Export Crate, Recovery & Treatment Quote Calculator

Compare actual quotes for external CBM, treatment, corrosion protection, site work and recovery in KRW.

One cargo item per crate · dimensions mm · money KRW

Cargo dimensions before packing

0.01–10,000 · Up to 2 decimals

0.01–10,000 · Up to 2 decimals

0.01–10,000 · Up to 2 decimals

1–10,000 · Whole numbers

All crates use the same cargo dimensions. Calculate different cargo separately.

0–1,000 · Up to 2 decimals

0–200 · Up to 2 decimals

0–1,000 · Up to 2 decimals

Use supplier-confirmed clearance, thickness and base height. Estimated dimensions support quote review and do not establish structural strength or load capacity.

Forwarder and packing-supplier checklist

Use the sources below to discuss HT 56°C for 30 minutes and processed-wood / 6 mm exemptions with the responsible party. Checks are personal records, not quarantine, structural or tax approval.

Compare export crating by outside volume and included work

Cargo dimensions alone do not describe the complete export packing bill.
Cushioning, wooden walls and base runners increase outside dimensions, while rust protection, on-site work, treatment, documents, collection and disposal may be charged separately.
This calculator places up to four actual written quotes on the same scope and unit basis.
Use the outside CBM and itemized review to request a revised quotation from your forwarder and packing supplier.

Documents and scope to prepare

Have your cargo drawing, number of identical crates, per-side clearance, wall thickness, extra base height, supplier-confirmed outside dimensions, destination requirements and dated quotes ready.
The model assumes one cargo item in each identical crate.
Run different sizes or mixed loads separately and check how shared charges are allocated.
Amounts are contract cash outlay in KRW, before any tax recovery; international freight and engineering are separate confirmations.
Korean 2026 quarantine references support the checklist, while destination-country requirements still need verification.

Material descriptions and quarantine confirmation are separate

Two wooden crates may use different combinations of solid wood, plywood, runners and braces.
Record the drawing revision, material composition, treatment method and mark details in the specification note.
The treatment confirmation records your supplier or specialist review of the applicable requirements.
Typing a material name does not establish quarantine compliance or guarantee customs clearance.
Recheck the scope whenever the destination or transport requirements change.

ISPM 15 exemptions and heat treatment

ISPM 15 includes exemptions for packaging made entirely from processed wood and packaging made entirely from thin wood 6mm or less in thickness.
Plywood walls do not automatically exempt solid-wood runners attached to the crate.
Conventional HT requires at least 56°C throughout the wood, including its core, for at least 30 continuous minutes.
The chamber air temperature alone is not that measurement.
These are treatment-check references, not a formula for the treatment price.

Estimate outside dimensions from the confirmed packing allowance

Enter the maximum unpacked cargo length, width and height in mm, including handles, pipework and fixtures that will travel with it.
Clearance is a per-side value, so twice the allowance is added to each dimension.
Two wall thicknesses are also added, and extra base-runner height is added once to height only.
Zero allowances on the blank form are editable inputs, not standard packing specifications.

Estimated outside dimensions

Estimated length = cargo length + 2 × clearance + 2 × wall thickness
Estimated width = cargo width + 2 × clearance + 2 × wall thickness
Estimated height = cargo height + 2 × clearance + 2 × wall thickness + extra base height

This is a geometric planning estimate.
It does not design load capacity, lifting points, fasteners, stacking strength or moisture protection.
If the actual construction does not fit this simple allowance model, have the specialist revise the common specification and confirmed outside dimensions first.
An outside dimension smaller than the required estimated envelope leaves the quote comparison pending.

Separate cargo CBM, outside CBM and billed CBM

CBM means cubic metres, or m³.
Multiply dimensions in mm, divide by 1,000,000,000, then multiply by the number of identical crates.
Cargo CBM measures the unpacked goods; estimated outside CBM comes from your common allowances.
Actual outside CBM uses each supplier’s confirmed dimensions.
Missing actual dimensions are not silently replaced with the estimate for billing.

Total outside CBM = outside length × outside width × outside height × crates ÷ 1,000,000,000
Billed CBM = ceil(total outside CBM ÷ contract billing increment) × contract billing increment
Packing volume increase = actual outside CBM − cargo CBM

A zero billing increment leaves total outside volume unchanged.
A positive increment rounds the whole consignment once, rather than rounding every crate individually.
For example, 1.800288CBM rounded to a 0.1CBM increment becomes 1.9CBM.
Freight tonnes, air-freight weight conversion, minimum freight charges and port costs require the forwarder’s own quotation.
Outside volume alone does not determine those charges.

Match the base charge and eight additional cost items

Choose whether the base packing price is per order, per crate or per billed CBM.
An order price applies once, a crate price is multiplied by crate count, and a CBM price uses that supplier’s billed CBM.
Additional items have the same unit choices.
A shared delivery charge should not be entered as a per-crate charge unless the contract bills it that way.

  • Cushioning and rust protection: confirm the agreed materials and the scope of cushioning, VCI, moisture barriers or other protection.
    The same rust-protection process is not required for every cargo.
  • On-site work: identify travel, labour, equipment and packing at the site.
    Ask whether loading, unloading and night work are included.
  • Treatment and documents: separate the actual treatment process from documents required by the destination and contract.
    An included treatment charge does not prove that all required evidence has been checked.
  • Collection, disposal and freight: identify responsibility for empty crates, packing remnants, final disposal and delivery.
    Collection and disposal are separate services.

Each item can be included, separate, not needed or unknown.
Included and not-needed items add no separate charge even if an older amount remains in the form.
A separate item with a blank price, or an unknown status, keeps the final total pending.
A confirmed free service can be entered as a separate zero charge.
That is different from assuming an unquoted service is free.

Use the tax basis and rounding from your actual contract

For a VAT-included quote, the entered cost sum receives no additional tax.
For an excluded quote, enter the rate confirmed for the contract.
An unknown tax basis or missing required rate leaves final cash outlay pending.
The calculator does not determine zero-rating, exemption, tax liability or input-tax recovery.
The worked example’s 10% is a fictional contract assumption, not a default rate for export packing.

Round the final total once

Excluded-tax total = round(unrounded cost sum × (1 + contract tax rate ÷ 100))
Included-tax total = round(unrounded cost sum)
Displayed added tax = final total − displayed whole-KRW subtotal

Intermediate unit-price and volume products are not individually rounded to whole KRW.
The final sum is rounded once, so reconcile any supplier-specific line-by-line truncation or rounding on the actual invoice.
When only some costs are confirmed, the known subtotal is a partial figure, not the complete bill.
The final result represents cash payable, rather than accounting cost after recoverable tax.

Validity dates and confirmations control the final comparison

The decision date is the date on which you intend to adopt the quotation.
It must fall between the quote’s valid-from and valid-until dates, including both endpoints.
Blank dates or an end date before the start date require clarification.
Quote validity is different from the packing date or vessel departure date.
For older quotes, check whether materials, site visits or other terms have changed before ordering.

A confirmed total requires destination requirements, common dimensions, actual outside dimensions, supplier scope confirmation, treatment-requirement confirmation, all item states and necessary prices, and tax terms.
If treatment is not needed, record the basis for that confirmation in the note.
One complete quote is not declared cheapest while another active quote is incomplete.
The lowest total and highest-to-lowest difference appear only after all active alternatives meet the comparison conditions.

From cargo drawing to the pre-order review

  1. Start with cargo length, width, height and identical crate count, then enter confirmed clearance, wall thickness and base height.
    Review cargo and estimated outside volume first.
  2. Record destination requirements and the decision date.
    Request revised quotes if suppliers assumed different transport or import conditions.
  3. Enter the selected supplier’s actual outside dimensions, specification note, validity dates and confirmations.
    Switching suppliers preserves their entered values.
  4. Copy the base price, billing unit, CBM increment and included-work states.
    Confirm separate prices and tax terms to resolve the remaining questions.
  5. Compare outside volume and total cash together, then review treatment, collection and disposal omissions.
    Save the TXT review or print it for the forwarder and supplier before placing the order.

The fictional example demonstrates the calculation flow.
You can restore your earlier inputs and selected editing position after reviewing it.
Saved reviews retain dimensions, units, rounding, dates, inclusion states, unanswered questions and your checks.
Replace the example with the actual written quotes before sharing it, so fictional prices are not mistaken for agreed contract amounts.

Worked example: two crates and two supplier totals

Assume two identical cargo items, each measuring 1000 × 800 × 600mm.
Per-side clearance of 50mm, wall thickness of 20mm and extra base height of 100mm produce estimated outside dimensions of 1140 × 940 × 840mm.
Total cargo volume is 0.96CBM and estimated outside volume is 1.800288CBM.
The increase is 0.840288CBM, approximately 87.53% of cargo volume.
That percentage is specific to these dimensions and is not a standard packing surcharge.

Fictional supplier A

KRW200,000 per crate × 2 = KRW400,000
Rust protection 30,000 + treatment 50,000 + collection 20,000
Subtotal KRW500,000; quoted excluded tax 10%
Total KRW550,000; KRW275,000 per crate

Fictional supplier B

Same outside dimensions and agreed scope
Whole-order VAT-included quote KRW560,000
Total KRW560,000; KRW280,000 per crate
Highest-to-lowest difference KRW10,000

All remaining items are confirmed included or not needed in this example.
Actual outside dimensions equal the estimate for both suppliers.
With a whole-consignment 0.1CBM billing increment, each billed quantity is 1.9CBM.
The example decision date is 2026-11-24, within validity from 2026-11-01 to 2026-12-31.
Actual dimensions, prices and treatment scope can differ by supplier and need written confirmation.

Price sensitivity is a scenario, not a revised quotation

Sensitivity changes only the base packing unit price by your chosen percentage.
Crate count, actual dimensions, CBM billing increment, extra charges and tax terms remain unchanged.
For supplier A, a ±10% base-price change moves the base charge from KRW360,000 to KRW440,000.
Adding the unchanged KRW100,000 extras and quoted tax produces totals of KRW506,000 to KRW594,000.
This range is not a market-price confidence interval or a supplier-guaranteed discount band.

A CBM-based base price still uses the same billed quantity; sensitivity does not alter volume or crate count.
Changing the crate size may also change wood usage, labour and freight, so update the dimensions and request a new quote from the supplier.
Overlapping sensitivity ranges indicate that modest unit-price changes could reverse the cost order.
Resolve missing work and scope differences before treating a small price advantage as decisive.

Collection, reuse, repair and disposal are different operations

Paying for collection does not establish that a crate can be reused for the next export.
The current Korean notice distinguishes reuse of marked, unaltered packaging without reinfestation, repair involving replacement components, and remanufacture.
Repaired packaging needs the applicable treatment and marking for replacement components.
Remanufacture has different requirements, including removal of old marks followed by treatment and marking.
Selecting collection never automatically sets the next treatment charge to zero.

Record whether collection concerns packing remnants at origin or empty crates at destination, and who pays for transport, dismantling, storage and disposal.
Destination collection may involve another supplier, currency, tax basis and scope; reconcile it to the same KRW contract basis before entering it here.
A treatment certificate, treatment-work result, phytosanitary certificate and packaging mark are distinct evidence.
Do not assume every shipment needs the same separate certificate.
Confirm the destination and contract’s actual document requirements.

Frequently asked questions

Do cargo dimensions complete the packing design?

No.
Estimated outside dimensions add your clearance, walls and base height.
The packing specialist still needs to confirm load capacity, lifting, securing and stacking suitability.

Can estimated CBM be used immediately as billed volume?

Missing actual dimensions leave the billing quantity unconfirmed.
Enter the supplier-approved outside dimensions and check whether rounding applies to the whole consignment or each crate.

Is every plywood crate exempt from ISPM 15?

Check the whole construction, including solid-wood runners and braces.
An exemption for packaging made entirely of processed wood does not automatically cover mixed solid-wood components.

Is a chamber temperature of 56°C enough for HT?

The standard concerns at least 56°C throughout the wood, including its core, for at least 30 continuous minutes.
Confirm actual treatment, marks and evidence with the registered provider and relevant authority.

Will a leftover price on an included item be counted twice?

Included and not-needed states add no separate amount.
Separate items use the confirmed price and billing unit, while unknown states leave the final comparison pending.

Can I use 10% when the tax rate is unknown?

Confirm the contract tax basis and rate first.
The example’s 10% is not a default legal rate, and unknown tax terms leave final cash outlay pending.

Does a collected crate have zero treatment cost next time?

Collection and eligibility for reuse are separate.
Check marks, reinfestation, repair or remanufacture status and destination requirements, then enter the actual next quotation.

Does the saved review replace a certificate or purchase contract?

The review communicates dimensions, prices, included work and remaining questions.
Certification, legal compliance and the final purchase contract require separate authority and supplier procedures.

Primary sources and update checks

Sources were checked on 2026-11-24 through the Korean National Law Information OPEN API and primary documents.
The current Plant Protection Act provisions were checked for effect on 2026-06-16, its Enforcement Rule on 2026-04-22, and the wood-packaging quarantine notice on 2025-01-02.
Checklist references include Act Articles 28-3 and 40, Rule Articles 37-3 and 46, and Notice Articles 2 and 3 with its annexes.
Recheck destination-specific requirements, amendments and actual material and treatment evidence before ordering.

Wabtec describes a specific supply chain’s requirements, not Korean universal specifications, mandatory work or standard prices.
This calculator adds actual contract values and supplies no market-price defaults.
Recheck quote validity, unit definitions, CBM rounding, taxes and inclusion states whenever you calculate a new order.

Confirm the outside dimensions and omissions before ordering

Check that every supplier used the same destination, specification and treatment requirements before choosing by price.
Send the cargo-to-outside volume increase, included-work review and unanswered questions to your forwarder and packing supplier.
Confirm international freight and quarantine suitability separately, then reconcile the revised quote with the actual purchase contract before committing the order.

Return to the export crating calculator

Related calculators