentage is required only for added tax; included or none adds no further tax.
Tax classification and deductibility are not calculated.

Are sensitivity and the lowest quote guaranteed?

Sensitivity changes only length under your assumption, and the lowest marker compares entered prices after all scopes are confirmed.
Neither guarantees production, delivery, quality or future pricing.
Use the worksheet to resolve omissions and terms first.

Sources, review date and next action

Primary supplier references for quote structure

Sources checked: 2026-11-23.
Public material from ABC Cutting Industries, Laserlea and PartFab supports the fact that material, quantities, setup and minimum-charge scope differ by supplier.
Their published overseas amounts have not been adopted as Korean standard rates.
Actual prices in this calculator come from your quote inputs.

Open your quote and start with quantity

When totals differ, reconcile material, piercings, minimum charges and unresolved items before choosing the smaller number.
Use the TXT worksheet or printout to request a matching-scope revised quote, then confirm the order quantity.
Recheck rates, inclusion, tax, validity and repeat-order terms for every order.