Compare air conditioner cleaning quotes by equipment and work scope
An advertised starting price does not establish which units or internal parts a contractor will clean.
Filter cleaning on one wall unit can differ from dismantling and cleaning a standing unit’s blower fan.
This calculator places two or three actual written quotes side by side and separates known base charges, confirmed supplements and unresolved amounts.
It does not fill missing quotes with assumed market prices.
Use it when booking several units, arranging cleaning for a parent’s home or checking the scope offered for ceiling units.
Send every vendor the same models, quantities, required parts and site conditions before entering their replies.
The output provides a checklist for requesting revised quotes before making a reservation.
Amounts use KRW and the manufacturer examples concern services in Korea, reviewed for the 2026 project year.
Start with one equipment list and one set of site conditions
Type, model, capacity and quantity
Identify wall-mounted, standing, ceiling 1way, ceiling 2way, ceiling 4way or other equipment.
Record the model and capacity, then the whole-number quantity of identical units on that row.
The calculator supports up to eight equipment rows.
Separate models with different sizes or structures so that each vendor can confirm the work it can provide.
Date, site and access
Record the planned cleaning date, location conditions, dirt, working space and any high ceiling or equipment-access issue in the common notes.
Give each quote its actual confirmation date.
Check in writing that every vendor has quoted the same site, date and required work rather than comparing totals from different circumstances.
For a 2in1 arrangement, list the standing and wall-mounted indoor units on separate rows.
If a vendor supplies one bundle price, ask how to record its component base prices without duplicating the bundle total.
Do not put the same package price on both rows.
A quote cleaning only one indoor unit does not match a scope requiring both units.
Check individual parts rather than relying on a package name
- Heat-exchanger cleaning: confirm the method and covered area for the actual model.
- Blower-fan dismantling and cleaning: distinguish removal of the fan from cleaning it while installed.
- Drain-pan dismantling and cleaning: confirm whether the water-collection component is removed and which work is provided.
- Reassembly and operation check: confirm that operation is checked after the equipment is put back together.
Select required tasks for each equipment row and keep at least one task selected.
A description such as full disassembly does not automatically include all four tasks.
If a vendor cannot provide a required task, leave it unavailable and request a revised quote.
Removing a genuinely required task merely to hide the vendor’s omission changes the service you are comparing.
Ceiling-fan dismantling has model-specific exceptions
The reviewed LG Electronics cleaning guide describes cleaning ceiling 1way and 2way blower fans without dismantling them.
Do not assume that every ceiling unit supports fan removal.
Discuss why you require dismantling and what alternative work the vendor can provide.
If the required scope changes, obtain confirmation of that same revised scope from every vendor.
Distinguish included, fixed, conditional, unknown and unavailable work
Included and fixed extra charges
Included means the task is already covered by the equipment base charge and is not added again.
A fixed supplement is the gross amount for the entire equipment row, including tax.
For a row containing three identical units, enter the confirmed supplement for all three units once.
Do not multiply it by the unit quantity again.
If the vendor gives a per-unit supplement, first confirm the total for the row.
Conditional amounts and unresolved work
For a conditional supplement, record the trigger and the lower and upper total extra charges.
The lower amount may be zero when the work may not occur, but the condition needs written confirmation.
An absent upper amount or unfinished written confirmation causes the overall upper total to be withheld.
Unknown means inclusion or price has not been established; unavailable means the vendor will not perform required work.
A blank or unknown amount is not a free service.
A zero price alone does not establish that the required work is included.
Deselected tasks and stale extra amounts in included rows are not added to the calculation.
After changing a status, review the current written quote and notes again.
If the original wording is unclear, ask the vendor to answer separately for each required part and charge.
Enter outdoor-unit and site charges as project totals
Outside the equipment rows, choose whether outdoor-unit cleaning, travel and parking, height or access equipment, and other site work are required.
For each vendor, establish whether each item is included, a fixed supplement or dependent on a later site check.
These entries are gross project-wide total charges including tax.
They are not automatically multiplied by the number of indoor units.
Do not copy one vendor’s parking amount into another quote as an estimate.
Samsung Electronics Service’s residential professional-cleaning guide excludes outdoor units from that service.
This is a boundary of the reviewed service, rather than a rule applying to every contractor.
If outdoor-unit cleaning is needed, establish whether the particular vendor provides it.
A professional must assess access and equipment needs for high locations; this calculator does not derive safety or a standard surcharge from the unit’s location.
Separate a minimum floor from an additional travel charge
Minimum as a base-charge floor
The equipment base sum is the sum of each quoted unit price multiplied by its quoted quantity.
A floor uses the larger of this sum and the quoted minimum, once.
For an equipment sum of KRW 200,000 and a minimum of KRW 220,000, the applicable base is KRW 220,000.
The two amounts are not added together.
Separate surcharge
A separate travel surcharge is added to the equipment base sum.
Adding a KRW 220,000 surcharge to a KRW 200,000 equipment sum makes the applicable base KRW 420,000.
The same entered amount therefore produces a materially different result depending on the billing method.
Use the method stated in the written quote.
Select no minimum only after establishing that no additional minimum applies.
If the billing method is unresolved, leave it unknown so the upper total and single-lowest-quote decision are withheld.
Do not enter the same travel charge both through the minimum surcharge and the project travel row.
If a different parking expense remains, record only that separate amount and explain the distinction in the notes.
Apply confirmed base discounts and actual base-price VAT
Enter only a written, confirmed base-price discount, no greater than the base after applying the minimum.
Base prices, the minimum and the discount must share the tax basis used in the quote.
If the base includes tax, no separate base VAT is added.
If VAT is separate, enter the actual KRW VAT amount payable on the discounted base.
The calculator does not apply a tax rate or determine tax treatment.
Equipment-task and project supplements are entered as gross totals, so do not add their tax again in the base-VAT field.
If the vendor only gives tax for the entire bill, ask for the actual base VAT and gross supplements in the form needed here.
Keep VAT unknown until the amounts are reconciled.
Do not deduct an anticipated multi-unit or promotional discount before the vendor confirms eligibility, amount and validity.
Read confirmed subtotals, conditional totals and equipment rates
Confirmed subtotal and total range
Confirmed subtotal C = base after minimum − base discount + known base VAT + required fixed supplements.
Lower total L = C + the sum of conditional lower amounts.
Upper total H = C + the sum of confirmed conditional upper amounts.
H is withheld for required unknown or unavailable work, a missing upper amount, unfinished written confirmation, an unknown minimum method or unknown VAT.
Effective rate for an equipment row
Add that row’s unit price × quantity and its fixed task supplements, then divide by the row quantity.
The whole quote’s minimum, base VAT, discount and project supplements are not arbitrarily allocated to individual units.
This rate describes known equipment-row costs and is not the final bill divided by the total number of units.
A confirmed subtotal does not mean that every cleaning charge has been settled.
When unresolved items remain, it describes the known portion only.
Likewise, a lower total does not cap future charges.
Use whole KRW amounts and whole-number quantities.
Correct negative values, reversed ranges or invalid calendar dates against the original document.
Check the planned date, quote confirmation date and validity, and obtain a new quote when the price has expired.
Check the fictional A and B example
These numbers illustrate the calculation and are not market prices or manufacturer fees.
The common equipment is one wall-mounted unit and one standing unit.
A quotes unit prices of KRW 80,000 and KRW 120,000; B quotes KRW 100,000 and KRW 140,000.
Both vendors are assumed to have confirmed the same equipment and required work in writing.
Quote A
Apply the KRW 220,000 minimum floor to an equipment sum of KRW 200,000, then subtract a KRW 20,000 base discount.
Add actual base VAT of KRW 20,000, a fixed fan supplement of KRW 30,000 and travel of KRW 20,000.
C is KRW 270,000.
A written conditional height charge of KRW 0–20,000 makes the total KRW 270,000–290,000.
Quote B
The tax-inclusive equipment base is KRW 240,000.
Add KRW 70,000 in required fixed supplements to obtain C, L and H of KRW 310,000.
This assumes confirmation that there are no conditional supplements.
Leaving a field blank does not establish that no further charge applies.
Fictional air conditioner cleaning quotes A and B: confirmed subtotal, conditional total and remaining cash| Item | Quote A (KRW) | Quote B (KRW) |
|---|
| Confirmed subtotal C | 270,000 | 310,000 |
| Lower L to upper H | 270,000–290,000 | 310,000 |
| Deposit already paid | 50,000 | 50,000 |
| Remaining cash | 220,000–240,000 | 260,000 |
A’s upper total of KRW 290,000 is strictly below B’s lower total of KRW 310,000, so A is lower within the entered ranges.
Changing A’s minimum method to a separate surcharge of the same amount makes C KRW 470,000.
Removing written upper-bound confirmation or changing a required task to unknown withholds the single-lowest decision even if old amounts remain entered.
Load the fictional example and change confirmation states to examine the difference.
Keep the lowest-quote decision separate from prepaid cash
The quoted equipment type, model-and-capacity text after trimming leading and trailing spaces, and quantity must match the common list.
Written confirmation of the common conditions and a calculable upper total are also required for comparison.
Only when every quote meets these requirements can a quote be identified as lower: its upper total must be strictly below every other quote’s lower total.
A tie, touching endpoints or overlapping ranges withholds a single-lowest decision.
A deposit already paid is not a discount on the overall cleaning cost.
It reduces only the remaining cash calculated from each total.
Paying more in advance does not make an otherwise identical quote cheaper.
A prepaid amount greater than the confirmed subtotal requires reconciliation of its amount and allocation.
The comparison concerns entered costs and does not establish contractor quality or contract performance.
Enter quotes and request a written revision step by step
- Record the planned date and site conditions, then use equipment photographs or documents to identify types, models, capacities and quantities.
- Select required dismantling and cleaning tasks and project extras, and send the same list to all vendors.
- Enter each quote’s confirmation date, actual equipment rates, minimum method, written base discount and actual base VAT.
- Check task inclusion, gross whole-row supplements, conditional triggers, lower totals and upper totals.
- Read equipment mismatches, omitted parts and reasons for withholding the upper total, then save the checklist as TXT or print it.
- Obtain revised quotes, update the inputs and written confirmations, and calculate again before booking.
Recalculate after editing inputs rather than continuing to use an old result.
A change to the common equipment or required conditions also requires fresh vendor confirmation.
Keep the current inputs and unanswered questions in the saved checklist so that omissions from a telephone discussion remain traceable.
When another family member makes the booking, share the equipment photographs, original quotes and final written confirmations with them.
Frequently asked questions
Can I get a price before obtaining actual quotes?
The fictional example explains the structure, but an actual comparison requires vendor-provided rates and scope.
For a whole-home cleaning budget, use the move-in cleaning calculator first.
Its appliance option is not a replacement for a written disassembly-cleaning quote.
Does cleaning an installed blower fan count as dismantling it?
If dismantling is a required comparison condition, do not mark in-place cleaning as the same task.
Some model structures have a non-dismantling service procedure, so confirm what is possible before setting your requirements.
The calculator does not judge the performance or suitability of a method.
Where do I enter a multi-unit discount?
Enter a written, confirmed base-price discount once.
If the entered equipment unit rates already include that discount, do not deduct it again.
For a package discount covering supplements too, ask the vendor to clarify the base and supplement amounts needed for this structure.
Can I compare lower amounts without an upper limit?
The lower amount is the start of known costs and does not limit the final expense.
A quote without an upper amount leaves further charges unresolved, so the single-lowest decision is withheld.
First request written triggers and maximum charges.
Do equipment effective rates add up to the final bill?
Each rate covers only that row’s base and fixed task supplements divided by its quantity.
Read the quote-wide minimum, discount, VAT, project extras and conditional range separately.
Use the complete subtotal and total range for the final comparison.
Does the result guarantee cleaning quality or compensation?
It is an arithmetic comparison, not a guarantee of cleaning effectiveness, odor removal, fault prevention, a statutory refund or compensation.
Separately check the pre-work equipment condition, contracted scope, completion procedure and contact for problems in the actual contract.
Use the equipment checklist to obtain comparable quotes
A clear list of required parts and maximum supplements helps distinguish a low base price from omitted work.
Request revised quotes and enter the current figures to compare confirmed subtotals and remaining cash.
Relocation and cleaning are separate services, so check costs already included in each contract when arranging both during a move.