Pallet Rack Bay, Shared Frame and Beam Order Calculator

Use confirmed dimensions and aisles to check rack rows, pallet positions and packed component orders with actual prices in KRW.

Enter order conditions

Use one rectangle excluding columns, doors and blocked areas. Each single-sided row has its own front aisle and rear clearance.

Use aisle, height and load specifications confirmed by your supplier and site manager. Shared opposing aisles, back-to-back and rotated layouts are excluded.

Order quantity summary

Enter the zone dimensions, then bays by row. Known quantities appear before you finish pricing.

Supplier and site checks before ordering

Send the drawing and worksheet to your supplier to check units, included accessories, packs, minimums, installation, transport and tax. Checkmarks record your review; they are not safety certification.

Related calculators

Order pallet rack parts by connected rows

Counting two frames for every bay can overstate an order when adjacent bays share a frame.
Treating separate rows as one continuous run creates the opposite problem: a new row needs its own end frame.
This pallet rack bay, shared-frame and beam order calculator turns supplier-confirmed dimensions and configurations into row quantities, nominal pallet positions, a bill of materials and a purchase budget.

Use the output to reconcile your drawing and supplier quotation before ordering.
The tool calculates quantities and costs; it does not approve rack loads, safe beam levels, floor strength, anchoring, forklift access or fire compliance.
Lengths use mm and amounts use KRW, including on this English page.
The arithmetic is not tied to a national tax rate or a statutory aisle standard, and foreign manufacturer examples are not adopted as Korean safety rules.

Have these documents ready

  • A measured usable rectangle excluding columns, doors, restricted zones and obstructions
  • The supplier drawing: clear beam span, frame post width, rack depth and bays in each continuous row
  • Confirmed front aisles, cross aisles, rear clearances and end and side reserves
  • Pallets at each beam level, floor positions and accessory BOM coefficients
  • Pack sizes, minimum order quantities, unit prices and separately charged delivery, installation and tax

The layout model and its boundaries

The model covers single-sided fixed rows with the same depth and orientation inside one rectangular zone.
Each row consumes its own front aisle and rear clearance; bay counts may differ between rows.
Start with the usable rectangle rather than the building’s total floor area.
If a column or doorway interrupts a run, record separate continuous rows and reconcile the resulting layout with the supplier.

Supported arithmetic

Count connected bays, shared frames, beam pairs, nominal pallet positions and confirmed accessory quantities.
Compare the resulting footprint with the rectangle, and view maximum bays per row and maximum rows for this same-orientation model when dimensions are known.

Requires a separate layout

Opposing rows sharing an aisle, back-to-back racks, mobile shelving, mixed depths, rotated rows and irregular floor plans are outside this model.
Reducing an input to imitate these arrangements does not validate their actual footprint.

Clear beam span is different from outside rack width

Enter every dimension in mm.
Clear beam span is the usable width between frames, while frame width is the post dimension along the continuous row.
The nominal product width, the beam’s overall width and the assembled rack’s outside width may all differ.
For example, a ULINE model distinguishes a 96-inch usable span, 3-inch posts and a 102-inch outside starter width.
These figures explain the distinction; they are not default dimensions for your supplier’s rack.

Dimension symbols and reserve totals

  • L and W: confirmed rectangle length and width
  • B, F and D: clear beam span, frame post width along the row, and rack depth
  • E: the combined reserve at both ends of a row
  • C: the total cross-aisle allowance deducted along the length
  • S: the combined side reserve across the rectangle
  • R and A: rear clearance and dedicated front aisle for each row

Do not enter only one end’s reserve when the field asks for both ends combined.
Likewise, do not deduct a cross aisle again if it has already been removed from your measured zone.
Confirm how pallet overhang, guards, door swings and receiving access appear in the supplier’s measured drawing.
Clear height, lift height, retracted mast height and loaded pallet height remain site checks; this floor-plan arithmetic does not compare them automatically.

Frame counts and footprint formulas

Every independent run starts and ends separately

Frames in a continuous n-bay row = n + 1
Total frames = total bays + independent rows
Frames saved versus standalone bays = Σ(bays in each row − 1)
Outside rack length for one row = n × B + (n + 1) × F

One four-bay row needs five frames in the confirmed shared-frame configuration.
Splitting those four bays into two independent two-bay rows needs six frames.
This sharing happens between adjacent bays along the run, not between separate racks placed behind each other.
Check the actual frame and connection design before adopting the n + 1 count.

Check length and width independently

Occupied length = longest row outside length + E + C
Occupied width = rows × (D + R + A) + S
Remaining length = L − occupied length
Remaining width = W − occupied width
Maximum bays per row = floor((L − E − C − F) ÷ (B + F))
Maximum rows = floor((W − S) ÷ (D + R + A))

Negative maximum-count results are treated as zero.
A positive remainder in one direction does not offset a negative remainder in the other direction.
The maximum counts describe only the restricted model above; they are not a warehouse optimization or a safe installation limit.
Missing or unconfirmed dimensions keep the dimensional check pending even when some part quantities are available.

Beam pairs, individual beams and nominal pallet positions

The beam order unit

Beam pairs = total bays × beam levels
Individual beams = beam pairs × 2
The beam price in this calculator is per pair.
Convert a supplier price per individual beam to the same unit before entering it.

Levels and floor positions

Beam-supported positions = bays × sum of confirmed pallets at each beam level
Floor positions = bays × floor pallets per bay
Target shortfall = max(target − total nominal positions, 0)
Enter a confirmed zero if no floor positions will be used.

Record pallets separately for each level instead of assuming that all levels hold the same number.
Floor positions add nominal pallet positions without adding a beam level or more beam pairs.
Nominal positions do not account for operational utilization, inspection holds, damaged pallets, turnover, height conflicts or load restrictions.
Confirm pallet dimensions, loaded height and orientation on the actual drawing before treating the count as useful storage.

From accessory coefficients to purchase quantities

Anchors use a confirmed count per frame, safety pins per individual beam, and guards per row.
Do not carry another manufacturer’s coefficient into your order: locking devices may be integrated, and accessories may already be included in a package.
Enter zero only when the lack of a separate requirement has been confirmed.
A blank coefficient means the required quantity is unknown, not that the part is unnecessary.

Pack sizes and minimum orders

Required quantity = basis quantity × confirmed coefficient
If required quantity is zero: purchase quantity = 0
If required quantity is positive: purchase quantity = ceil(max(required quantity, MOQ) ÷ pack size) × pack size
Quotation difference = quoted quantity − calculated purchase quantity

A requirement for 40 anchors sold in packs of 25 becomes an order for 50.
A requirement for 96 pins sold in packs of 50 becomes an order for 100.
MOQ is the minimum number of pieces or pairs, while pack size is the quantity in one package.
With a 60-piece MOQ and 25-piece packs, the order rounds up to 75, not 60.
The excess is purchasing surplus caused by the contract terms; it does not increase the installation requirement.

Quoted quantities are compared against the pack- and MOQ-adjusted purchase quantity, not the raw requirement.
A negative difference means the quotation is short against that order quantity; a positive difference needs an explanation such as spare parts or extra scope.
Leave quoted quantity blank to skip that comparison.
If the supplier quotes packages, convert them to pieces or beam pairs first.

Partial inputs and unknown prices

The calculator does not fill blank dimensions, coefficients or prices with assumed market standards.
A known row and level configuration can support quantity checks before the space check is complete, but an incomplete row must not be silently discarded as a zero-bay row to finalize the whole BOM.
Known quantities can therefore appear alongside unknown accessories and prices.
The confirmed subtotal adds only known purchase quantities multiplied by known unit prices and known separate charges.

A confirmed subtotal is not a final total

If delivery, installation, separately charged tax or another required amount remains unknown, the final total stays pending.
Enter the actual separately charged tax amount from the quotation; the tool does not apply a fixed tax rate.
Avoid adding delivery, installation or tax again when it is already included in the entered part prices.

Confirmed free delivery or no additional tax may be recorded as zero.
Unknown charges should remain blank so that a provisional subtotal does not masquerade as a complete contract price.
Keep the pending markers in the saved report so the supplier can identify what still needs confirmation.

Worked example: two rows, eight bays and 64 positions

This is a fictional arithmetic example, not a current price list, aisle recommendation, safe level count or installation specification.
Use a 13,000mm by 10,000mm rectangle, a 2,700mm clear span, 100mm frame width and 1,100mm rack depth.
Create two independent rows with four bays each.
Enter 400mm combined end reserve, 1,000mm total cross-aisle allowance, 400mm combined side reserve, and 200mm rear clearance plus a 3,000mm dedicated front aisle per row.

Verify dimensions and quantities first

  • Row outside length: 4 × 2,700 + 5 × 100 = 11,300mm
  • Occupied length: 11,300 + 400 + 1,000 = 12,700mm; remaining length: 300mm
  • Occupied width: 2 × (1,100 + 200 + 3,000) + 400 = 9,000mm; remaining width: 1,000mm
  • Eight bays and ten frames; six fewer frames than sixteen frames for eight standalone bays
  • Three beam levels × eight bays = 24 beam pairs, or 48 individual beams
  • Two pallets at each of three levels: 8 × (2 + 2 + 2) = 48 beam-supported positions
  • Two floor positions per bay add sixteen: total 64 nominal positions; shortfall against a target of 70: six
Fictional BOM with required quantities, pack-adjusted purchase quantities and KRW costs
Part and unitRequiredOrderUnit price (KRW)Cost (KRW)
Frame, piece1010100,0001,000,000
Beam, pair242450,0001,200,000
Anchor, piece40501,00050,000
Safety pin, piece9610050050,000
Guard, piece4420,00080,000

The example assumes four anchors per frame in packs of 25, two safety pins per individual beam in packs of 50, and two guards per row.
Other parts use packs of one piece or one pair, and all MOQs are zero.
Parts total KRW 2,380,000; add delivery of KRW 100,000, installation of KRW 200,000 and a confirmed separately charged tax amount of zero to obtain KRW 2,680,000.
Zero additional tax is an example input, not a tax exemption finding or a statutory tax rate.

Step-by-step use and editing

  1. Align the space measurements: start with the confirmed rectangle length, then enter width, end and side reserves, cross aisles, rack dimensions and dedicated aisle allowances in mm.
  2. Describe the configuration: record bays in every continuous row, pallets at each beam level, confirmed floor positions and the target position count.
  3. Match BOM units: use pieces for frames and accessories, pairs for beams, and supplier-confirmed accessory coefficients, pack sizes and MOQs.
  4. Enter the actual quotation: add unit prices, quoted quantities and separately charged costs, then review missing values, purchasing surplus, quantity differences and whether the final total is pending.
  5. Reconcile before ordering: save the TXT report or print the dimensions, part quantities and checklist for review with the supplier and site team.

Load the fictional example to see how the quantities connect.
Closing the example restores the values you were editing, so keep example prices separate from your real quotation.
After changing a dimension or configuration, send a fresh report rather than an older saved result.
Collapsed input groups still contribute to the calculation; revisit the complete configuration after changing rows or levels.

Three purchasing situations

Extending an existing rack

Confirm shared-frame connections and compatibility with the supplier first.
The calculator counts the complete configuration, so reconcile reusable existing frames and beams against the additional purchase in a separate stocktake.
It does not inspect used parts or approve their reuse.

Splitting the same bays into more rows

Even when total bays remain unchanged, more independent rows mean more start/end frames and row-based guards.
This model also reserves a dedicated aisle for every row, so review the changed width as well as the changed part quantities.

Reconciling a supplier’s quantities

A quote for 50 anchors against a raw requirement of 40 may be correct if anchors are supplied in packs of 25.
Apply pack and MOQ terms before raising a discrepancy, then ask about spares, extra scope, delivery, installation and tax inclusions.

Pre-order checks and limits

  • Match the measured zone and drawing reference lines, including doors, columns and restricted areas.
  • Confirm model-specific loads, level spacing, pallet dimensions, clear height and frame/beam compatibility with the supplier.
  • Have the responsible professional review the floor, anchors, guards, seismic requirements and installation scope.
  • Check the forklift’s turning, lift and mast conditions, dedicated and cross aisles, escape routes and fire requirements with the site team.
  • Match accessory inclusions, packs, MOQ, lead time, delivery, unloading, installation and actual tax to the written quotation.

A checked item records the user’s confirmation; it is not an inspection performed by the calculator.
Positive dimensional remainders cannot resolve nearby machinery, protruding loads, traffic conflicts or emergency access restrictions.
A particular manufacturer’s minimum level count or load rating is not generalized to other rack models.
Software input limits are also not safety limits.

Frequently asked questions

Why do two four-bay rows need ten frames?

Each continuous row needs 4 + 1 = 5 frames.
The two rows have separate starts and ends, giving ten in total.
Sixteen frames would describe eight standalone bays instead.

Are 24 beam pairs the same as 24 individual beams?

No: a pair contains two individual beams in this model, so 24 pairs mean 48 beams.
Convert a quotation per individual beam into a price per pair before entering the beam price.

Do floor positions require another beam level?

Floor positions add to nominal pallet positions without increasing beam pairs.
Their suitability still needs confirmation on the actual drawing.
Enter zero floor pallets per bay when the confirmed configuration does not use floor storage.

Does the calculator recommend an aisle width?

No universal safe aisle width is filled in because forklift models, loads, operating plans and escape requirements differ.
Use confirmed dedicated and cross-aisle measurements.
Each row consumes its own front aisle in this model.

Can back-to-back racks share one frame?

Sharing a frame between adjacent bays is different from connecting separate frames back-to-back.
A rear connector can join two frames, so do not remove a frame merely because the racks are connected behind each other.
Back-to-back and opposing-row aisle sharing need a separate supplier layout outside this model.

Why is the purchase quantity higher than the requirement?

Pack sizes and MOQ can round the order up.
A requirement for 40 pieces with packs of 25 becomes 50, and that order quantity is the quotation comparison basis.
A confirmed zero requirement produces a zero order in this calculator even if an MOQ exists.

Can I replace unknown values with zero?

Use zero for confirmed unnecessary quantities or free charges, not for values you have not checked.
Leave unknown coefficients and prices blank to preserve the supplier follow-up list.
A confirmed subtotal may be available while the final total remains pending.

Can I order installation from this result alone?

Send the quantity schedule, dimensions, pending items and checklist to the supplier first.
Have the actual site, loads, height, floor, anchors, aisles and fire conditions confirmed.
Neither the arithmetic result nor a checked box replaces a safety approval or installation suitability review.

Primary sources and maintenance

Prepared and source-checked on 2026-11-25.
These manufacturer sources support the connection and dimension distinctions; they are not adopted as Korean statutory standards or universal rack specifications.
The repeated-frame outside-length formula is a geometric inference for the matching connection design.
The actual supplier drawing and contract BOM take priority.

Reconfirm model dimensions, levels, loads, included accessories, coefficients, packs, MOQ, prices and actual tax for every order.
Update saved schedules when the product or contract changes, and review source links periodically.

Reconcile the quantity schedule with the actual drawing

Start with the confirmed zone length and check that frames and beam pairs match the supplier’s quotation units.
Save the BOM, dimensional remainders, unknown items and checklist, then confirm the site and specifications with the supplier before finalizing the purchase quantities and price.