Korea Fire Restoration Stage Cash & Insurance Receipt Budget Calculator

Plan actual tax-inclusive restoration quotes, prior and staged payments, and verified insurance receipt dates to find peak additional cash and the first reserve shortfall.

Start with unknown amounts blank. Enter actual tax-inclusive KRW quotes and net receipt amounts/dates verified with the insurer. Include insurance already received only in current cash.

1. Cash snapshot and stage scope

Included stages are not added again. Unknown differs from a verified zero. Changing a stage status clears its amounts and payment rows.

Emergency measures
Demolition and disposal
Soot cleaning
Deodorizing
Drying
Rebuilding
Temporary accommodation
Other costs

2. Future payments and insurance receipts

Split remaining quotes into deposit, progress and final payments. Past-due unpaid bills are placed on the snapshot date. Enter final insurance receipts net of any advance already received.

3. Cash budget for the known schedule

Partial budget. Resolve unknown stages and unallocated payments to review the whole budget. Hold any start-of-work decision until safety is confirmed.

Known works and housing subtotal
0 KRW
Already paid
0 KRW
Remaining cost
0 KRW
★ Peak additional cash
0 KRW
First reserve shortfall
None
Final cash balance
0 KRW
  • Unknown stages: 8 · Unallocated payments: 0 KRW
  • Verified insurance receipts: 0 KRW · Receipts missing amount or date: 0
  • Remaining cost less verified receipts (including unallocated cost): 0 KRW
  • Past-due payment rows moved to the snapshot date: 0

Verified-receipt delay scenario (30 days)

0 KRW

Increase from base: 0 KRW

Reference including unverified receipts

0 KRW

Only unverified receipts with an amount and date are included. Do not treat them as secured start-of-work funding.

Same-day payments occur before receipts. The peak gap preserves your reserve; daily gaps are not added together. Unallocated costs and unknown stages are absent from the ledger below.

Daily cash ledger using verified receipts, all amounts in KRW
DatePaymentsVerified receiptsAfter paymentsClosing cash

No payment or receipt schedule has been entered.

Related calculators

A restoration estimate and the cash needed today answer different questions

After a fire, emergency measures, demolition, soot removal, deodorizing, drying and rebuilding can produce payments on different dates.
An insurer may reimburse part of the loss, yet the contractor may require a deposit or progress payment before the insurance money arrives.
This calculator connects the actual trade estimates with amounts already paid, future payment dates and the net insurance receipts confirmed by the insurer.
It is intended for owners, tenants, adult children helping their families, and small shop or building operators preparing a Korean restoration budget.
All monetary amounts are in KRW, and the legal context is Korea in 2026.

Use the result to prepare the next conversation

Identify the first shortfall date, the largest additional cash requirement and any missing trade or payment schedule.
Save the ledger and ask the contractor to confirm or revise payment dates; ask the insurer to confirm recognized scope, net receipts and expected dates.
A sufficient cash balance does not establish structural safety, workmanship or approval of an insurance claim.

Confirm safety and preserve evidence first

Do not enter a damaged building or inspect electrical, gas or structural systems merely to complete this budget.
Follow the access and work restrictions communicated by the relevant authorities and qualified professionals.
The safety checkbox records a confirmation you have obtained; the calculator does not inspect the site.
Without that confirmation, the arithmetic can be used for preliminary planning, while a decision to start work remains on hold.

  1. Keep photographs, a damaged-property inventory and the incident notification records where it is safe to do so.
    Before demolition or disposal, ask the insurer what investigation and evidence preservation are required.
  2. Separate emergency loss-prevention measures from ordinary restoration work.
    Record what was done, when it was done and the receipts, then verify which expenses can be recognized.
  3. Obtain itemized estimates and the final tax-inclusive cash amounts from the contractor.
    Ask the insurer about the net payment after applicable deductions, any advance payment and the expected receipt dates.

Review the scope of all eight restoration categories

Emergency measures, demolition and soot removal

Emergency measures record work actually commissioned to prevent the damage from becoming worse.
For demolition and waste removal, check whether dismantling, loading, transport and disposal are included.
Record soot removal according to the cleaning and contamination-removal scope described in the estimate.
If a broad fire-cleaning package includes several tasks, establish those inclusion relationships before adding amounts.

Deodorizing, drying, rebuilding, temporary housing and other costs

Check whether deodorizing and drying are part of the cleaning package or separately charged work.
Rebuilding uses the final cash amount of the work actually contracted, while temporary housing records the confirmed accommodation expenditure.
Use the other-cost category for verified items outside these groups and retain enough detail to avoid overlap.
These categories do not recommend a restoration method or establish a safe construction sequence.

Choose a separate quote, included in another trade, unknown, or confirmed unnecessary for each category.
An included item points directly to one separately quoted trade and contributes no additional amount.
It cannot point to itself or to another included item, preventing chains in which the underlying priced scope becomes unclear.
Do not turn an unresolved category into zero cost or unnecessary merely to complete the total.

Understand the snapshot, reserve and amounts already paid

  • As-of date and current cash: Enter the actual balance after payments made and insurance money received up to that snapshot.
    Adding an insurance receipt already included in current cash again as a future inflow would overstate available funding.
  • Protected cash reserve: This is the minimum balance you intend to retain for living or operating expenses.
    It is a balance floor rather than an extra restoration charge, and additional cash is required when the ledger falls below it.
  • Quoted amount: Use the final tax-inclusive cash amount payable in KRW.
    For a tax-exclusive estimate, confirm the final payment with the supplier first; the calculator does not apply a VAT rate, input-tax deduction or refund automatically.
  • Already paid: Record money paid toward that specific quoted trade before the snapshot.
    It remains part of the project subtotal but is excluded from future payments and cannot exceed the quoted amount.
  • Unknown versus confirmed zero: A blank amount means the amount has not been established.
    Zero means no separate payment has actually been confirmed; an unknown category is omitted from the known subtotal and therefore prevents that subtotal from representing the complete budget.

Amounts must be whole KRW from zero to KRW 1 trillion, and dates must be valid calendar dates from 2000 through 2100.
Keep the as-of date, payment dates and receipt dates on the same date basis.
The initial form is an empty ledger; amounts appear only when you explicitly load the fictional example.
Those example amounts and dates are neither market averages nor recommended prices or standard contract terms.

Split deposits, progress payments and final balances into payment rows

The trade estimate describes the total commitment, while a payment row describes when cash leaves your account.
If rebuilding has a deposit and a final installment, add two rows linked to the same rebuilding quote.
Each payment needs a trade, a descriptive label, an amount and a date, with up to 40 payment rows supported.
The payments allocated to a trade cannot exceed its quote less the amount already paid.

Unallocated money is still missing from the timeline

If KRW 10,000,000 remains under a quote but only KRW 5,000,000 has a payment date, the other KRW 5,000,000 remains unallocated.
The calculator does not silently move that amount to the last day, so the displayed cash peak covers only the schedule entered.
An unpaid row dated before the snapshot is treated as immediately payable on the as-of date and marked for overdue-payment review.
If it has already been paid, update the already-paid amount and current cash instead of leaving it in the future ledger.

Separate confirmed net insurance receipts from assumptions

The sum insured, the contractor estimate and the insurance benefit payable are different amounts.
The base ledger includes only insurer-confirmed net receipt amounts with expected dates.
If an advance is entered as a separate receipt, the final receipt must contain only the remaining benefit after subtracting that advance.
Confirm the net cash amount after any applicable deductible or coordination between insurers instead of calculating those adjustments here.
Up to 20 receipt rows can be entered; money received before the as-of date belongs in current cash.

Base result using confirmed receipts

A row marked insurer-confirmed needs both an amount and a date on or after the as-of date.
An expected date records the information currently obtained and does not guarantee final settlement.
If the insurance total exceeds the known quote subtotal, check whether other insured losses are included or the same payment has been entered twice.

Unconfirmed and delayed scenarios

An unconfirmed receipt is added only to the separate reference scenario when both its amount and date are supplied.
If either is missing, it remains an unresolved receipt rather than creating cash.
The delay comparison shifts confirmed receipts by your chosen 0–365 calendar days.
It does not estimate a legal deadline or the probability of delay, and it does not move dates around public holidays.

How peak additional cash and the first shortfall date are calculated

Connect quotes to the scheduled payments

Known restoration and housing subtotal = sum of separately quoted trades
Remaining commitment = known subtotal − already paid
Unallocated payments = remaining commitment − scheduled payments

Included items are not added again, and unknown categories are not established as zero-cost work.
Any unresolved trade or unallocated amount means the result is a partial budget based on the known schedule.

Payments come before receipts on the same date

After-payment balance = previous balance − daily payments
Closing balance = after-payment balance + daily receipts
Peak additional cash = max(0, protected reserve − minimum balance)

The minimum includes starting cash and each date’s after-payment and closing balances.
For a payment and receipt on the same day, the calculation conservatively processes the payment first.
The first shortfall is the first date the balance falls below the protected reserve, or the as-of date if the starting balance is already insufficient.
This ordering is a planning convention when transaction times are unknown, rather than a claim about the actual bank processing order.

Peak additional cash is not the sum of every daily deficit.
It is the largest single funding top-up needed to keep the lowest point at the reserve floor.
The calculator does not insert that hypothetical top-up as a receipt, leaving the original ledger visible.
Remaining payments less confirmed receipts is the final net cash requirement; it is neither the economic loss from the fire nor a determination of the insurance benefit.

Worked example: a KRW 21,000,000 project and KRW 11,000,000 cash peak

Assume an as-of date of 2026-11-18, current cash of KRW 5,000,000 and a protected reserve of KRW 1,000,000.
The quotes are emergency measures KRW 2,000,000, of which KRW 1,000,000 has already been paid; demolition KRW 3,000,000; soot removal KRW 4,000,000; rebuilding KRW 10,000,000; and temporary housing KRW 2,000,000.
Deodorizing and drying are included in the soot-removal quote, and other work is confirmed unnecessary in this fictional case.
The known subtotal is KRW 21,000,000, already paid is KRW 1,000,000, and the remaining commitment is KRW 20,000,000.
These values explain the arithmetic and are not a restoration price list.

Fictional dated restoration payments, confirmed insurance receipts and closing balances before additional funding, all amounts in KRW
DatePaymentConfirmed receiptClosing balance
2026-11-181,000,00004,000,000
2026-11-203,000,00001,000,000
2026-11-212,000,0000−1,000,000
2026-11-2405,000,0004,000,000
2026-11-254,000,00000
2026-12-015,000,0000−5,000,000
2026-12-105,000,0000−10,000,000
2026-12-15010,000,0000

Although confirmed receipts total KRW 15,000,000, the balance reaches −KRW 10,000,000 on December 10.
Protecting the KRW 1,000,000 reserve requires peak additional cash of KRW 11,000,000, and the first shortfall date is 2026-11-21.
The final balance on December 15 is zero, while remaining payments less confirmed receipts equal KRW 5,000,000.
If all confirmed receipts arrive 30 days later, the cash peak becomes KRW 16,000,000, an increase of KRW 5,000,000.
A separate reference case that also receives an unconfirmed KRW 2,000,000 on November 19 has a KRW 9,000,000 peak, but that assumed receipt must not be treated as secured funding.

Enter actual documents in this order

  1. Set the current cash snapshot and the living or operating reserve you need to retain.
    Check that receipts already collected and costs already paid are reflected in that balance.
  2. Review the status, tax-inclusive estimate and already-paid amount for all eight categories.
    Confirm whether easily hidden items such as deodorizing, drying and waste disposal are included or separately charged.
  3. Place deposits, progress installments, final balances and temporary-housing payments on their actual dates.
    Reconcile each remaining quote to the scheduled payments and resolve unallocated amounts.
  4. Enter confirmed advances and final remaining insurance receipts separately, leaving amounts still under discussion unconfirmed.
    Do not label an invented date as confirmed merely because the expected schedule is unknown.
  5. Review the cash to arrange before the first shortfall and the larger requirement if receipts are delayed.
    Save the TXT ledger or print it, then request revised payment dates and written receipt confirmations.

Families sharing restoration costs can use the peak and its date to explain when financial help is needed.
A shop operator should define a consistent boundary before mixing business restoration with personal accommodation expenditure.
When a variation or newly discovered contamination changes a quote, update both the trade amount and its installment schedule.
The calculated shortfall does not establish borrowing approval or repayment capacity; verify financing terms separately.

Korean insurance law in 2026 and the limits of this calculation

The current Commercial Act was checked through the National Law Information OPEN API on November 18, 2026.
The record is law ID 001702, MST273629, promulgated September 9, 2025 and effective September 10, 2026.
Article 657 concerns notification of the insured event; Article 658 concerns payment timing; Article 680 concerns mitigation and necessary, useful expenses; and Articles 683 and 684 provide the context for fire damage and losses from firefighting or loss-reduction measures.
These provisions do not by themselves establish the recognized amount or payment date for an individual restoration trade.

Do not calculate a receipt date as ten days after the fire

Under Article 658, an agreed payment period applies; without one, the insurer determines the amount without delay after notification and pays within ten days of that determination.
The ten-day reference does not run automatically from the fire date or the date the claim was submitted.
Samsung Fire’s October 20, 2026 guide describes a seven-day payment period after determination and a 50% advance for a particular product, but neither is used here as a universal insurance constant.
Use the actual contract and the net amount and date confirmed by your insurer.

This calculator does not assess coverage liability, recognized losses, deductibles, allocation between multiple insurers or eligibility for an advance.
A legal basis for necessary mitigation expenses does not make every demolition, cleaning or rebuilding charge automatically reimbursable.
Site safety, technical suitability, contractor qualifications and workmanship require their own review.
Even a complete cost scope does not justify starting work while safety confirmation is missing or the ledger still contains a fictional example.

Frequently asked questions

Can I enter the sum insured as an expected receipt?

The sum insured is not necessarily the amount payable.
Use the net receipt after recognized scope, applicable deductions and other-insurer adjustments have been checked, leaving unresolved money outside the base ledger.

What if deodorizing is included in the cleaning quote?

Mark deodorizing as included in another trade and point it to the separately quoted soot-removal category.
Do not add the same charge again as a separate quote or payment row.

Will an installment already paid be deducted twice?

It stays in the full quote but is removed from the amount available for future payment allocation.
Current cash must also be the balance after that payment, and the installment must not appear again in the future ledger.

Can insurance money received that day fund a payment immediately?

That may be possible in practice, but the receipt time and the contractor’s payment deadline may be unknown.
The ledger processes same-day payments first, so confirm the real transaction sequence with the insurer and contractor.

Should I enter zero for an unknown trade to finish the budget?

A blank amount and confirmed zero mean different things.
Leave an unresolved trade unknown and use the known subtotal and missing-item list; choose zero or unnecessary only after it has actually been established.

How should I record an advance and the final insurance benefit?

Use separate net receipt rows on their actual expected dates.
The final row contains only the balance after subtracting the advance; an advance already collected before the snapshot belongs only in current cash.

Why is additional cash needed when the final balance is positive?

Contractor payments can occur before insurance receipts, pushing the intermediate balance below zero or below your protected reserve.
Review the dated cash peak as well as the ending balance.

Does the delay setting represent a statutory payment deadline?

No.
The 0–365-day setting is your calendar-day assumption and does not decide whether a delay is lawful or whether the insurer must pay.
Check the contract and the actual determination and payment procedure.

Official sources and what to verify again

Sources were checked on November 18, 2026.
For each claim, verify the policy and rider version, recognized trade scope, tax-inclusive estimates, allocation of money already paid or received, net receipt amounts and expected dates.
If a contract or schedule changes, the newly confirmed ledger and documents take precedence over a saved calculation.

Prepare a trade schedule and a receipt confirmation list

Keep the estimates, paid receipts and insurer confirmations beside you while entering the ledger.
Resolve missing and overlapping scope before reviewing funding arrangements and payment-date changes ahead of the first shortfall.
For the insured value and proportional coverage itself, use the home fire and personal liability insurance calculator alongside this page.
This tool focuses on actual restoration payments and receipt timing, which is a different decision from assessing coverage.