Boiler Manifold Circuit & Parts Quote Calculator

Compare replacement costs and missing services using technician-confirmed circuits and parts.

1. Technician-confirmed circuits & parts

Add only serviced circuits below. Rooms and circuits may differ. Enter confirmed zero for parts not replaced; leave unknown quantities blank.

Serviced circuit 1

2. Service scope & work date

3. Actual quotes (up to four)

Every included item is already covered by this package base. Separate items add the unit prices below. A fixed site labor fee can be entered in the package.

Manifold assemblies (sets) · Quantity Unknown
Valves (pieces) · Quantity Unknown
Actuators (pieces) · Quantity Unknown
Fittings (pieces) · Quantity Unknown
Circuit labor (circuits) · Quantity 1
Site callout (one visit) · Quantity 1

Quote comparison

Start with total circuits and confirmed replacement quantities. Blank or unknown differs from zero; the known subtotal is not the final bill.

Serviced circuits 1 · Valves Unknown · Actuators Unknown · Fittings Unknown
Final comparison pending · complete the items below.

Vendor 1

Known subtotal (before separate tax)

₩0 KRW

Completed total

—

Still to confirm

  • Total heating circuits
  • Assembly quantity
  • Circuit name
  • Planned work date
  • Valve quantities
  • Actuator quantities
  • Fitting quantities
  • Drain, refill & vent (one job)
  • Flushing (one job)
  • Leak test & commissioning (one job)
  • Removal & disposal (one job)
  • Quote valid-until date
  • Matching specifications, quantities & scope
  • Package base price
  • Manifold assemblies (sets) charge
  • Valves (pieces) charge
  • Actuators (pieces) charge
  • Fittings (pieces) charge
  • Circuit labor (circuits) charge
  • Site callout (one visit) charge
  • Drain, refill & vent (one job) charge
  • Flushing (one job) charge
  • Leak test & commissioning (one job) charge
  • Removal & disposal (one job) charge
  • Tax basis
Selected vendor line items
Quantities and known amounts
ItemQuantityKRW
Manifold assemblies (sets)UnknownUnknown₩0 KRW (partial)
Valves (pieces)UnknownUnknown₩0 KRW (partial)
Actuators (pieces)UnknownUnknown₩0 KRW (partial)
Fittings (pieces)UnknownUnknown₩0 KRW (partial)
Circuit labor (circuits)Unknown1₩0 KRW (partial)
Site callout (one visit)Unknown1₩0 KRW (partial)
Drain, refill & vent (one job)UnknownUnknown₩0 KRW (partial)
Flushing (one job)UnknownUnknown₩0 KRW (partial)
Leak test & commissioning (one job)UnknownUnknown₩0 KRW (partial)
Removal & disposal (one job)UnknownUnknown₩0 KRW (partial)

Only separately charged assemblies, valves, actuators and fittings change by ±this percentage. Package, labor and tax amounts stay fixed; this is not a price forecast.

Vendor 1: —

Before requesting a revised quote

This does not determine market prices, faults, compatibility or installation suitability. Planned work and quote validity dates are compared; checklist ticks are self-reported.

Compare manifold replacement quotes for the same circuits and parts

A manifold body price does not describe the whole repair bill.
Valves, actuators, fittings, circuit labour, travel, draining and refilling may have different inclusion rules even when two providers service the same two circuits.
This calculator applies one technician-confirmed scope to up to four actual quotations.

Use it before booking a partial replacement at home or approving a small building repair budget.
Known charges remain visible as a partial subtotal while unanswered quantity and scope questions stay separate for a revised quote request.
The decision is whether the required work is fully covered at the stated price.
This is a Korea-based 2026 quotation worksheet in Korean won (KRW), with sources checked on 2026-11-23.

Prepare the technician’s scope and written quote

Have the circuit inspection list, replacement part models and quantities, and the provider’s finishing-work description ready.
Photos can identify a location, but visible parts do not establish a fault or the need for replacement.
For the longer-term heating-cost decision, use the boiler repair versus replacement calculator separately.

Separate the whole system from the circuits being serviced

Total heating circuits

Enter the actual total confirmed at the manifold.
Room count is not automatically circuit count.
The total checks that the selected work rows do not exceed the system being described.
The supported range is 1–40 circuits.

One row per serviced circuit

Add only circuits within this job and identify each by room or circuit name.
Do not enter the same circuit twice under different labels.
The row count is the circuit-labour quantity, so adding untouched circuits changes the labour calculation.
More work rows than total circuits keeps the final comparison pending.

For a four-circuit system with work limited to the living room and bedroom, enter four as the system total and two work rows.
A reused manifold body can still need individual replacement parts.
A new assembly can also include parts within its package, which must be reconciled with the written quotation.
The quantity list records an agreed plan; it does not establish that a replacement method is suitable.

Use consistent units for bodies, valves, actuators and fittings

What each part quantity means

  • Manifold body or assembly: enter the agreed purchase units, from 0–40.
    Confirmed reuse is 0.
    The tool does not automatically count supply and return as two assemblies.
  • Valves: enter the actual replacements in each work circuit, considering the installed arrangement, included assembly parts and any reuse.
  • Actuators: enter the confirmed replacement count per circuit.
    There is no one-actuator-per-room assumption.
    Have the technician confirm compatibility with the existing controller, supply and connections.
  • Fittings: agree what one quoted unit includes.
    A connection point and a package of adapters or seals may be different purchasing units.

Each circuit accepts integer valve, actuator and fitting quantities from 0–100.
If one provider sells a pair as one package, reconcile units across quotes or obtain a clearly defined package breakdown first.
Matching counts alone do not establish matching models, materials or connection specifications.
Keep model identifiers and part numbers with the written quote or your supporting notes.

Confirm the finishing work as well as the replacement parts

Set draining/refilling and air removal, flushing, leak testing/commissioning, and removal/disposal to required, excluded or unknown in the common scope.
Use the site technician’s assessment; the calculator does not declare all four tasks mandatory.
A required task needs a confirmed included or separately priced status in each quotation.

Draining, refilling and air removal

Confirm the agreed section of the system covered by this work.
Work around the manifold may differ from a whole heating-system service.
This is a single site-level charge, rather than a charge automatically repeated for every circuit.

Flushing, testing and disposal

Ask whether flushing is needed and who performs the agreed post-work checks.
Record responsibility for removing and disposing of old parts.
Selecting included testing records contractual scope; it does not certify a test outcome or equipment safety.

Circuit labour is the number of work rows multiplied by the quoted rate, while travel is one site callout.
If travel is required but has no extra charge, record a confirmed separate zero or package inclusion.
For extra visits, access preparation, moving furniture or repairs outside these fields, first obtain a package price and scope that include the actual additional work.

Avoid charging included parts twice

Enter each provider’s package base price and then classify the required parts and work.
An itemized quote without a base package needs an explicitly confirmed base price of 0.
A blank means that the base price remains unanswered.
Money fields accept integer KRW amounts from 0–100,000,000.

Included in the package

Use included only when the entire required item quantity or task is already within the base price.
Its extra charge becomes 0, so the same valves are not added again.
If only some valves are included, ask for an itemized quote reflecting the actual extra charge instead of marking the whole item included.

Separate or unknown

Separately priced parts and circuit labour use confirmed quantity × unit rate.
Site tasks and travel use one confirmed amount.
Unknown is unanswered, rather than free.
An unused price for a confirmed zero part quantity or an excluded service does not block the comparison.

Inclusion must reflect what the provider has actually accepted.
A package covering another model or fewer work circuits is not the same scope even when its price is filled in.
Do not complete an uncertain quote by marking every item included; save its omission list and request clarification instead.

Blank, confirmed zero and a known subtotal mean different things

Reading a partially completed quotation

Leave a quantity blank until it is confirmed.
Enter 0 only when no replacement or no extra charge has been confirmed.
If two valves are known in one circuit and the other circuit’s valve count is blank, the known two-valve amount can contribute to the subtotal while the overall valve quantity stays incomplete.
It is not presented as a finished quotation.

The known subtotal combines the package price and separately priced amounts that can currently be calculated.
It is neither a cap including unanswered costs nor an invoice payable now.
All required quantities, tasks and prices must be known to complete the principal subtotal; final totals and provider comparison also require scope, dates and tax confirmation.
The overall cheapest-price ranking and spread remain pending if any participating quotation is incomplete.

A provider who has answered every question cannot automatically be called cheaper than providers with unanswered charges.
Resolve the listed issues before comparing complete totals for the same scope.
Equal lowest totals are joint-lowest quotes; appointment availability and warranty terms still need a separate contract review.

Use confirmed tax amounts and quote validity dates

Select tax included, separate or unknown.
Included means the entered package and rates already use that tax basis, and the calculator does not reverse-engineer a tax amount.
Separate adds the actual quoted tax total once.
No statutory rate or exemption is applied automatically, and every entered item must use the same agreed tax basis within a quotation.

Enter the planned work date and each provider’s quote-valid-until date.
Work on the expiry date is within the stated validity; work after that date keeps the final comparison pending.
Both must be real calendar dates.
The worked example uses 2026-12-01 for work and 2026-12-31 for quote expiry.
Editing these dates does not book a visit or renew the provider’s offer.

Worked example: service two of four circuits

These fictional prices validate the arithmetic and are not market prices or recommended charges.
The system has four circuits, two are serviced, and the manifold body is reused: 0 assemblies.
Circuit one needs 2 valves, 1 actuator and 2 fittings; circuit two needs 2 valves, 0 actuators and 2 fittings.
The quote therefore covers 4 valves, 1 actuator, 4 fittings and labour for 2 circuits.
Draining/refilling and testing are required, while flushing and disposal are excluded in this agreed example.

Fictional providers A and B for two serviced circuits; all amounts in KRW
ItemProvider AProvider B
Package base price0260,000
4 valves × 15,00060,000Included
1 actuator × 30,00030,000Included
4 fittings × 5,00020,000Included
2 labour circuits × 40,00080,000Included
Callout / draining and refilling20,000 / 30,000Included
Leak test and commissioningIncluded; extra 0Included
Principal subtotal240,000260,000
TaxSeparate confirmed 24,000Included
Final total264,000260,000

The final difference is 4,000 KRW.
A may appear cheaper before tax, but B is the lower entered quote after tax has been reconciled.
A’s 24,000 is an independently confirmed contract amount in this fictional example, rather than a rate to apply to other transactions.
For a small difference, recheck the replacement models and actual included scope before committing to the job.

Keep part-price sensitivity separate from the actual quote

A user assumption, rather than a supplier price range

Sensitivity changes only separately charged manifold bodies, valves, actuators and fittings by your chosen percentage.
The package price, labour, travel, site tasks and confirmed tax amount remain fixed.
The supported percentage is 0–100%, with final amounts rounded to whole KRW.
If quantities or tax would also change, edit the actual inputs for a revised quotation instead.

Assumed amount = final total + separate parts subtotal × (±change percentage ÷ 100)

A’s separately charged parts total 110,000 KRW.
At ±10%, subtracting or adding 11,000 to 264,000 produces 253,000–275,000 KRW.
B has no separately priced parts, so the same assumption leaves its 260,000 KRW package total unchanged.
This is not a market low/high range or a guaranteed extra-charge cap; confirm revised prices and tax with the provider before purchasing.

Move from the inspection list to a revised quote request

  1. Enter the whole-system circuit count and selected work circuits from the technician’s list.
    Distinguish unanswered quantities from confirmed zero replacements.
  2. Confirm whether draining/refilling, flushing, testing/commissioning and disposal are required, and enter the planned work date.
    Explicitly exclude work that is outside the agreed job.
  3. Enter each provider’s package price, inclusion status and separate rates.
    Switch providers to edit their quotations against the same common quantities.
  4. Confirm matching models, quantities and scope, then reconcile tax and quote expiry.
    Use only the known subtotal while issues remain; postpone the cheapest-price decision.
  5. Save the result and omission list as TXT or print them for the technician.
    Enter the revised figures and directly agree the partial-replacement scope and appointment.

The example is for learning and arithmetic checking.
It preserves your working inputs so you can return after viewing the fictional case; check whether example mode is active.
The site checklist is a personal record, and ticking it does not certify technical work or contract suitability.

Interpretation for partial repairs and package quotations

Replacing parts on selected circuits

Ask the technician to identify reused parts and untouched circuits.
Reusing the body does not mean that every other part quantity is zero.
Do not assume a partial replacement resolves problems on other circuits; record the agreed completion scope beside the result.

Package versus itemized pricing

Included part models and quantities must match before the price difference is meaningful.
A low assembly price can still omit actuators or fittings.
Request a component list where package contents are unclear, then compare complete final totals.

The tool does not diagnose faults or select parts, pressure, test duration, temperature or electrical supply specifications.
It does not provide installation, filling, testing, gas or electrical work instructions.
Suitability requires the relevant manufacturer instructions and a professional assessment of the actual site.
An overseas manufacturer’s arrangement or procedure is not a universal Korean legal requirement.
Review extra visits, warranty, cancellation, refunds and changed site conditions in the actual contract separately.

Frequently asked questions

Can I use the room count as the total circuit count?

Do not assume they match.
A room can have more than one circuit and installed layouts vary.
Have the technician distinguish the actual system total from the selected work circuits.

Should an unanswered quantity be entered as zero?

Leave it blank until confirmed.
Zero means a confirmed absence of replacement or extra charge.
Replacing blanks with zero can hide a cost that the required job still needs.

The assembly includes valves but the quote also lists a valve rate.

Ask whether all required valves are within the package price.
If so, choose included to avoid adding them twice.
For partial inclusion or a reference-only rate, obtain a breakdown of the actual extra charge first.

Why is there a known subtotal but no cheapest provider?

A quantity, required task, price, scope confirmation, tax basis or validity date may still be unresolved.
Read the issues attached to each provider.
All participating quotations need completion before the overall same-scope ranking appears.

Does separate tax automatically apply a fixed percentage?

No automatic tax rate is used.
Enter the separate tax total confirmed on the actual quotation.
For mixed inclusive and exclusive prices, obtain a consistent breakdown to avoid duplicated or missing tax.

Is the sensitivity range an available supplier offer?

It is arithmetic based on your assumed change to separate part prices.
Package prices, labour, site tasks and tax amounts stay fixed, so it is not a revised offer or price guarantee.
Confirm actual revised rates and tax with the provider.

Primary sources and update assumptions

These manufacturer sources support the distinction between components and work stages, rather than universal prices, Korean statutory quantities or mandatory tasks.
They were checked on 2026-11-23.
Recheck the supplier’s package and the applicable instruction edition for each actual contract.

Send the unanswered questions with your revised quote request

Complete the per-circuit quantities, inclusion scope, work date and tax basis, then save the report.
Send unresolved items to the technician and agree the same-scope revised quotation before arranging the work directly.
For cleaning-work scope itself, also see the pipe-cleaning scope and conditions quote calculator.

Related calculators