3D Printing Slicer & Plate Quote Audit

Audit two quotes using slicer-confirmed part and support mass and build time.
Include plate minimums, finishing, shipping and tax to compare lot totals and effective unit costs in KRW.

Enter slicer / supplier-confirmed mass and time for an identical repeated full plate. Units are g, hours and KRW; part and support rates are separate. Blank means unknown; zero means confirmed free or not applicable.

Confirm each supplier’s minimum charges, finishing and tax terms. This tool does not upload models, slice files or assess strength or tolerances. Fictional example prices and tax rates are neither market averages nor legal defaults.

1. Common request and comparison scope

1–100,000 · whole numbers

0–90

2. Supplier quote A

Source and process confirmation
Whole-plate slicer results

1–10,000 · whole numbers

0–100,000 · whole numbers

0–1,000,000

0–1,000,000

0–1,000,000

0–10,000

Mass and time are for the entire full plate, not one part. They are not multiplied by parts per plate again. Confirm whether the last underfilled plate is charged at the same rate.

Material / machine rates and minimum charges

0–100,000

0–100,000

0–1,000,000

0–100,000,000

0–100,000,000

0–100,000,000

Finishing, shipping and tax

0–100,000,000

0–100,000,000

0–100,000,000

0–100,000,000

0–100

0–100,000,000,000,000

Enter zero for finishing already included in another rate to avoid double charging. Use the quote’s tax rate and shipping tax scope; this tool does not determine whether no additional tax is legally correct.

3. Supplier quote B

Source and process confirmation
Whole-plate slicer results

1–10,000 · whole numbers

0–100,000 · whole numbers

0–1,000,000

0–1,000,000

0–1,000,000

0–10,000

Mass and time are for the entire full plate, not one part. They are not multiplied by parts per plate again. Confirm whether the last underfilled plate is charged at the same rate.

Material / machine rates and minimum charges

0–100,000

0–100,000

0–1,000,000

0–100,000,000

0–100,000,000

0–100,000,000

Finishing, shipping and tax

0–100,000,000

0–100,000,000

0–100,000,000

0–100,000,000

0–100

0–100,000,000,000,000

Enter zero for finishing already included in another rate to avoid double charging. Use the quote’s tax rate and shipping tax scope; this tool does not determine whether no additional tax is legally correct.

Enter the actual quotes and run the audit. Editing inputs hides previous results.

Check a 3D printing quote beyond finished-part weight

This calculator checks two vendor quotes using confirmed slicer material, build time and repeated plate charges.
It helps small manufacturers, workshops and product teams identify omitted supports, plate minimums, setup and finishing before ordering prototypes or a small production lot.
It does not upload a model, slice it automatically or infer a market price from its volume.

Orientation, layer height, infill, support settings and packing can change both weight and time.
Start with the vendor-confirmed slice and delivery specification.
A lower calculated amount does not establish strength, dimensional tolerance, surface quality or an achievable lead time.
Amounts remain in KRW in both languages; there is no currency conversion.

Questions before accepting a quote

Will both vendors deliver the same specification and quantity, remove supports and inspect the parts, and bill the last partly filled plate as a full plate?
These conditions can matter more than a small difference in headline price.

Input units, evidence and unknown costs

Whole-plate grams and hours

Enter part, support and purge grams for one complete plate, not for one part.
Enter the total billable build hours for that plate; 90 minutes is 1.5 hours.
The engine multiplies these values by the plate count and does not multiply them by parts per plate again.

Rates and source records

Material rates are KRW/g and machine rates are KRW/hour.
Part and purge use the part-material rate; support has a separate rate.
Record the vendor, process/material, source reference and checked date so the review can be traced to the original document.
A checked date does not guarantee the quote remains valid.

Blank means unknown; explicit zero means confirmed free, included elsewhere or inapplicable.
For a support-free job, enter confirmed zero support grams and a zero support rate.
A missing inspection line does not prove inspection is free.
Ask whether it is included, then enter zero for the separate charge to prevent double counting.
Missing required values or evidence withhold verified totals and comparison.

Plate rounding and minimum order quantity

Quantity formula

D=max(N, MOQ) · P=ceil(D/C) · capacity=P×C

N is requested units, MOQ is the confirmed minimum delivery quantity, C is parts per plate and P is the rounded-up plate count.
Capacity minus D is spare slots, not a promise of extra delivered parts.

Ten requested parts at four parts per plate require three plates, giving twelve slots and two spare slots.
This model repeats the same complete plate profile for every plate, including the last one.
Use it for confirmed full-plate billing or an explicitly conservative scenario.
It does not scale the last plate down linearly; request its actual sliced material, time and price when partial plates are billed differently.

If MOQ is twelve, finishing applies to twelve delivered units.
Cost per requested unit divides by ten while cost per delivered unit divides by twelve.
Do not substitute plate capacity for an actual minimum delivery commitment.
At least one requested unit is required; cancellation charges are outside this model.

Part, support, purge and machine charges

Cost of one plate

Material=(part grams+purge grams)×part rate+support grams×support rate
Machine=build hours×hourly rate
Plate charge=max(material+machine, plate minimum)

Purge records material used outside the product during extrusion or material changes.
Do not add a brim, raft or waste twice if it already appears in a part or support total.
If the report only provides combined material, ask for a breakdown or a confirmed compatible billing profile.
Multiple materials with different rates need a vendor-confirmed consolidated profile or separate reviews.

Use the machine occupancy time actually billed by the vendor.
Material-change time already included in build hours must not be added again.
Confirm whether the machine rate includes operator labor before comparing vendors.
The minimum-charge uplift explains why reducing grams may leave the plate bill unchanged.

Setup, wash/cure, support removal, inspection and shipping

Setup is charged once per order.
Wash/cure, support removal and inspection are charged per delivered unit, including units required by MOQ.
Shipping is charged once.
If finishing is quoted per hour or per plate, obtain a compatible confirmed price; dividing a lot charge into a unit rate may not remain valid at another quantity.
Confirm packaging coverage too.

Order of minimum charges

Order amount=max(P×plate charge+setup+D×unit finishing, order minimum)+shipping

The plate minimum is applied first; setup and finishing then enter the order minimum, and shipping is added afterward.
A contract that includes shipping in its minimum or excludes finishing from that minimum follows a different rule.
Ask the vendor to reconcile that rule before treating this result as comparable.

Neither plate minimums nor order minimums are universal industry rules.
Enter zero only after confirming that a minimum does not apply.
Leave an unconfirmed term blank.
A high minimum can hold the total constant even if material or time costs fall; review the component ledger and uplift together.

User-entered tax treatment and vendor-total differences

  • Added: add tax calculated using the confirmed percentage.
  • Included: keep the entered amount and show included tax as amount×rate/(100+rate).
  • No added tax: add zero; this does not determine legal exemption.

No statutory tax rate or taxable status is supplied automatically.
Use a consistent tax basis across all cost inputs.
Mixed treatment, such as differently taxed shipping, needs a reconciled quote.
Intermediate fractional costs are retained, then the amount and tax are rounded to whole KRW; a vendor using truncation may differ slightly.

The optional quoted payable total is compared with the reconstructed payable total.
Difference=vendor quoted total−checked total.
A positive result means the vendor figure is higher and a negative result means it is lower.
Neither proves overcharging: verify scope, rounding, delivered quantity, material and additional services before drawing a conclusion.

Worked example: two fictional quotes for ten parts

These figures are fictional calculation fixtures, not market averages or live vendor prices.
A uses four parts per plate, 80 g part material, 20 g supports, zero purge, KRW 50/g part rate, KRW 25/g support rate and five hours at KRW 1,000/hour.
Its plate minimum is KRW 12,000, setup KRW 3,000, unit wash/cure KRW 100, unit support removal KRW 200, inspection zero, shipping KRW 3,000 and order minimum zero.
Added tax of 10% is an example assumption, not an automatic legal rate.

Fictional A and B quote calculations for ten requested parts, amounts in KRW
ItemAB
Plates32
Material / plate (KRW)4,5005,625
Machine / plate (KRW)5,0006,000
Plate charge with minimum (KRW)12,00011,625
Order amount (KRW)45,00032,250
Assumed tax (KRW)4,5003,225
Total (KRW)49,50035,475
Per requested unit (KRW)4,9503,547.5

B uses five parts per plate, 100 g part material, 25 g supports, six hours and a zero plate minimum; other inputs match A.
The fictional total difference is KRW 14,025.
A vendor figure of KRW 50,000 differs from the checked A total of KRW 49,500 by KRW 500.
A has twelve slots with two spare; B has ten slots.
Confirm equivalent finished-part specifications and delivery scope before comparing the totals.

Failure and reprinting remain a separate scenario

Repeated-retry assumption

Extra plates=ceil(P×f/(100−f))

This assumes a constant independent full-plate failure probability f and retries until success.
It rounds expected extra attempts upward to a whole plate.
It is not a prediction of realized failures or a statistical confidence interval.
Zero means no extra plates; the input range ends at 90%.

For A, three base plates and an assumed 20% failure rate give one extra plate.
Adding KRW 12,000 of printing and applying the same tax assumption produces a separate scenario total of KRW 62,700, or KRW 13,200 above the base.
The confirmed base calculation does not change.
The scenario assumes no repeated setup, finishing or shipping charges, and no disposal charges; contracts with those charges need additional budgeting.

Actual spending depends on who bears reprint costs and whether a whole plate or only some parts fail.
No industry-average failure rate is supplied.
This model does not establish a customer obligation, warranty or right to remanufacturing.
Lead-time contingency and acceptance criteria still require a separate discussion.

Workflow, quantity boundaries and practical uses

  1. Request matching model, material, layer, finishing and delivery scopes.
  2. Record vendor, process/material, source reference and checked date.
  3. Copy confirmed whole-plate counts, grams and build hours.
  4. Enter rates, minimums, setup, finishing, shipping and tax; resolve missing inputs.
  5. Confirm equivalent scope, calculate, then save the TXT review or print it for the vendor.

The quantity table uses one fewer unit, the requested quantity and one more unit, deduplicated at the 1 and 100,000 boundaries.
At four parts per plate, increasing an order from four to five can add a complete plate.
The table reuses the same profile and does not predict quantity discounts or new packing efficiency.
Use it to identify when a fresh slice or revised quotation is worthwhile.

For a first prototype order, focus on missing inspection and support-removal scope.
For repeat production, compare the cost of repeating the confirmed plate.
Mixed models in a shared education or workshop order may need different plate profiles.
If one quote includes broader finishing, reconcile scope before treating a price difference as a purchasing decision.

Interpretation limits and review tips

Withhold comparison until evidence is complete

Unknown required costs or evidence leave verified totals unavailable, while known components remain inspectable.
Even two complete quotes require your equivalent-scope confirmation before a total difference is presented as comparable.
If MOQ changes delivered quantity, consider whether the additional parts are useful.

This calculator does not assess machine size, support feasibility, shrinkage, deformation, tolerance, strength, skin contact or industrial safety.
The same FDM, SLA or SLS label can cover different material and postprocessing conditions.
Review different plate types, multiple material rates or mixed tax treatment separately.
A matching arithmetic total is not a contract or manufacturing suitability judgment.

The saved review includes original inputs.
Check source labels for private contact details or confidential drawing names before sharing.
Inputs are not automatically submitted to a printing vendor.
Recalculate when conditions change and retain the new source and date.
Do not reuse fictional example prices as contract terms.

Frequently asked questions

Can I upload an STL for an automatic quote?

No.
Enter vendor-confirmed or slicer-confirmed grams, hours and plate capacity.
The calculator does not infer supports or packing from a drawing.

How do I enter a support-free job?

Enter confirmed zero support grams and support rate.
A blank is unknown, whereas explicit zero records confirmed free or inapplicable scope.

Is a half-filled final plate half the price?

It is not scaled automatically.
This is a repeated full-plate billing model.
Obtain the actual partial-plate slice and contract price separately.

What is covered by minimum charges?

The model applies a plate minimum, then adds setup and unit finishing before the order minimum, then adds shipping.
Different contract ordering needs reconciliation.

Is 10% tax applied automatically?

No.
Confirm the rate and whether it is included.
The 10% figure is fictional example input; no-added-tax does not determine legal exemption.

Is the 20% failure assumption measured data?

No.
It is fictional user input for an independent repeated-retry scenario, not realized failure counts, customer liability or a reprint entitlement.

What do unit cost and quoted-total difference mean?

Requested-unit cost divides by requested units; delivered-unit cost uses MOQ-adjusted delivery.
Quote difference is vendor payable total minus the checked payable total.

Should I immediately select the cheaper quote?

First confirm material, quality, finishing, delivery, lead time and reprint responsibility.
A price difference starts the discussion and does not guarantee suitability.

Primary sources and your next step

Sources checked on 2026-11-18

Prusa documents sliced material and time as well as preparation and postprocessing costs.
ONECLICK FACTORY and 3DFARM describe material, support, purge, machine time, base charges and shipping components.
Published prices are not copied as defaults; plate minimums and failure assumptions are not presented as universal rules.
Recheck the original quote and current service coverage for every order.

Take the review back to the vendor

Resolve missing inputs, save the TXT review and request the slice report, plate plan and finishing scope.
For a subtractive alternative, the CNC machining time and lot quote calculator checks a different process.
Confirm manufacturing suitability and quality requirements separately with the supplier.

Related calculators