Fixed LED Display Module Order, Resolution & Power Calculator

Review order quantities, native resolution, purchase budget and operating power from a confirmed wall array.

1. Wall specification from the confirmed drawing

Use one unit type in integer rows and columns allowed by the supplier. Enter manufacturer native pixels directly, without inferring them from rounded pitch. After changing the purchase unit, recheck that dimensions and pixels describe that unit.

Start with the target width on your drawing

Enter the target wall width in mm, then add the array confirmed by your supplier.

Plan the complete order for a permanent LED display

A price per square metre can hide the parts required for a shop or community facility display.
The target size may differ from the screen made by an integer array, and spare modules, packaging and minimum order quantities can increase the purchase above the installed quantity.
This calculator separates those quantities for one supplier-confirmed module or cabinet type.

Read the actual dimensions, native resolution and installation versus order quantities first.
Purchase and installation funds and annual energy costs are supporting results based on your confirmed quote and operating assumptions.
Send the saved report to the manufacturer and electrical contractor to confirm the screen configuration, spare compatibility, scope and onsite work.

Supported purchasing task

The model supports a permanent rectangular display using one product type.
It does not calculate event rental periods, video crew billing or removal settlement for an existing sign.
For mixed products, curved displays or irregular arrays, request a separate configuration instead of entering average unit dimensions.

Prepare the drawing, specification and quotation

  1. Start with the target screen width in mm, then enter the target height from the reviewed installation drawing.
  2. Confirm the product model and quote revision, physical dimensions in the installed orientation, columns, rows and native pixel counts.
  3. Choose modules or complete cabinets with built-in modules, then record requested spares and the pack size and minimum order quantity for each SKU.
  4. Align actual unit prices, controller, installation, reinforcement and electrical work inclusions, and any additional tax.
  5. Confirm average and maximum consumption units and the average measurement conditions before entering operating hours, annual days and an assumed energy price.

Move between the screen specification, order and quotation, and operating power panels as you collect information.
Blank means unknown; it is different from a confirmed zero or a confirmed free item.
Partial inputs show the dimensions, quantities and known cost subtotal that can already be calculated.
You can open the worked example and then restore your previous values and editing panel.

Use the correct purchasing unit

Buying modules

One array unit is one module.
Add requested spare modules to the installed module count, then apply the pack size and MOQ for that module SKU.
Cabinet prices and cabinet-only built-in module counts are not added in this mode.

Buying complete cabinets

One array unit is a complete cabinet whose price includes its built-in modules.
Those installed modules are not charged again as loose modules.
Apply separate pack sizes, MOQs and prices to cabinet purchases and loose replacement module purchases.

Enter the actual number of modules per cabinet from its bill of materials.
Cabinets with similar external dimensions can have different internal modules, connectors and replacement compatibility.
Modules inside surplus complete cabinets and separately purchased loose modules are different stock categories; the calculator does not offset one against the other.
Ask the manufacturer whether modules can be removed from a surplus cabinet for use as spares.

Calculate the actual integer array and native resolution

Screen formulas

Installed units N = columns × rows
Actual width W = unit width × columns
Actual height H = unit height × rows
Area A(m²) = W(mm) × H(mm) ÷ 1,000,000
Horizontal pixels = native horizontal pixels per unit × columns
Vertical pixels = native vertical pixels per unit × rows

The pixel aspect ratio is reduced using the greatest common divisor of the complete horizontal and vertical pixel counts.
Compare each physical axis with the target: equal area does not make up for insufficient width or height.
An excess dimension also affects the wall, finishing and maintenance access, so a larger array is not automatically suitable for the site.
The calculator does not design or approve arbitrary combinations.

Targets range from 1 to 100,000mm per axis and unit dimensions from 1 to 10,000mm, with up to three decimal places for physical unit dimensions.
Columns and rows must each be integers from 1 to 500; native pixels per unit must each be integers from 1 to 20,000.
These are software input limits, not installation safety limits or manufacturer-approved combinations.

Do not infer native pixels from rounded pitch

Use the native pixel array confirmed by the manufacturer.
For example, the official ROE Visual Black Pearl BP2V2 specification lists a 500×500mm panel, 2.84mm pitch and 176×176px separately.
500÷2.84 is approximately 176.056, so dividing by a rounded published pitch cannot establish every product’s native integer pixel count.
Confirm the pixel map for the actual model, orientation and revision.

A known pixel count does not establish controller support, input video compatibility, signal mapping or content production requirements.
More horizontal pixels alone do not determine brightness, camera performance, viewing distance or readability.
The EX-500 worked example below is fictional and has different specifications from this manufacturer example.

Round requested spare modules from the installed module count

Confirmed count or percentage

Installed modules M = N × built-in modules per unit
In module mode, modules per unit = 1
Percentage mode: requested spares S = ceil(M × spare percentage ÷ 100)
Count mode: requested spares S = confirmed integer count

ceil means round upward to the next integer when a fractional remainder exists.
A 5% spare allowance on 96 installed modules requests 5 modules rather than 4.8.
This is the requested quantity before packaging is applied.
Use a confirmed count if a replacement policy already specifies it; the calculator does not recommend a universal spare percentage.

Confirmed spare counts range from 0 to 1,000,000 integers, and percentages from 0 to 100% with up to three decimal places.
Zero means that no spare is requested and differs from an unknown input.
Confirm batch, colour, connector, control compatibility, storage conditions and future availability with the supplier.
A calculated quantity does not establish compatibility or adequate stock.

Apply pack sizes and MOQ to the same SKU

If required quantity R = 0, order quantity Q = 0
If R is positive, Q = ceil(max(R, MOQ) ÷ pack size P) × P
Pack/MOQ surplus = Q − R

MOQ means minimum order quantity.
A requirement of 5, a pack of 4 and MOQ 0 produces an order of 8; a requirement of 1, a pack of 4 and MOQ 10 produces an order of 12.
The explicit policy is no automatic purchase when demand is zero, even if an MOQ exists.
Discuss contracts that require a minimum purchase without positive demand separately with the supplier.

  • Module mode: round the combined installed and requested spare quantity for one module SKU.
  • Cabinet mode: round installed cabinets with the cabinet pack/MOQ, and requested loose spares with the module pack/MOQ.
  • Unconfirmed packaging or MOQ: confirm whether single units are sold before treating an assumed contract condition as final.
    Check any displayed structural defaults against the actual quote.

Combining different SKUs before rounding, or separately rounding spares that belong to the same module order, can produce the wrong purchase quantity.
Pack size must be a positive integer and MOQ a non-negative integer.
For partial packs, minimum order values or quantity price tiers, request a quotation that fits this quantity model.

Separate included costs and actual additional tax

Module purchase = ordered modules × module price
Cabinet purchase = ordered cabinets × cabinet price including built-in modules + separately ordered modules × module price
Required funds = purchase + separate quote charges + actual additional tax

Mark the controller, installation, reinforcement, electrical work and other charges as included, separate or unknown.
Included contributes no extra charge and ignores a previously entered separate amount.
For a separate charge, enter the actual flat amount, including zero if confirmed free.
Unknown costs keep the complete funding total pending while preserving the known subtotal.

Unit prices and separate amounts accept integer KRW from 0 to 100,000,000.
If the loose module order in cabinet mode is zero, that purchase line is zero even when its unit price is unknown.
Calculations exceeding the JavaScript safe integer range are rejected.
Align the unit and supplied scope of every price, and include purchases added by packaging in the funding requirement.

Choose tax included, no additional tax, separate or unknown; for separate tax, enter the actual additional amount from the quote.
The calculator does not infer a statutory rate or tax exemption.
For mixed tax treatment, normalize the line items and add the extra tax only once.
Initial required funds and annual operating energy costs describe different time periods and should be read separately.

Worked order: a fictional 3m×2m display

Assume a fictional EX-500 cabinet measuring 500×500mm, with 192×192 native pixels and 4 built-in modules.
For a 3,000×2,000mm target, 6 columns and 4 rows give 24 cabinets, 96 installed modules, 6m² and 1,152×768px.
The pixel aspect ratio is 3:2 and a 5% spare allowance rounds up to 5 modules.
All specifications, prices and operating conditions in this example are illustrative, not a commercial product or a market average.

Fictional EX-500 installed and requested quantities versus packed purchase quantities
ItemRequiredPack / MOQOrdered
Complete cabinets (count)245 / 025
Loose spare modules (count)54 / 08
Modules inside surplus cabinets (count)—1 cabinet × 44

The order includes one cabinet above the installed quantity, containing 4 modules.
The loose module order consists of 5 requested spares and 3 packaging extras.
The calculator does not automatically reduce loose spares because surplus cabinets contain modules.
By contrast, in module mode, 24 installed modules with 5% spares request 2 extras; a pack size of 4 rounds the combined requirement of 26 to an order of 28.

Worked funds of KRW 8,660,000 and annual energy costs

Purchase and installation

25 cabinets at KRW 300,000 cost KRW 7,500,000.
8 loose modules at KRW 20,000 cost KRW 160,000, giving a purchase total of KRW 7,660,000.
Add a KRW 200,000 controller, KRW 500,000 installation and KRW 300,000 electrical work; mark reinforcement and other costs included and no additional tax to obtain KRW 8,660,000.

Screen energy budget

24 installed cabinets at an assumed average of 100W and maximum of 200W per cabinet give 2.4kW average and 4.8kW maximum.
Record the fictional average condition as 50% brightness with mixed video.
10 hours/day for 300 days/year gives 7,200kWh/year; an illustrative KRW 150/kWh produces KRW 1,080,000/year.

The 1:2 average-to-maximum relationship is an input to this fictional example, not a universal LED consumption factor.
Although 25 cabinets are purchased, only the 24 installed cabinets consume screen power in the calculation.
Surplus cabinets and replacement modules in storage are not assumed to be running.
When replacing this example with a real model, change the average measurement conditions and units as well as the dimensions and prices.

Keep average operating energy separate from maximum power

Power and energy formulas

Per-unit input: average kW = average W × installed units N ÷ 1,000
Per-area input: average kW = average W/m² × actual area A ÷ 1,000
Apply the same basis to confirmed maximum W to obtain maximum kW
Annual kWh = average kW × operating hours/day × operating days/year
Assumed annual energy cost = round(annual kWh × KRW/kWh)

W/m² and W/cabinet are different units.
Average and maximum inputs share the selected basis; ask the supplier to align specifications received in different units.
Operating time accepts 0–24 hours/day, and annual days accept integers from 0–366.
Power, time and unit price allow up to three decimal places; the user-supplied price ranges from KRW 0–10,000/kWh and is not a built-in current tariff.

Confirm average consumption with brightness, content and measurement conditions.
If the condition is blank, annual energy and cost remain pending; a missing maximum is never filled from an assumed multiple of average.
Average consumption above maximum on the same basis is an input error.
Confirmed zero operating hours or days means zero usage, but differs from missing average power or an unknown price.

Electrical design and the actual bill require separate review

The annual figure is a variable screen energy budget.
It does not automatically include standing or demand charges, tiering, power factor, taxes, controllers, cooling or standby consumption.
Maximum kW is information to send to an electrical contractor; it does not select breakers, cables, distribution equipment or power supply ratings.
Obtain professional review of inrush current, the onsite circuit, structure, installation and applicable procedures.

Use cases and the pre-order checklist

Permanent shop information display

Compare the target wall dimensions with the actual array and confirm finishing and service access.
Send the inclusion list so spares, control equipment and electrical work are addressed in the funding requirement.

Facility annual operating plan

Change operating hours and annual days to examine energy budgets for the same display.
When brightness or content changes, request average consumption for those conditions instead of retaining an unrelated previous average.

  • Record confirmation of the manufacturer’s array, pixel map, module compatibility and quote revision.
  • Record professional review of the support, installation method and maintenance access.
  • Send maximum power information and record the electrical scope and onsite power review.

Checklist selections record your confirmations; they are not automatic performance, safety or permit approvals.
Save a TXT report or print the inputs, units, conditions and outstanding items to discuss the same figures with suppliers.
When the quotation changes, recheck MOQ, packaging, built-in modules and average power conditions as well as prices.

Frequently asked questions

Does entering a target size produce an optimal array?

Enter integer columns and rows accepted by the supplier.
The calculator shows differences from the target but does not optimize the configuration or approve combinations or onsite fit.

Can I calculate resolution from pixel pitch alone?

Published pitch can be rounded, so use the model’s native pixel counts.
The official BP2V2 example of 500mm, 2.84mm pitch and 176px demonstrates why division may not equal the native integer count exactly.

Are modules inside a cabinet charged separately?

Cabinet prices in this model include built-in modules.
Installed built-in modules are not added again; the loose module price applies only to the separate module order.
If a quote prices empty frames, obtain a complete-cabinet quote before using this mode.

Does MOQ apply when I request zero spares?

A confirmed zero separate spare-module requirement produces a zero separate module order.
MOQ and packaging apply only to positive demand.
In module mode, the module order conditions apply to the positive combined installed and spare requirement.

Can average power be half the maximum?

There is no universal ratio for every product.
Use an average verified for the specific model, brightness, content and measurement conditions.
Without average conditions, annual usage and cost remain pending.

Is annual energy cost the final electricity bill?

It is the confirmed average screen power multiplied by operating time and your KRW/kWh assumption.
Standing and demand charges, taxes, cooling, controllers and standby consumption require separate confirmation.

Should I enter zero for an unknown price?

Leave it blank to preserve the unknown state.
Use a separate zero for a confirmed free charge, or included when another line already covers it.
The pending complete total remains distinct from the known subtotal.

Can the report select a breaker or determine permit requirements?

Maximum kW and the checklist are information for your manufacturer and electrical contractor.
They do not select circuits, breakers, cables or supports, or determine brightness, viewing distance or permit compliance.
Obtain the necessary site-specific professional review.

Official specifications and update policy

Sources were checked on 2026-11-29.
They support distinctions between pixels, dimensions and power units, not universal product defaults or standard prices.
The calculator does not apply statutory tariffs or permit rules; it uses actual additional tax and user-confirmed quotation conditions.

  • Samsung IE015A-F / LH015IEACFS/ZA official specification: native 160×360 pixels, 1.5mm pitch and maximum consumption of 463W/m².
    The current page checked has no average power value; average is not inferred from maximum.
  • ROE Visual Black Pearl official specification: BP2V2 measures 500×500×90mm with 176×176px and 2.84mm pitch; maximum 190W and average 95W are per panel.
    The manufacturer describes reference specifications and variation in actual use, and the page does not identify the average brightness/content test conditions.

Reconfirm dimensions, built-in parts, MOQ, packs, prices, average conditions, maximum consumption and work inclusions whenever the model or contract revision changes.
Check source links at least every six months and prioritize the specification revision applicable to the actual contract.

Confirm the same numbers before ordering

Start with the target width, then review the actual screen and ordered quantities.
Save the separated spare, packaging surplus and inclusion results to make your supplier questions precise.
Send average conditions and maximum power to the electrical contractor, resolve outstanding items, and finalize the purchase and installation quotation.