Sump Pump Replacement & Temporary Drainage Quote Calculator

Compare confirmed pump replacement quotes, missing services and additional cash needed in KRW.

1. Confirmed replacement scope

Use equipment already confirmed suitable by the contractor. Leave unknowns blank; enter zero only when confirmed.

2. Services & temporary drainage

3. Actual quotes (up to four)

Included items are already covered by the package. Only separate items add their unit prices.

Replacement pump (per pump) · Unknown

4. Optional assumptions

Downtime loss is your assumption, separate from the contractor bill. Sensitivity changes separate rental charges only; tax, package and other amounts stay fixed.

Check the whole sump-pump replacement quotation

This calculator compares actual quotations for pumps whose specifications have already been confirmed by a professional.
It separates pump equipment, lifting, piping, electrical work, temporary-drainage setup and rental, commissioning, and removal/disposal.
Apply one common replacement scope to up to four providers, then identify what each package includes and which charges remain separate.

Use it before a building manager approves replacement work or a small operator books an appointment.
The useful decision is whether the quoted amount covers the same required work, rather than whether a low pump price looks attractive.
Known charges remain visible while unanswered items stay pending.
This is a Korea-based 2026 quotation worksheet using Korean won (KRW); sources were checked on 2026-11-24.

Have the inspection record and written quotes ready

Confirm the replacement count, models, power supply, connections, required site work and planned work date with the provider.
For a different flow/head comparison task, review the scope of the water-pump flow/head curve calculator separately.
Entering a price here does not diagnose a fault, select pump capacity or establish installation suitability.

Use the same count and confirmed specifications

Pumps actually being replaced

Enter an integer from 1–100 for this job.
The number of sumps, all installed pumps and spare pumps purchased for stock may differ from the replacement count.
If two pumps are being replaced while a standby unit remains, enter two for the agreed job.
A separately quoted pump unit price is multiplied by this count.

Models, power and connections

Record the professionally confirmed model and relevant specifications.
Similar names do not establish matching electrical supply, connections or accessories.
The matching-scope confirmation means that actual equipment, quantities and work have been reconciled across providers.
A price without this confirmation cannot become a completed comparison.

The site provider must determine whether like-for-like replacement is possible and whether piping or controls need modification.
Do not mark work as excluded merely because its cost is unknown.
Leave unresolved conditions unknown and include the questions in your request for a revised quote.

Separate lifting, connections, testing and disposal

Classify lifting, piping, electrical work, temporary drainage, commissioning and removal/disposal as required, professionally confirmed exclusion or unknown.
For required work, each provider then needs a confirmed package-included or separately priced charge.
This is a quotation checklist, rather than a declaration that every task is mandatory at every site.

  • Lifting: reconcile the agreed handling and removal scope for existing and replacement equipment.
    Actual access and equipment conditions affect the provider’s work and price.
  • Piping and electrical work: distinguish pipes, hoses, valves and connections from cables, supply and controls.
    Confirm both materials and labour within each package.
  • Commissioning: agree the completion checks and who receives the results.
    Selecting included commissioning does not certify test results or safety.
  • Removal/disposal: reconcile old-equipment removal and site finishing.
    For extra work outside the listed items, obtain a clearly scoped package without double-counting the same work.

Each required site task is one job, while pump equipment uses the actual pump count.
If a provider quotes lifting per pump, first convert its price to the agreed total lifting charge for this site job.
Comparing different price units can make an apparently equal number describe a different quantity of work.

Separate temporary-drainage setup from billed rental days

Use the contract’s confirmed billing units

When temporary drainage is required, enter setup/removal as one job and rental as confirmed billed days.
The supported rental range is an integer from 0–365 days.
Reconcile minimum hire periods, delivery/collection days and rounding of hourly work with the provider before entering the billed count.
The planned work date does not automatically determine rental days or a minimum period.

A short job can have a different equipment billing period, or rental can be included in a package.
These are contract facts to confirm; the calculator does not recommend a universal minimum rental period.
Confirmed free setup can be entered as a separate zero or package inclusion.
A professionally confirmed exclusion records scope, while the suitability of an alternative drainage arrangement remains a separate assessment.

Confirmed zero rental days can produce zero rental cost without a separate daily rate.
A blank day count remains unknown and prevents completion of the quote.
If weather or scheduling changes the job, ask for updated billing days and installation/collection terms.

Avoid adding package-included work twice

Start with each provider’s package base price.
An itemized quotation without a base package needs a confirmed zero; a blank base is still unanswered.
Money fields use integer KRW amounts from 0–100,000,000.
Classify each required item as unknown, included in the package or separate.

Package included

The base price already covers the item, so its added charge is zero.
A previously entered separate rate does not get added again while the item is included.
However, inclusion status alone cannot establish a total when the package price itself is unknown.

Separately charged

Pumps use count × price per pump; rental uses billed days × daily rate.
Other required tasks add a one-job site charge.
When a separate price is unanswered, keep the known charges as a subtotal and defer the complete comparison.

Select tax included, separate or unknown.
For separate tax, enter the actual quoted tax amount; included tax is neither reverse-calculated nor added again.
The calculator applies no automatic statutory tax rate.
Confirm the transaction’s tax treatment and actual amount with the contracting parties, and do not reuse the example tax amount as a default.

Understand total price, remaining cash and interruption loss

Quoted total

Package base + sum of separate quantity × unit price + actual separate tax amount

Required quantities, work, amounts, matching specifications/scope, dates and tax must be confirmed.
Prepaid money does not reduce the contract price as though it were a discount.

Additional cash to prepare

Quoted total − prepaid amount

This is the remaining cash after money already paid for this quote.
Unknown prepayment holds this cash figure while a fully confirmed quote total can still be displayed and compared.
If prepayment exceeds the quoted total, the cash figure stays pending for an overpayment or scope check instead of becoming a confirmed negative requirement.

Budget including interruption loss

Quoted total + interruption hours × user-assumed loss per hour

Hours may be decimal values from 0–8,760.
Use your own expected loss rather than automatically treating gross revenue or rent as lost money.
Confirmed zero hours gives zero loss without an hourly amount.
Unknown interruption loss holds this budget only and does not block comparison of complete contractor quote totals.

The loss-inclusive budget is an operating assumption, distinct from the provider’s bill and additional cash requirement.
Do not enter the same loss twice if it is already part of a package.
Compare total with total and remaining cash with remaining cash to avoid mistaking different prepayments for different contractor prices.

Worked example: two pumps and two billed rental days

These fictional quotations demonstrate arithmetic, rather than market prices or a recommended budget.
Assume two professionally confirmed pumps, all tasks required, matching scope, planned work on 2026-12-01 and quote validity through 2026-12-31.
Rental is two billed days.
Interruption loss is 4 hours × 50,000 KRW = 200,000 KRW.

Fictional KRW comparison of two-pump replacement quotations A and B
ItemProvider A (KRW)Provider B (KRW)
Package base01,950,000
2 pumps × 500,0001,000,000Package included
Lifting / piping / electrical250,000 / 200,000 / 100,000Package included
Temporary-drainage setup/removal100,000Package included
2 rental days (A 80,000 / B 70,000 daily)160,000140,000
Commissioning / disposalIncluded / 50,000Both included
Subtotal / tax1,860,000 / separate 186,0002,090,000 / included
Quoted total2,046,0002,090,000
Prepaid / additional cash300,000 / 1,746,0000 / 2,090,000
Budget including interruption loss2,246,0002,290,000

The confirmed quote difference is 44,000 KRW, with A lower in this entered example.
A’s 300,000 prepayment makes the remaining-cash difference look larger, but the contractor-price difference remains 44,000.
Before acting on the price comparison, recheck models, lifting scope, temporary-drainage responsibility and commissioning handover.

Rental-day sensitivity is a user assumption

Choose a whole-day change from 0–365 days to shorten or extend billed rental days.
The reduced count has a floor of zero days.
Only a separately charged daily rental price changes: the package, other work and quoted tax amount remain fixed.
If an actual extension changes tax or other charges, enter a revised quotation instead of treating this sensitivity as a confirmed bill.

The example at ±1 rental day

A subtracts or adds its daily 80,000 KRW to 2,046,000, giving 1,966,000–2,126,000 KRW.
B subtracts or adds 70,000 to 2,090,000, giving 2,020,000–2,160,000 KRW.
A quote with package-included rental has no separately priced rental change under this assumption.
These amounts are neither market low/high prices nor guaranteed extension-price limits.

Minimum rental periods and billing thresholds can make a real extension differ from a simple daily-price change.
The worksheet uses the billed days and daily rate already confirmed by you.
Confirm availability, repeat callouts and changed-equipment charges with the provider, then update the actual figures.

Read unknown values and validity before ranking prices

Confirmed zero means a definite answer that no extra amount is charged; blank or unknown means an unanswered question.
A known subtotal shows progress and is neither a maximum bill nor proof that remaining work is free.
Unknown required scope, quantities, prices, matching specifications, tax or dates keep the quoted total pending.
If any provider’s total is incomplete, the overall cheapest-total comparison and spread remain pending.

Work date versus quote validity

The planned work date must be on or before the quote’s valid-until date; the same date is accepted.
Ask for renewed pricing if work moves beyond that date.
The model compares your planned work date with the contract’s validity date, rather than expiring a quote according to the current clock.
Read missing-date and expired-quote reasons before treating a price as confirmed.

When every quoted total is complete, the same measure can be compared; equal totals share the lowest price.
Unknown prepayment or interruption loss can hold the corresponding cash or loss-inclusive budget without erasing the confirmed contract total.
This distinction lets you continue the contractor-price decision while gathering separate cash-flow information.

Move from the inspection record to a revised quotation

  1. Enter professionally confirmed pump count, model, power and connections.
    Identify required and excluded tasks, leaving unresolved questions unknown.
  2. Confirm billed rental days when temporary drainage is needed, and enter the planned work date.
    For operating impact, separately enter interruption hours and your assumed hourly loss.
  3. Reconcile each package, inclusion status, separate rate, validity date and tax amount.
    Switch providers against the same common conditions; their entered quotations are retained.
  4. Read known subtotals and pending reasons, then ask the provider for missing details.
    After confirming the total, use prepayments to calculate remaining cash.
  5. Save the result and omission checklist as TXT or print them for a revised-quote request.
    Once equivalent quotations are available, confirm site responsibilities and arrange the appointment directly.

Check the fictional-example indicator when loading the worked case.
Closing the example restores the working inputs and selected provider so actual quotation work can continue.
The site checklist is your own record, rather than technical approval or a safety certificate.
TXT saving and printing organize the result locally; they do not transmit it to a provider or book work.

Frequently asked questions

Can I start with only the pump price?

Yes.
Enter confirmed equipment prices to see a partial subtotal.
The complete total stays pending until required lifting, piping, electrical, temporary-drainage and other scope questions are resolved.

Should I add a reference price for an included item?

Package-included items add zero because the base price already covers them.
Reconcile a reference unit price with the provider’s actual extra charge before changing the item to separate.

Are rental days the same as work days?

Not necessarily.
Delivery, collection, minimum periods and rounding are contract terms.
Enter confirmed billed rental days; the calculator does not infer them from the job date.

Does unknown prepayment block total-price comparison?

No.
A fully confirmed quotation can still be compared.
Unknown prepayment holds additional cash only; a prepayment above the total needs an overpayment or scope check.

Does a blank interruption loss prevent a lowest quote?

No.
Interruption loss is a separate operating assumption.
It holds the loss-inclusive budget, while completed contractor totals remain comparable.

Can I reuse the example tax amount and rental rate?

The example values are fictional arithmetic inputs.
Confirm actual tax inclusion, tax amount, daily price and minimum billing conditions in your own written quote.

Should I immediately book the lowest-priced provider?

The result compares entered amounts for confirmed equivalent scope.
Review site suitability, warranty, drainage responsibility, handover and change conditions before arranging work directly.

Does this tell me whether to enter a sump myself?

No.
It provides no entry, electrical or lifting instructions.
Professional review is needed for applicable site safety requirements, including worker confined-space work where relevant; the tool does not classify every sump as a confined space.

Sources and the 2026 verification boundary

Sources were checked on 2026-11-24.
Manufacturer documents support questions about separate tasks, rather than Korean market prices or universal installation requirements.

  • Grundfos SOLOLIFT2 brochure, document 98657020/0414: a small wastewater lifting-unit brochure supporting distinctions around connections, non-return valves and maintenance access.
    It does not validate large-sump lifting or temporary-drainage costs.
  • Grundfos SEG installation and operating instructions, document 98449102 0416 for specified 0.9–4.0 kW/60 Hz models: supports separating installation, lifting, piping/cabling, commissioning and maintenance.
    This older model-specific document does not replace the current manual for your equipment.
  • Korean Rules on Occupational Safety and Health Standards, Article 92 and Article 619, law ID007363/MST273603: the OPEN API detail confirms these provisions effective 2025-09-01.
    They provide safety context on stopping/restart prevention and programmes where workers undertake confined-space work.
    The search result’s 2026-03-02 date concerns a separately effective part of Article 241.

The worksheet does not determine confined-space classification, staffing, safety measures, capacity, statutory prices or tax rates.
Reconfirm actual models, work, discharge route, temporary-drainage responsibility, handover, current manuals and applicable rules with the professional for each contract.

Request an equivalent-scope revised quote

A single record of equipment, lifting, connections, temporary drainage, commissioning and disposal makes the remaining questions specific.
Save the results and omission list, then request a revised quotation covering tax, prepayments and validity.
For the separate long-term decision about recurring leaks and waterproofing methods, review the basement waterproofing lifecycle-cost calculator.

Related calculators