PCB Prototype Panel, Assembly and Test Lot Calculator
Match panel quantities, BOM, assembly and test charges to one good-board target and review up to four quotes in KRW.
1. Shared target and specification
1–1,000,000 · whole numbers
1–64 · whole numbers
0.0001–10,000 · up to 4 decimals
0.0001–10,000 · up to 4 decimals
Layer count and board size identify comparable quotes. Enter a supplier-confirmed board count per panel.
2. Panel and process quote
0.0001–10,000 · up to 4 decimals
0.0001–10,000 · up to 4 decimals
1–10,000 · whole numbers
0.1–100 · up to 4 decimals
0.1–100 · up to 4 decimals
0–100 · up to 4 decimals
Started boards → expected fabricated boards → expected good boards. BOM spares only increase component procurement. Passing the area check does not approve rails, depaneling or layout.
3. Review order budget
Enter target good boards, boards per panel and both yields to see required panels first.
Total pending · known subtotal
—
Still needed: Target good boards, Layer count, Board width, Board height, Panel width, Panel height, Confirmed boards per panel, Fabrication yield assumption, Assembly / test yield assumption, BOM procurement spare rate, Tax treatment, Panel fabrication / base package, BOM component procurement, Assembly charge, Stencil, Setup / additional NRE, Inspection charge, Shipping / other
Yields are assumptions, not good-board guarantees, confidence intervals or IPC / AQL acceptance decisions. An inspection charge does not automatically include functional testing.
Compare PCB prototype quotes against one good-board target
A bare-board unit price does not describe the entire prototype order budget. Whole-panel ordering, fabrication losses, spare components, assembly preparation and test coverage can use different charging quantities. A target of 100 working prototype boards therefore does not automatically mean buying exactly 100 bare boards and 100 component sets. This calculator compares up to four quotes using the same target, showing required panels, confirmed cost subtotals and the complete lot budget when all costs are known.
Read these three results first
How many panels are needed under the entered yield assumptions?
Which BOM, assembly, stencil, setup, test or delivery costs still need confirmation?
What are the lot total and cost per good-board target under the same scope and tax basis?
Good-board quantities are model outputs from your yield assumptions, not guaranteed delivery quantities or statistical confidence bounds. The calculator does not certify quality, electronic-design safety or test acceptance. Agree on the delivered quantity and acceptance criteria with the supplier separately. All entered and displayed amounts use KRW; English does not change the currency to USD.
Start with the shared target and board specification
The first field is the target number of good boards. Include the quantities you intend to allocate to development validation, sample distribution and retained samples, then keep that target identical for every quote. Layer count and individual board width and height document the common specification; they do not automatically price laminate, copper weight, thickness or surface finish.
Keep these conditions consistent
Compare the same layers, finished dimensions, material, thickness, copper, finish, assembly sides, BOM revision and test scope. Record specifications without a dedicated input in the quote request and avoid treating revised designs as the same product.
Enter supplier-specific conditions separately
Panel size, confirmed boards per panel, fabrication yield, assembly/test yield, component allowance and charging units can differ between quotes. Supplier name, quote date and validity date help you locate the original document when requesting an update.
Enter counts as positive integers and dimensions from 0.0001 to 10,000mm. Yields must be within 0.1–100%; the BOM allowance range is 0–100%. Dimensions, yields, allowance and the confirmed tax rate support up to four decimal places. Missing values or values outside the supported ranges are not silently replaced with assumptions. Complete the indicated fields before using a final budget.
Use a supplier-confirmed boards-per-panel count
The calculator does not parse Gerber files or design an optimal panel layout. Enter the boards-per-panel count confirmed on the quote or approved panel drawing. An aggregate board area larger than the panel outline is an input error, but a smaller aggregate area does not prove that rails, separation and manufacturing constraints are satisfied.
Confirm the panel drawing
Does the panel outline include the required handling rails and fiducials?
Are board separation, V-cuts or breakaway tabs, and finished outlines agreed?
Are rotated boards, projecting connectors and assembly orientation acceptable?
Are mixed designs, special routing and rail removal covered by the quoted cost?
No single rail width or gap is imposed as a universal manufacturing rule. Constraints depend on the supplier and service, so retain the supplier-approved drawing as the basis of the panel count. Panels and individual boards appear as separate quantities to prevent an order for six panels being read as an order for six boards.
Apply fabrication and assembly/test yields in sequence
Let T be the target good-board count, N the boards per panel, Yf the fabrication yield and Ya the assembly/test yield, with percentages converted to fractions. Inverting the whole-board floors at each stage gives the minimum panel count P = ceil(ceil(ceil(T ÷ Ya) ÷ Yf) ÷ N). The calculator then derives board starts S = P × N, expected fabricated boards F = floor(S × Yf), and expected good boards G = floor(F × Ya).
Why both ceiling and floor matter
ceil rounds a required quantity up to an integer; floor discards fractional boards at each production stage. The combined-yield expression ceil(T ÷ (N × Yf × Ya)) is a first estimate, but stage-by-stage floors can require more panels. The inverse formula rounds up the fabricated boards, board starts and panels needed for the target in that order. Do not add the two yield percentages or subtract the same loss again after it has already been included in a yield.
Fabrication yield describes bare boards available to the next stage; assembly/test yield describes the share of those boards remaining as final good boards. If a supplier provides only a combined final yield, agree on the calculation boundary instead of inventing an arbitrary split. A 100% input is your no-loss assumption, not an automatic supplier guarantee of defect-free production.
Separate BOM allowance from assembly charging quantities
The BOM allowance is a separate budgeting assumption for consumption and supplier-requested spares. On the default board-start basis, the BOM procurement count is B = ceil(S × (1 + allowance ÷ 100)). On an expected-fabricated-board basis, the same allowance is applied to F instead. A BOM quoted per panel or per lot is not multiplied by the board allowance again. An unknown allowance on a board basis leaves the BOM procurement quantity unknown; it is distinct from a confirmed 0% allowance.
Use quote-converted board costs
For per-board BOM, assembly and test entries, use costs converted to the selected board basis from the actual quote. A price per component or solder joint is not automatically a price per board. Confirm the component count, joint count and board quantity used in the conversion.
Procurement limits
The model does not optimize component-specific MOQs, package sizes, full reels, substitutions, existing stock or recovery of unused parts. If the actual purchase order differs from a board-based allowance, enter the supplier-confirmed BOM lot amount instead.
Assembly and test default to the expected fabricated-board count. Change an item to board starts, panels or a fixed lot if that is how the supplier charges. BOM allowance does not increase assembly and test charges automatically, because those processes can use different billing boundaries.
Resolve separate, included and unknown costs before comparing totals
Separate
The confirmed rate is multiplied by its panel, board or lot quantity. Enter a zero rate only when a free item has been confirmed.
Included
An item included in the base package is not added a second time. This does not mean that the process is absent or has zero underlying cost.
Unknown
A missing amount or unconfirmed inclusion keeps the quote pending. The confirmed subtotal is useful, but it is not a complete lot total.
The fabrication/base-package price must be confirmed separately. Mark setup, stencil or delivery as included when they are already paid through that package. A blank rate under a separate item is not a zero rate; send the missing-item list to the supplier.
Tax-included quotes receive no additional tax. For a tax-exclusive quote, enter only the contract rate you have confirmed. For confirmed subtotal K, the total is round(K × (1 + rate ÷ 100)), rounded once to whole KRW. An unknown tax basis keeps the final total and per-good-board costs pending. This model assumes one tax basis for the whole quote: obtain a consistent revised quote for mixed-basis transactions rather than applying one rate indiscriminately. The calculator does not determine statutory tax liability or exemption.
Worked example: six panels for a target of 100
These are fictional inputs for explaining the arithmetic, not market prices or recommended yields. Enter two layers, a 50×40mm board, a 250×200mm panel, a confirmed count of 20 boards per panel, 95% fabrication yield, 90% assembly/test yield and 10% BOM allowance. For a target of 100 good boards, the model gives six panels, 120 board starts, 114 expected fabricated boards, 102 expected good boards and 132 board-equivalent BOM sets.
The confirmed subtotal is KRW 595,000. Entering a 10% exclusive tax rate for this fictional contract gives a total of KRW 654,500, KRW 6,545 per target good board and KRW 6,417 per expected good board. The 10% example is not a universal default for actual contracts.
Quote B uses the same quantities with fabrication at KRW 12,000 per panel, BOM at KRW 1,800 per board-equivalent set and assembly at KRW 900 per fabricated board; the remaining rates match A. Its subtotal is KRW 569,200 and total under the same confirmed tax assumption is KRW 626,120, a difference of KRW 28,380. The resulting costs are KRW 6,261 per target good board and KRW 6,138 per expected good board. Check that a price difference does not conceal different component, test or delivery scope.
Target and expected-good-board unit costs use different denominators
Budget per target good board is round(total ÷ T), which compares the money needed to fund the same target. Cost per expected good board is round(total ÷ G), which also includes the modelled extra good boards created by whole-panel ordering. More expected good boards can lower the second measure without reducing the lot total. Keep the denominator attached to each unit cost.
Read the ±5 percentage-point yield sensitivity
The sensitivity holds other conditions and rates constant and changes assembly/test yield by five percentage points, capped at 100% and floored at 0.1%. It is an assumption comparison, not a statistical error interval. For Quote A, an 85% scenario needs seven panels and produces 113 expected good boards with a total of KRW 745,250. At 95%, it needs six panels and produces 108 expected good boards with a total of KRW 654,500.
The lower-yield scenario can show more expected good boards because it orders an additional whole panel. That does not imply a better yield; the starting quantity has increased. Use sensitivity to discuss budget headroom, while keeping supplier-guaranteed quantities and delivery commitments separate.
Define the scope behind the PCB test price
An included test line needs an explicit process and defect boundary. Bare-board electrical testing, post-assembly optical or visual inspection, X-ray of selected components and functional testing address different questions. The calculator records the agreed scope as one test amount; when several tests apply, convert their combined quoted cost to the agreed board, panel or lot basis.
Bare-board electrical test: confirm open/short coverage, the agreed population or sample, and whether it is included in fabrication
AOI or visual inspection: confirm sides, assembly checks, review scope and any extra manual inspection charge
X-ray: confirm selected components or joints, quantities and charging units; a component price is not a board price
Functional test: agree on procedures, firmware, fixtures, acceptance criteria and responsibility for retest or rework
An included inspection charge does not automatically establish completed functional testing or safety certification. Checklist selections record your confirmation; they do not independently verify what the manufacturer performed. Keep an unresolved test amount unknown and request a revised quote rather than assuming that it is free.
From initial inputs to a revised supplier quote
Enter the shared good-board target and specification, and identify the Gerber, BOM and CPL revisions
Enter each approved panel size, boards-per-panel count and clearly defined yield assumptions
Match fabrication, BOM, assembly, stencil, setup, test and other charges to their inclusion status and unit
Use a consistent tax basis and resolve the missing items with the supplier
Compare complete totals, target unit budgets and panel counts, then read yield sensitivity
Save a TXT worksheet or print it, and request a revised quote with the quantities and scope explicitly stated
Switching quote tabs preserves each quote, and you can return to your own inputs after opening the example. Retain assumptions and pending items in the saved worksheet instead of sending a total without its basis. Before ordering, recheck component availability, substitution approvals, international freight, customs, lead time, quote validity and extra processing.
Frequently asked questions
Does the calculator automatically fit boards onto a panel?
No. Enter the supplier-confirmed count. The area check identifies obvious input errors, but it does not replace an approved drawing covering rails, machining, rotation and component clearance.
Why are fabrication and assembly/test yields separate?
They distinguish boards available after fabrication from final good boards and make the assembly and test charging basis visible. Avoid counting the same loss twice, and agree on the stage boundaries with the supplier.
Is a 10% BOM allowance mandatory?
No. It is an example assumption. Use the actual consumption, spare and packaging requirements. A board allowance cannot fully reproduce component MOQs or reel purchases, so a confirmed BOM lot quote can be a better input.
How is included different from a zero rate?
Included means an item is already paid through the base package and must not be added again. A separate zero rate records a confirmed free item. An unknown or blank amount prevents a complete final budget.
Does included inspection cover functional testing?
Not automatically. Confirm bare-board electrical test, AOI or visual inspection, X-ray and functional test separately, including quantities, fixtures and acceptance criteria, then enter the agreed cost.
Why does a target of 100 produce 102 expected good boards?
The model orders whole panels and applies yields at each stage. The two extra boards are an arithmetic surplus under your assumptions, not a delivery guarantee or a statistical allowance.
What if tax-included and tax-exclusive items are mixed?
The model assumes a consistent tax basis within each quote. Obtain a revised quote on one basis before entering it, rather than applying one rate to a mixed transaction.
Can I immediately order from the lowest total?
A cost difference starts the comparison. Confirm identical components, board specification, test scope, lead time and extra charges. A quote with unknown items should not be treated as equivalent to a complete quote.
Primary sources and conditions to recheck
Technical source review date: 2026-11-23. These manufacturer documents support the distinction between processes and inspection scope. Their prices and rail dimensions are not adopted as universal calculator defaults.
For every order, recheck current rates, included processes, BOM procurement conditions, panel approval and the tax basis. Service policies can change; the calculator is an arithmetic model of the contract assumptions you enter.
Request a revised quote for the same good-board target
Enter your target and confirmed panel and process costs above, then review every pending item. Send the worksheet with required panels, BOM procurement quantities and test scope to the supplier so differing quotes can be answered against the same question. Set the order budget after considering both the complete cost comparison and the actual manufacturing and inspection conditions.