Automatic Door Sensor, Drive & Callout Repair Quote Calculator

Compare technician-confirmed parts, diagnosis credits and visits using actual KRW repair quotes.

Common confirmed fault & work scope

Blank means unknown; 0 confirms none needed. Labor uses door sets, not individual leaves. Night counts are surcharge-bearing visits within all visits; revisits are additional visits not counted as initial callouts.

Match the repair scope before comparing automatic-door parts prices

A sensor or motor price does not describe the whole automatic-door repair bill.
Compare the same site, technician-confirmed fault, labour unit, visit timing and follow-up work before interpreting a price difference.
This worksheet helps shop operators, building managers and family members compare up to four actual written quotes for one agreed job.

It adds confirmed parts and services, applies an agreed diagnosis-fee credit, and separates the repair total from the balance after payments.
An optional replacement quote supplies a separate replacement-minus-repair difference.
This is a Korea-based 2026 quotation arithmetic tool in Korean won (KRW), with sources checked on 2026-11-23.
The fictional example demonstrates the calculation; it is not a market price list or a recommended service charge.

Prepare a confirmed scope and written quotation

Have the site and model identifiers, technician’s diagnosis or work description, part quantities and written tax terms ready.
A symptom such as failure to open or close does not establish whether a sensor, controller or motor needs replacement.
Ask a qualified service provider to confirm the fault and part compatibility before entering the agreed quantities.

Separate door-set labour units from individual part quantities

Door sets determine the labour quantity

The first input is the number of door sets covered by this job.
Record single-leaf, double-leaf or mixed configuration and the technician-confirmed scope.
A double-leaf doorway is not automatically two door sets merely because it has two leaves.
Check whether labour is per set or for the whole job; reconcile a whole-job labour charge with the package and billing units before comparing providers.

Sensors, drives and rails use actual purchase units

Enter the confirmed number of replacement sensors, motors or drive units, and rails.
The tool does not infer these quantities from door-set count.
For a bundled engine or operator set, obtain its component list and check that its motor and rail are not charged again as separate parts.
Equal counts do not establish equal models, supply requirements, connectors or compatibility.

Use the common job description for site, model, diagnosed fault, configuration and the locations being repaired.
For example, a job covering two double-leaf door sets has two labour units, while two sensors and one drive unit remain separate technician-confirmed quantities.
If another door is later added, update the common quantities and the scope accepted by every participating provider.

Use included, separate and unknown to expose duplication and omissions

Enter each provider’s base package price, then classify each charge.
An itemized quote with no package requires an explicitly confirmed base amount of 0.
A blank base price means it has not been answered.
All component prices and the diagnosis credit must use the same agreed tax basis within one quotation.

Included means no additional charge

Use included when the provider confirms that the full required quantity or service is already covered by the package.
Its extra amount is 0, preventing the same part or labour from being added twice.
If only one of two sensors is included, obtain a reconciled quote for the actual extra portion rather than marking the entire sensor requirement included.

Separate means quantity multiplied by actual rate

Separately charged parts and labour use the confirmed quantity and the provider’s unit price.
Unknown is unanswered, rather than free.
Do not mark unresolved items included just to complete a total.
A confirmed quantity of 0 creates no additional charge for that item.

Check the component list and labour schedule against the same job.
Ask whether an operator assembly includes a rail or controller and whether existing sensors will be reused.
A lower price for another model or a smaller repair scope is not a like-for-like alternative.

Count initial visits, night supplements and return visits without overlap

Define each visit-related billing unit

  • Initial callouts: enter the initial visit count and charge per visit for this job.
    One trip covering several doors is not automatically repeated for each door.
  • Night supplements: multiply the applicable visit count by the additional night charge.
    Enter the supplement above the base visit charge, rather than the whole night-callout price.
    A visit may legitimately have one base charge and one separately agreed supplement.
  • Return visits: enter additional visits not already counted as initial callouts.
    Confirm whether a return after parts arrive is included or separate and what conditions apply to a warranty return.
  • Diagnosis: this field is one diagnosis amount for the agreed job, rather than a rate automatically repeated for every door.
    If the written quote diagnoses each door separately, reconcile those charges into the diagnosis total for this common scope.

A result with return visits assumes the entered number of visits under the selected contractual terms or user scenario.
It does not predict part shortages or failure probability.
If the count is uncertain, save the current inputs and vary it as a separate scenario; ask the provider to confirm the trigger for any extra charge in writing.
Do not count the same return trip in both the initial-callout and return-visit fields.

Deduct an agreed diagnosis-fee credit once

A provider may credit some or all of a diagnosis charge when the repair proceeds.
Another quote may have different diagnosis and travel terms or a visit charge applying only when no repair is ordered.
The calculator does not treat one supplier’s arrangement as a universal rule.
Check which fee is waived and whether the base package already reflects the waiver.

The credit is capped by the separately added diagnosis charge

A separate diagnosis fee of 40,000 KRW and a confirmed 40,000 KRW credit leave a net extra diagnosis charge of 0.
When diagnosis is included in the package, it was not added separately and cannot be deducted again.
A credit above the separate diagnosis amount, or an unknown credit, keeps the final comparison pending.
Enter an explicit credit of 0 when no credit has been agreed.

A diagnosis credit and an amount already paid have different purposes.
The credit reduces the contract’s repair total; a payment reduces the amount still due against that total.
Putting the same amount in both fields can reduce the balance twice.
Check the receipt and revised quote, especially if the written quotation already presents a net amount after deducting the diagnosis charge.

Confirm tax terms and quote validity before completing a total

Select tax included, separate or unknown.
Included means the package and component rates use the same tax-inclusive basis; the tool does not reverse-engineer an embedded tax amount.
Separate adds the actual quoted tax total once.
No statutory VAT rate or exemption is inferred.
A confirmed separate tax amount of 0 is different from an unanswered tax condition.

Validity dates and planned work date

Enter the start and expiry dates of each quotation and compare them with the common planned work date.
The work date must fall inside the interval, including both endpoints.
Missing, reversed or impossible calendar dates require clarification.
The example uses a start date of 2026-11-23, work date of 2026-12-01 and expiry date of 2026-12-31.
Changing a date does not book a visit or renew the provider’s offer.

An optional replacement alternative must also be an actual all-in quotation valid during that provider’s entered interval.
If only the replacement offer has different dates, obtain a revised offer covering a common valid date or keep it as a separate comparison document.
The date check supports price comparison; it does not determine contract enforceability or technician availability.

Repair total, remaining balance and replacement difference

Repair total

Base amount = package + separate parts + labour + diagnosis + initial callouts + night supplements + return visits − diagnosis credit
Repair total = base amount + actual separate tax

A tax-inclusive quote receives no additional tax charge.
Enter integer KRW amounts and round the final displayed result to the nearest won.

Balance after payments

Remaining balance = max(repair total − amount already paid, 0)
Overpayment = max(amount already paid − repair total, 0)

Enter the actual tax-inclusive payment amount.
Paying more in advance does not make a repair cheaper, so provider ranking uses the total before payments.
The overpayment is an arithmetic difference, rather than a determination of a refund right.

Replacement difference

Replacement difference = same-scope tax-inclusive replacement total − repair total

Confirm an all-in replacement price covering removal, installation, disposal and tax.
A negative difference means the entered replacement total is lower.
A replacement quote is optional and does not block repair comparison when absent.
The difference does not determine equipment life, safety, lifetime economics or whether repair or replacement is appropriate.

Worked example: repair A at 726,000 KRW and B at 700,000 KRW

Assume two double-leaf door sets, two replacement sensors, one drive unit and no replacement rails.
The agreed scope includes one initial callout, one night supplement and one return visit.
Every amount below is fictional and is not a recommended rate.

Fictional automatic-door repair quotations A and B for the same scope, amounts in KRW
ItemQuote AQuote B
Base package0700,000
2 sensors × 80,000 KRW160,000Included
1 drive unit220,000Included
Labour: 2 sets × 100,000 KRW200,000Included
Diagnosis / diagnosis credit40,000 / −40,000Included / 0
Initial / night / return visits30,000 / 20,000 / 30,000Included
Base after credit660,000700,000
Additional tax66,000Already included
Repair total726,000700,000
Already paid / remaining balance44,000 / 682,0000 / 700,000
Separate replacement total1,100,0001,000,000
Replacement difference374,000300,000

A starts at 700,000 KRW before its 40,000 KRW diagnosis credit, leaving a base of 660,000 KRW.
The entered tax amount of 66,000 KRW produces a repair total of 726,000 KRW, which is 26,000 KRW above B.
B assumes every applicable item is confirmed as included, so parts and visits are not added again.
An unanswered scope or tax question in either quotation keeps the overall lowest-cost comparison pending.

Read partial subtotals and sensitivity separately from a final quote

A known subtotal is not an upper bound

Blank means unknown; 0 means confirmed none.
Amounts that can currently be calculated remain visible as a known subtotal while missing required information withholds the final total and overall lowest-price ranking.
A subtotal covering only sensors may later need motor, diagnosis and travel charges.
Save the outstanding questions and request clarification instead of using that subtotal as a spending cap.

Sensitivity varies separate parts only

The sensitivity assumption varies separately charged sensors, drives and rails by the user’s percentage.
In example A, separate parts total 380,000 KRW; ±10% changes them by 38,000 KRW and gives repair totals of 688,000–764,000 KRW.
Package, labour, diagnosis credit, visits and the entered 66,000 KRW tax amount stay fixed.
This is not a revised quote with recalculated tax or a predicted market-price range.

B has no separately charged parts, so its total does not change under this particular sensitivity assumption.
That does not guarantee B’s price will remain fixed under other contract changes.
To test different quantities or visit counts, change those original inputs and compare the resulting scenario.
Sensitivity calculations retain fractional intermediate amounts and round the final result to whole won.

Five steps from source documents to a revised quote request

  1. Define one common scope.
    Enter door sets, configuration, technician-confirmed parts, visits and planned work date.
    Leave unconfirmed quantities unanswered instead of inventing defaults.
  2. Transcribe each provider’s quote.
    Enter dates, package, inclusion status, separate rates and diagnosis-credit terms.
    Check that all amounts within that quotation use a consistent tax basis.
  3. Separate payments from the replacement alternative.
    Enter actual payments and, when available, an agreed all-in tax-inclusive replacement total.
    Do not treat an absent optional replacement offer as a missing repair charge.
  4. Resolve unanswered items first.
    Review known subtotals and outstanding questions, then return to that provider’s inputs.
    If you opened the fictional example, restore your working values before reviewing your own quotation.
  5. Request a revised quote and arrange the visit.
    Use TXT export or print to share scope, charge differences and credit details, and review the confirmation checklist.
    Agree appointment timing, warranty coverage and exclusions, and the trigger for chargeable return visits separately with the provider.

Practical situations for this comparison

A shop arranging work around trading hours

Compare daytime and night work using the same base callout, supplement and return-visit scope.
Alongside the total, confirm parts availability and the actual appointment window.
The tool does not estimate lost sales, repair duration or safety.

A site with several entrances

Include only the doors being repaired in this job and distinguish door-set labour from individual parts.
Keep another site’s travel and incompatible tax bases out of the same quote comparison.
When entering information for a parent or manager, confirm the diagnosis and payment records with them before using the result.

Door sets, parts and visits use whole-number counts; money uses whole KRW.
The input limits of 10,000 for quantities and 1,000,000,000 KRW for money are technical validation limits, not normal quantities or legal limits.
Correct arithmetic cannot make a mistaken model or scope comparable.
For longer-term opening-cycle, maintenance and power budgets, use the high-speed-door operating-budget calculator with separately confirmed supplier inputs.

Frequently asked questions

Does this provide average sensor or motor repair prices?

No average rate is embedded.
Enter actual site, part and provider quotations for the same scope.
The worked figures are fictional.

Should a double-leaf door always double parts and labour?

No.
Door sets and individual parts are different units.
Confirm how the doorway is billed and how many sensors are actually required with the technician and written quote.

Is diagnosis always fully credited when repair proceeds?

No universal full-credit rule is applied.
Only an agreed credit up to the separate diagnosis charge is deducted.
Diagnosis already included in a package is not deducted again.

How do I enter free return visits or waived travel?

Keep the actual visit count and record confirmed inclusion or a separate charge of 0.
If the waiver condition is unresolved, leave it unknown and ask the provider rather than assuming it is free.

Will the tool automatically add a tax percentage?

No automatic tax rate is applied.
Confirm included or separate terms and enter the actual separate tax amount.
Unknown tax withholds final totals and the overall comparison.

Will a payment larger than the total produce a negative balance?

The remaining balance is 0 and the difference is shown as an overpayment.
That arithmetic does not determine a refund right or repayment date.

Does a negative replacement difference mean I should replace the door?

It only means the entered same-scope replacement total is lower than the repair total.
Discuss parts availability, warranty, installation scope, equipment life and safety with a professional separately.

Can I pick the cheapest provider while one quote is incomplete?

The overall lowest-price decision stays pending if required information is unresolved in a participating quotation.
A known subtotal is neither free service nor a cap.
Resolve the missing items before comparing complete totals.

Sources and checks to repeat for the next contract

Sources were checked on 2026-11-23.
Supplier material supports component distinctions and variable service coverage, rather than Korean standard prices, statutory tax rates or mandatory repair rules.
No published supplier price has been copied into the calculator as a default.

The repair and visit-fee pages use different wording for basic travel inclusion, so the actual written quotation must settle the applicable condition.
Overseas service descriptions do not establish Korean attendance guarantees, qualification rules or safety standards.
For every contract, reconfirm model compatibility, fault scope, quantities, package duplication, diagnosis credit, return and warranty terms, tax amounts and validity dates.

Resolve omissions before confirming a repair appointment

Enter the confirmed diagnosis and written quotations above.
Start with door sets and part quantities; unanswered items can remain blank while you obtain clarification.
Save the totals, credits, remaining balances and outstanding questions to make the revised-quote request concrete.
Complete the actual booking and safety checks with the service provider.

Return to automatic-door quote inputs

Related calculators