Stage LED Wall, Setup & Crew Quote Calculator
Check cabinet layouts and compare up to four actual quotes, including setup, video crew and round-trip delivery in KRW.
Compare the complete LED wall rental scope
A panel price alone may leave out the processor, support structure, power distribution, video technician, delivery, setup or strike.
This calculator compares up to four actual quotes for a professionally confirmed stage screen specification.
It separates the requested screen from the supplied cabinet layout and calculates physical dimensions, native pixel resolution, billing blocks and the quoted total.
Family-event organizers, small business owners and event staff can use the result to identify missing work before signing a rental contract.
All prices are in Korean won, KRW.
The loaded example is fictional arithmetic data, not a current market price, fair-price benchmark or booking offer.
No statutory tax rate or Korean legal eligibility is inferred.
Have the drawing and quote ready
Collect the target width and height, cabinet model and dimensions, native pixels per cabinet, columns and rows, rental billing duration and technician attendance time.
Also retain the quote reference, validity dates and item inclusions.
After calculating, send the saved missing-item checklist to the supplier and request a revised quote covering the agreed setup, strike, power and operating scope.
Separate the target from the supplied layout
Common requirement
The first field is target screen width in mm.
Enter the target height in the same unit, rental hours, technician attendance hours and the date on which you intend to accept the quote.
Targets allow 1–100,000mm per axis, rental time 1–8,760 hours and technician time 0–8,760 hours.
These are application limits, not industry standards or installation permissions.
Each supplier’s actual cabinets
Use the dimensions, orientation, native pixels, columns and rows of the layout actually offered.
Cabinet dimensions allow 1–10,000mm per axis, columns and rows 1–200 each, and native pixels 1–10,000 per axis.
If the supplied screen exceeds the target and the contract bills that actual quantity, retain the full supplied cabinet count or area.
The model assumes one cabinet type in a rectangular array and one uniform panel price per billing block.
Mixed cabinets, curved walls, stepped layouts and multiple screens may not fit this model.
Ask the supplier for a comparable breakdown instead of substituting an average cabinet size that changes the actual quantity or price.
Physical area and native pixel formulas
Dimensions and pixels are calculated separately
Cabinet count = columns × rows
Actual width = cabinet width × columns
Actual height = cabinet height × rows
Area (m²) = actual width (mm) × actual height (mm) ÷ 1,000,000
Horizontal pixels = native cabinet horizontal pixels × columns
Vertical pixels = native cabinet vertical pixels × rows
Width and height are checked against their respective targets.
Equal area does not establish a match when one axis is too short.
A fictional 500×500mm cabinet in 12 columns and 6 rows gives 72 cabinets, 6,000×3,000mm and 18m².
At 192×192 native pixels per cabinet, the wall is 2,304×1,152px.
The supplier still needs to confirm the source-content aspect ratio, pixel map and signal path.
Pixel pitch is retained for specification comparison, not used to reconstruct an exact pixel count.
ROE Visual lists the Black Pearl BP2V2 at 500×500mm, 2.84mm pitch and 176×176px.
Dividing 500 by the rounded pitch does not produce exactly the stated integer resolution.
Use the manufacturer’s native pixel specification for the actual model.
That real manufacturer example is different from the fictional EX-500 used in the worked calculation.
Round rental duration to the contract’s billing blocks
Per-cabinet or per-area price
Billed blocks B = max(minimum blocks, ceil(rental hours ÷ block hours))
Panel charge = cabinet count or actual area × unit price per block × B
ceil rounds a positive remainder up to the next integer.
For a 24-hour block, 24 rental hours use one block and 25 hours use two.
A three-block minimum overrides a calculated one-block duration.
Keep each supplier’s actual per-cabinet or per-m² basis when comparing quotes.
Rental hours should reflect the contract’s chargeable period, including agreed delivery, prior-day setup, storage or return arrangements where applicable.
Do not enter only the live-event duration unless that is the contracted billing basis.
Block hours allow 1–8,760, minimum blocks 1–365, and a unit price allows KRW 0–100,000,000.
These limits do not establish a standard rental day or discount.
First-day pricing, discounted extra days, minimum package prices and mixed rates may not be represented by one uniform unit price multiplied by blocks.
Confirm with the supplier that a quote normalized to this model preserves its contractual total.
Otherwise, an internally correct calculation can still differ from the invoice.
Technician attendance is separate from equipment rental
Separately charged crew
Billed crew hours = ceil(attendance hours ÷ billing increment) × billing increment
Crew charge = people × billed crew hours × hourly price per person
A wall may be rented for 25 hours while a technician attends for eight hours.
Enter those durations independently.
Separate crew allows 1–100 people, a 1–24-hour billing increment and the actual hourly price per person.
Eight attendance hours with a three-hour increment become nine billed hours.
Zero attendance produces a zero calculated crew charge; it does not establish that operating support is unnecessary or free.
Select included when crew is already covered by the package to avoid charging it twice.
Different setup and operating teams, shifts, overnight premiums, meals or accommodation may not fit a single crew count and hourly rate.
Obtain confirmed normalized terms or record a genuinely separate agreed charge once in the appropriate additional item.
Check every inclusion from processor to return transport
- Processor and controller: confirm video processing, scaling, signal connections and necessary supporting equipment.
- Structure: confirm ground support or hanging arrangements, associated equipment and responsibility for the work.
- Power and cables: confirm distribution, cabling and the boundary of the venue electrical connection.
- Setup and strike: distinguish delivery access, assembly, alignment and testing from dismantling and removal.
- Round-trip transport and other charges: check both delivery and collection plus actual access, parking or stair-carrying costs.
Unknown is different from confirmed zero
Included items add zero extra cost and ignore any retained separate price.
For a separate item, enter the confirmed lump sum, including zero only when a free charge is confirmed.
Leave an unknown amount blank.
An unknown or unprovided required item blocks comparison instead of silently becoming a low zero price.
If a processor appears in both the package and a separate equipment list, establish where it is charged and count it once.
Avoid repeating setup or delivery costs under other charges.
The checklist helps identify questions; it does not calculate structural loads, wind loads, electrical capacity or installation safety.
Confirm tax, validity and equivalent scope
The tax choices are VAT included, no additional tax, separate tax and unknown.
For separate tax, enter the quote’s actual additional tax amount in KRW.
The calculator does not decide a statutory rate or exemption.
Ask the supplier to normalize a mixed quote, such as tax-inclusive equipment and tax-exclusive transport, to one consistent basis.
Included or no-addition modes do not add tax again.
Quoted total = round(panel charge + crew charge + separate lump-sum charges + actual additional tax)
Intermediate amounts remain unrounded; the final total is rounded to whole KRW.
The intended acceptance date must fall within the quote’s effective start and expiry dates.
A complete price does not establish a comparable offer if the quote reference or model is missing or either screen dimension falls short.
Have the supplier or qualified venue professional confirm equivalent image requirements, brightness and processor support, the full schedule, structure and installation method, and power and site review.
Selecting those confirmation boxes records a reported check; it is not an automated approval.
Worked example: two quotes for a 6m×3m screen
The fictional common requirement is 6,000×3,000mm, 25 rental hours, eight crew hours and acceptance on 2026-11-24.
Both suppliers offer the fictional EX-500 model with 2.604mm pitch, 500×500mm cabinets and 192×192px per cabinet, arranged in 12 columns and six rows.
That gives 72 cabinets, 18m² and 2,304×1,152px.
A 24-hour block and one-block minimum yield two billed blocks.
All prices and tax amounts below are example inputs, not market observations or a universal tax rate.
| Item | A (KRW) | B (KRW) |
|---|---|---|
| Panels · A 20,000/cabinet; B 80,000/m² per block | 2,880,000 | 2,880,000 |
| Crew · A 1 person × 8 hours × 50,000 | 400,000 | Included |
| Processor / structure | 100,000 / 300,000 | Included |
| Setup / strike / round-trip transport | 150,000 / 100,000 / 100,000 | Included |
| Power and other | Included | Included |
| Subtotal before additional tax | 4,030,000 | 2,880,000 |
| Actual additional tax | 403,000 | 0 |
| Quoted total | 4,433,000 | 2,880,000 |
Once every scope and confirmation condition is satisfied, B is KRW 1,553,000 lower.
If B’s technician or support structure is unknown, its visible panel price does not prove a lower complete cost.
Changing the target width to 6,001mm makes both offered screens 1mm short, so comparison is held.
Read totals and panel-price sensitivity correctly
Known subtotal and final quote
Partial inputs retain calculable charges as a known subtotal and list outstanding questions.
That subtotal is neither a maximum nor a confirmed contract total.
A lowest amount, ties and the highest-to-lowest difference appear only when at least two quotes exist and every entered quote has complete amounts, matching scope, valid dates and required confirmations.
A single quote has no ranking.
Panel price ±10%
This scenario changes only the panel unit price by 10% in either direction.
Cabinet count or area, blocks, crew, other costs and the entered tax amount remain fixed.
Example A becomes KRW 4,145,000–4,721,000 and B becomes KRW 2,592,000–3,168,000.
It is not a price forecast or available discount.
A revised real price requires the supplier to reconfirm tax as well.
Higher resolution or a lower price does not automatically establish the more suitable screen.
Content readability, viewing distance, brightness, camera flicker, indoor or outdoor conditions and processor input limits still need technical confirmation.
Do not rank different designs on price alone before the supplier confirms equivalent required scope.
From first input to a revised quote
- Set common conditions. Enter the target, contractual rental hours, technician attendance and intended acceptance date.
- Copy the offered layouts. Confirm each model, dimensions, native pixels, columns, rows and quote validity.
- Normalize charges and inclusions. Enter the panel price basis, block hours and minimum, crew billing, additional work and actual tax.
- Obtain professional confirmation. Record only completed checks of the specification, full schedule, structure and power arrangements.
- Save the review. Use the TXT report or print action to retain quantities, amounts and missing items, then ask the supplier for a revised quote.
Supplier tabs preserve their inputs, and the result’s edit action returns to the relevant quote.
Load the fictional example to understand the calculation, then restore the previous inputs to continue reviewing actual offers.
When sharing a report, retain only necessary specifications, quantities, prices and quote identifiers rather than unnecessary personal details.
Practical scenarios and model limits
Family or shop event
When comparing the venue’s existing screen with an outside LED wall, align responsibility for playback, delivery access and removal first.
An available wall socket does not establish that power distribution or necessary cabling is supplied.
Keep the event budget and rental ledger separate so the same video operation charge is not added twice.
Presentation or outdoor event
Explain the text and video content, camera use, access windows and weather arrangements to the supplier.
Structural supports, ballast, hanging systems, venue permissions and electrical review remain professional tasks.
This quoted-total model does not automatically calculate backup equipment, weather cancellation, postponement, damage liability, security deposits or dated cash requirements.
Check those contract terms separately.
Frequently asked questions
Why not calculate pixels directly from pitch?
Published pitch can be rounded.
Use the manufacturer’s native integer pixels per cabinet and retain pitch and model for specification comparison.
Are two 18m² screens equivalent?
Their dimensions, aspect ratios, resolution, brightness and operating environment may differ.
Each axis is checked against the target, and equivalence still needs supplier confirmation.
Can I compare per-cabinet and per-m² prices?
Yes, using each actual supplied cabinet count or area and its block price.
Match the required scope, duration, inclusions and tax basis first.
Why does slightly exceeding 24 hours increase the charge?
The model rounds up to the next contracted billing block.
Reconfirm whether a real extra-day discount or different tariff fits the uniform-block model.
What happens to a retained price when an item is included?
The included state ignores its retained separate price.
Reconfirm that amount if you switch the item back to separately charged.
Does the calculator apply VAT automatically?
It does not apply a statutory rate.
Select included, no additional tax, separate or unknown, and enter the actual quoted additional tax when separate.
Why is comparison held even though a total is visible?
The offered dimensions may be short, a required item may be unknown, or quote identification, validity and professional checks may be incomplete.
Resolve the listed questions before comparing.
Can the result approve an installation?
No.
It is a quantity and cost ledger, not a structural, wind-load, electrical, installation-safety, image-quality or contract-validity assessment.
Obtain the appropriate site and supplier review.
Sources, verification date and future checks
Sources were checked on 2026-11-24.
Manufacturer data supports the distinction between dimensions, pitch and native resolution.
Rental-provider pages support the scope checklist and the need to verify provider-specific billing.
Foreign supplier terms are not Korean standard prices or legal obligations.
- ROE Visual Black Pearl specifications — separate BP2V2 dimensions, pitch and native pixels.
- GeoEvent LED Video Wall Rental — processor, support, power, technician, setup, strike and transport scope.
- PixelPro LED Screen Rental — package inclusions and differing extra-day and operating-time terms.
For every contract, reconfirm the model and revision, orientation and native pixels, minimum blocks, unit prices, extra-day rules, technician attendance, inclusions, tax, validity and structure and power review.
Turn missing items into a specific quote request
Enter the target and actual supplier offers above, then check area, resolution and billed blocks first.
Save the processor, structure, power, crew and round-trip transport inclusion checklist alongside the total and outstanding questions.
Use the confirmed equivalent scope to review the final installation and operation contract.
Related calculators
- Event Audio Rental Equipment & Time Quote CalculatorCompare actual audio rental quotes for matching equipment, channels and schedules, including crew, overtime and dated cash needs in KRW.
- Meeting Room Time, Setup & Equipment Bill CalculatorCompare up to four meeting room quotes in KRW using setup and teardown time, minimum booking blocks, overtime grace, equipment and cleaning charges.
- Projector Throw Distance & Screen Fit CalculatorCheck projector image dimensions, lens distances and wall fit using official throw ratios and verified vertical placement limits.
- Family Photo Package & Add-on Quote CalculatorCompare actual family photo quotes for matching people, groups, originals, retouched files and frame specifications in KRW.