Drain Camera Inspection Quote Comparison
Compare no-entry, partial and complete inspection charges, deliverables and balances in KRW.
Actual tax-inclusive quotes · KRW
Which section needs inspection?
Related calculators
- Korea Drain Clearing & Pipe Replacement Cost CalculatorCompare three-year mechanical clearing and hydro jetting budgets with partial and full pipe replacement quotes, including VAT, restoration, contingency and confirmed recoveries.
- Pipe Cleaning Scope and Billing Quote ComparisonCompare two actual pipe cleaning quotes for the same water outlets, heating circuits or drain length.
- Korea Sewer Pipe Trenchless Repair vs Excavation Lifecycle Cost CalculatorCompare like-for-like trenchless lining and excavation-replacement quotes across restoration, downtime, maintenance, warranty-adjusted renewal, and 10-year present value in KRW.
- Korea Water Leak Detection & Source Repair Estimate CalculatorCombine itemised Korean detection, source repair, drying, finish, and lower-unit restoration quotes, then apply confirmed VAT terms, contingency, and recoveries.
- Water Leak Damage CalculatorWater Leak Damage Calculator helps estimate Korea-related construction defect, water leak, sunlight, jeonse fraud, lease, key money, land compensation, and eviction dispute assumptions in English.
Compare drain-camera quotes by the inspection outcome
A headline call-out price does not tell you what happens when the camera cannot enter a drain, stops partway, or completes the agreed inspection.
Branches, opening and reinstatement, video handover and a written report can also have separate conditions.
This worksheet helps households, shop operators and building managers compare two written quotes before buying a standalone inspection or arranging repairs.
Read the no-entry, partial-inspection and completed-inspection charges separately, alongside missing length, uninspected branches, required recordings and the balance after an advance.
Unanswered fields remain unresolved rather than being treated as free services.
This is a Korea-related 2026 quote worksheet using actual tax-inclusive Korean won (KRW); it does not supply a market price, statutory tax rate or probability of successful entry.
The next action is a written clarification
Confirm access, endpoints, branches, the definition of completion, no-entry charges and recording delivery before booking.
Save the comparison and open questions to share with the provider or the person arranging the work.
A small partial subtotal does not establish that the entire inspection is included.
Start with the access point and the inspection endpoints
Describe where the camera is expected to enter and where inspection should end.
A kitchen drain to an outdoor access chamber and a bathroom branch to a shared vertical stack are different scopes, even within the same building.
Provide the endpoint description and photographs rather than relying on a broad phrase such as the whole property.
The provider must confirm how length and branches are measured for this actual route.
Target length and branch count
The target length is the required inspection length in metres.
The branch count is the number of offshoots that you need inspected separately.
A confirmed absence of branches is zero; an unknown count remains blank.
If branch lengths are already part of the stated length, clarify how the metre-based and branch-based charges interact so that the same work is not charged twice.
Diameter and equipment access
Record the provider’s information about pipe diameter, bends, accessible openings and equipment entry.
The calculator does not select a camera from the diameter or determine whether it can enter safely.
The scope-confirmation checkbox records your own contract check and is not a technical approval.
Enter one common partial-inspection length and branch count for both providers.
For example, to compare stopping at eight metres on a twenty-metre job, both quotes use that same eight-metre outcome.
Partial quantities cannot exceed the corresponding targets.
If the stopping point changes, revise the common scenario and ask both providers to reconfirm it.
No entry, partial inspection and completion are alternatives
No entry
This outcome uses zero metres and zero branches.
Enter the agreed fixed visit and inspection charge for this outcome, including an explicitly confirmed zero if applicable.
Required video and report delivery do not gate the no-entry price comparison because no inspection was completed.
Partial inspection
This outcome uses the common partial length and branch count.
Agree on the stopping point and what counts as a partial inspection.
The charge may be a fixed amount or a base plus measured extras; read the remaining target shortfall as well as the price.
Completed inspection
This outcome uses each provider’s quoted completion length and branch count.
A quote labelled complete still fails the scope comparison if it does not cover your target quantities.
Confirm the definition of completion and the handover of required recordings in writing.
Do not add the three outcome totals together as the cost of one inspection.
If a later visit credits an earlier payment, obtain the net charge under each outcome before entering it here.
A package combining inspection, cleaning and repairs needs a clear allocation and approval conditions; those other services are not automatically included by this worksheet.
Fixed fees and metre-and-branch billing
A fixed fee uses the agreed visit and inspection amount for that outcome without adding a distance or branch charge.
Previously entered metered values are not used while fixed billing is selected.
For metered billing, the included quantity is what the base already covers, not the full quoted quantity.
Do not enter the call-out charge twice when it is already part of the base.
Metered calculation
- Extra length = max(0, scenario length − included length)
- Extra branches = max(0, scenario branch count − included branch count)
- Base charge = base amount + rounded KRW(extra length × per-metre rate) + extra branches × per-branch rate
- Length shortfall = max(0, target length − scenario length)
No excess quantity means that the corresponding extra-unit rate is not applied.
Unused included quantities do not create a discount or refund.
Lengths use up to two decimal places and the distance charge rounds half up to whole won: 0.29m multiplied by 50 KRW per metre becomes 15 KRW.
Use the actual final tax-inclusive KRW amounts from the provider.
If the quote lists only a pre-tax supply amount, obtain the payable amount first.
The tool does not determine tax status or add a statutory rate, and tax already included in a charge must not be added again.
Check video, reports and opening or reinstatement
Watching a live camera image is not necessarily the same contractual service as receiving the video file.
Specify the needed format, route information, distance identification and report delivery date with the provider.
Check these charges separately in each outcome, including whether a report is payable after only a partial inspection.
Included or fixed extra
Included means no additional charge for the stated item.
A fixed extra is added to the confirmed subtotal in that scenario.
An explicitly confirmed zero is valid, while a blank amount or unanswered question is not a zero-price service.
Conditional cap or unconfirmed
A conditional cap represents an additional charge from zero up to the agreed maximum if its condition occurs.
A charge that definitely applies belongs under fixed extras instead.
Unconfirmed conditions or amounts prevent a fully established overall upper total.
Not provided records an explicit absence of that service and contributes zero to its charge.
If a required video or report is not provided, the partial or completed inspection cannot receive a qualified price ranking even when all amounts are known.
If opening or reinstatement is not provided, establish who will perform it and under which separate agreement; selecting that status does not arrange the work.
Cleaning, clearing and repair are also not automatically supplied.
A confirmed subtotal is not always the complete price
The confirmed subtotal preserves individually known components of the base charge and fixed extras.
For example, a known visit fee remains visible while the extra-metre rate is missing.
That partial figure is not the full quote.
Overall lower and upper totals, and the final balance, remain unresolved until every pricing component for that outcome is confirmed.
After every price is established
- Scenario lower total = base charge + fixed extras
- Scenario upper total = lower total + all conditional extra-charge caps
- Scenario balance range = each fully established total − the amount already paid to that provider
An unknown advance leaves the balance unresolved even if quote totals can be compared.
An advance changes the remaining payment, not the total-price comparison.
The tool does not subtract an advance from an incomplete subtotal and present it as final settlement.
A negative balance means the entered advance exceeds the charge under that particular outcome.
It is a reference difference, not an automatic refund or a determination of repayment rights.
Check the actual agreement on deposits, cancellation, no entry and later visits before settling.
Worked example: a 20m target with two branches
These fictional tax-inclusive KRW amounts test the calculation and are not market prices or recommended rates.
Both providers quote a completed scope of 20m and two branches; the common partial outcome is 8m and one branch.
Video and a report are required, the scope and access and completion definitions are confirmed, and each provider has already received 100,000 KRW.
| Outcome and measure | Quote A | Quote B |
|---|---|---|
| No-entry total | 50,000 KRW | 0 KRW |
| No-entry difference after advance | −50,000 KRW | −100,000 KRW |
| Partial-inspection total | 160,000 KRW | 180,000 KRW |
| Partial-inspection balance | 60,000 KRW | 80,000 KRW |
| Partial-inspection shortfall | 12m / 1 branch | 12m / 1 branch |
| Completed-inspection total | 300,000–350,000 KRW | 330,000 KRW |
| Completed-inspection balance | 200,000–250,000 KRW | 230,000 KRW |
A’s partial inspection
The base is 100,000 KRW with 5m included.
The extra 3m at 10,000 KRW per metre adds 30,000 KRW, and one branch beyond the zero included branches adds 20,000 KRW.
Video and opening or reinstatement are included, while the report costs a fixed 10,000 KRW.
The total is 160,000 KRW and the balance is 60,000 KRW, with a 12m and one-branch shortfall remaining.
A’s completed inspection
The base is 150,000 KRW with 10m and one branch included.
An extra 10m at 10,000 KRW per metre and one extra branch at 20,000 KRW bring the base calculation to 270,000 KRW.
Video is included and the fixed report adds 30,000 KRW, giving 300,000 KRW.
A conditional opening or reinstatement cap of 50,000 KRW creates the full 300,000–350,000 KRW range.
B’s no-entry charge is explicitly zero, its partial fee is a fixed 180,000 KRW, and its completed fee is a fixed 330,000 KRW, with all extra items included.
B is lower for no entry and A is lower for the matched partial outcome.
For completion, B’s 330,000 KRW lies within A’s range, so neither has a confirmed price advantage.
The next question is when A’s conditional opening or reinstatement charge applies.
Interpret overlapping prices and missing inspection scope
A is confirmed lower only when its upper total is below B’s fully established lower total for the same outcome.
Equal fixed totals are a tie; overlapping ranges, including ranges that touch at a boundary, do not establish a strict advantage.
The worksheet shows the effect of conditional caps without estimating the probability that they occur.
It does not combine the three outcomes into an expected cost or recommend an overall winner.
A cheaper partial inspection does not complete the target
At 8m on a 20m target, 12m remains uninspected, along with any missing target branches.
The partial ranking compares charges at the same stopping point.
A completion quote below the required quantities, or missing a required recording, is not treated as a cheaper complete inspection.
Scope confirmation records the information you have checked with each provider.
Changing endpoints, quantities, access information or required deliverables calls for renewed confirmation.
A price-comparison result does not certify provider quality, interpretation accuracy, equipment suitability, safe access or the legal effect of the agreement.
Use the worksheet from written quote to booking
- Agree on access, endpoints, target length and branch count.
Record diameter and equipment-access information, keeping unanswered site questions separate. - Set a common partial-inspection length and branch count and select whether video and a report are required.
Use the same hypothetical stopping point for both quotes. - Enter A’s completed quantities and billing method for each outcome.
For fixed billing, use the agreed base amount; for metered billing, separate the base, included quantities and extra-unit rates.
Add opening or reinstatement, video and report terms without duplicating included work. - Apply the same tax-inclusive basis to B and enter advances separately.
Leave unknown fields blank and use zero only after an explicit confirmation. - Read outcome totals, scope shortfalls, missing recordings and balances.
Save the comparison and unanswered questions, request written revisions, then return to the relevant quote to update the figures.
The example demonstrates a fictional calculation.
Returning from it restores your own working values and editing position so that you can continue the actual quote review.
Replace every example value with the provider’s confirmed agreement before relying on the comparison.
Practical situations and the calculation’s limits
Entry is uncertain because of a blockage
Ask about the no-entry charge and the definition of a partial inspection first.
If separate clearing is proposed to enable entry, establish its scope, approval and charge outside this inspection comparison.
The worksheet does not diagnose a blockage or prescribe a clearing method.
You need evidence for a later repair quote
Agree in advance on video files, location information and the report format needed for that purpose.
Inspection completion alone does not establish that every downstream recipient’s evidence requirements are met.
A required report that is not supplied needs a revised scope before qualified comparison.
Lengths allow up to two decimal places and branch counts are integers.
The entry limits of 100,000m, 10,000 branches and one trillion KRW are software limits, not equipment capabilities or technical inspection standards.
Negative values, infinity and excessive precision are not accepted.
Do not enter a pipe or choose a safe access procedure based on these cost results.
After diagnosis, compare recurring clearing against replacement with the drain-pipe clearing and replacement cost calculator, or compare confirmed repair methods with the sewer lining and excavation cost comparison.
For a separate cleaning contract’s quantities, finishing tasks and incomplete-job terms, use the pipe-cleaning quote comparison.
Frequently asked questions
Does this provide an average drain-camera price?
It checks actual tax-inclusive quotes for a matched scope and does not provide a national average or recommended rate.
Is a failed entry automatically free?
No-entry charges depend on the actual agreement, so enter zero only when a zero charge has been explicitly confirmed.
Should I add all three outcome prices?
No entry, partial inspection and completion are alternative outcomes and are not added together as one visit’s total.
Can each quote use a different partial length?
The comparison uses one common partial length and branch count to match the stopping scenario, so review different scenarios separately by changing those common inputs.
How is not provided different from unconfirmed?
Not provided explicitly means that the service is absent, whereas unconfirmed leaves the supply or price unanswered; missing a required report blocks partial and completion ranking.
Does a negative balance mean I get a refund?
It is a reference difference between the entered scenario charge and the advance, while actual deposit, cancellation and failed-inspection terms must establish any repayment.
Does included video establish whether replacement is needed?
Recording delivery is a contract item, while interpretation, pipe condition, replacement need and equipment access require the relevant professional’s assessment.
How do I enter a package without extra-unit rates?
Choose fixed billing for that outcome, enter the agreed visit and inspection base, then distinguish only separately fixed or conditional extras without duplicating included services.
Sources and review date
Sources were checked on 2026-11-21 for this 2026 worksheet.
The calculation uses confirmed contract amounts without a statutory fee or tax rate.
Recheck quantities, outcome definitions, taxes and handover terms for every contract, as public descriptions can change.
- Korean public-procurement sewer CCTV specification: a reference for separating inspection extent, recording information and reports.
Its public-contract rates and submission quantities are not household inspection terms. - Dongdaemun-gu 2026 sewer CCTV procurement plan: confirms an inspection-and-report service scope.
Its published budget is not converted into a domestic per-metre price.
Book with the inspection scope and failure charge in writing
Compare no-entry, partial and completion charges and send the unresolved scope and recording questions to each provider.
After receiving written answers on opening, reinstatement, handover and advances, update the same-scope comparison.
Have the provider confirm the actual site and work conditions before deciding how the target inspection will be carried out.