Compare nitrogen generation and cylinders on one supply specification
This calculator compares annual operating costs and initial cash for on-site nitrogen generation and cylinder supply that meet an agreed process specification.
It is intended for manufacturing and food-business operators, purchasing teams, and finance staff who already have usage records and supplier quotations.
The comparison includes compression, drying, maintenance, and backup supply so that a generator purchase price does not stand in for the complete supply cost.
Start with annual nitrogen demand, available operating hours, and simultaneous peak flow.
A cylinder refill price and a generator electricity estimate cannot form an equivalent comparison while purity definitions, delivery pressures, or reference-volume conditions differ.
Results are planning values derived from your inputs; they do not select the purity required by a process or establish gas-handling safety.
All monetary inputs must use one currency and one tax-inclusion basis.
The English interface uses CU, meaning currency units, and does not convert the Korean example through an exchange rate.
Use the result to confirm a quotation
Check annual and peak shortfalls first, then compare annual costs, net savings, equipment investment, initial cash, and simple payback.
Save the result and checklist as a TXT file or print them for the supplier.
Confirm guaranteed supply conditions, compressor and dryer scope, piping and installation, backup terms, and deposit-return timing before updating the quotation inputs.
Align purity definitions, pressure, and the Nm³ reference basis
A purity percentage is only part of the specification
Confirm whether purity means measured nitrogen content or 100% minus residual oxygen.
Two quotations labelled 99.9% do not automatically have equivalent argon, moisture, oil, or particle conditions.
Both numerical purities must meet the entered requirement, and the process owner must also confirm the definition, residual O₂, dew point, and impurity conditions.
A higher stated purity does not replace this review.
Reference conditions and delivery pressure
Annual demand, usable cylinder volume, and guaranteed flow must use the same reference temperature, absolute pressure, and humidity.
Do not assume that every value called Nm³ uses 0°C.
For example, the Atlas Copco NGP 20–360 data sheet states a 20°C, 1 bar(a), 0% RH basis for Nm³/h.
Enter comparable pressure at the process supply point in bar(g) for both alternatives.
This tool does not automatically convert between different reference-volume conventions.
Ask suppliers for values on one basis and record the agreed temperature, pressure, and humidity in the reference-basis field.
Changing purity or delivery pressure also requires the corresponding guaranteed flow and energy consumption.
Reusing an air factor or flow rating from a different specification can overstate both supply capacity and savings.
Check annual volume and simultaneous peak separately
Annual supply balance
Planned generation = annual demand × (1 − backup share)
Planned backup volume = annual demand × backup share
Annual generation capacity = guaranteed flow × available hours
The backup share is the part of total demand supplied by cylinders instead of generation.
It is not extra demand added to generator output.
Available annual hours should reflect shutdowns, maintenance, and scheduled supply interruptions.
The result identifies an annual shortfall when planned generation exceeds the stated capacity.
Simultaneous peak delivery
A system that meets annual volume may still fail when several processes draw gas at the same time.
The entered simultaneous peak is checked against guaranteed delivery flow independently.
Enter flow guaranteed for continuous production and delivery at the selected purity and pressure; do not enter an instantaneous buffer discharge rate.
Even when storage can supply a peak above that continuous rating, this tool holds the comparison; obtain separate professional review of stored volume, recovery time, and pressure conditions.
The calculator does not infer peak capability from tank size or design the pressure and piping system.
Annual demand divided by available hours cannot exceed the entered peak flow without contradicting the demand record.
Correct units or periods before continuing.
Annual or peak shortfalls hold the financial comparison rather than silently assuming that more gas is available.
A 100% backup share represents no generation and all-cylinder demand; generator peak checking is skipped, while specification and cost confirmations still apply.
Use usable gas per cylinder and the actual billing scope
Usable volume means the supplier-confirmed gas that can actually be used from each cylinder on the agreed reference basis.
It is not the cylinder water volume in litres, and it is not automatically calculated by multiplying water volume by fill pressure.
Minimum process pressure, cylinder changeover residuals, purging, and switching losses can reduce usable supply below nominal contents.
Use measured records or a confirmed contractual Nm³-per-cylinder value.
Round cylinder counts upward and separate deposits
Current cylinders = ceil(annual demand ÷ usable volume per cylinder)
Backup cylinders = ceil(annual backup volume ÷ usable volume per cylinder)
Annual cylinder cost = current cylinders × (refill + delivery per cylinder) + annual rent
This is an annual pooling model: demand just above a full-cylinder boundary needs another cylinder.
For delivery-per-trip charges, monthly minimums, or emergency fees, confirm a suitable per-cylinder allocation or fixed-cost scope with the supplier.
Do not include one delivery charge in both the unit price and a fixed annual amount.
The model does not deduct a residual value for gas left at year end.
Backup gas uses the same usable volume, refill price, and delivery price entered for the cylinder alternative.
A backup contract with different cylinder contents or pricing does not match that assumption; obtain quotations on a consistent basis before using the comparison.
Existing refundable deposits are tracked separately from annual operating expenses.
Account for the complete generation energy boundary
Whole-system specific energy
Enter confirmed kWh per Nm³ of nitrogen at the required purity and delivery pressure.
Check whether the figure includes the compressor, dryer, and auxiliaries.
Adding their consumption again would double-count energy.
Annual additional idle and start-up kWh should include only energy outside the chosen specific-energy figure.
Air-factor method
Nitrogen specific energy E
= air factor × compressed-air specific energy
+ auxiliary specific energy
The air factor is the inlet air volume required for a unit of produced nitrogen.
Confirm the numerator and denominator reference conditions.
Compressed-air energy is in kWh/Nm³ of air, while auxiliary energy is in kWh/Nm³ of nitrogen.
Use a supplier-confirmed factor for the selected purity and pressure, rather than a generic value.
Annual generation operating cost
Annual electricity = planned generation × E + annual additional kWh
Annual generation cost = electricity × electricity price + annual maintenance
+ backup cylinders × cylinder unit price + fixed backup cost
Include separately payable filters, drying, consumables, service, and inspections in the annual maintenance scope.
Fixed backup cost covers items such as standby and rental fees; consumed backup gas is calculated separately.
Electricity prices come from your contract.
The tool does not reproduce demand charges, time-of-use tariffs, basic charges, or tax calculations.
Distinguish equipment investment, initial cash, and payback
Investment and cash to prepare
Equipment investment I = generator + compressor/dryer + installation
Initial cash paid = I + new backup deposit
Net initial cash = cash paid − confirmed existing-deposit return
Installation should include the quoted one-off piping, electrical, freight, and commissioning scope.
The entered return cannot exceed the existing refundable deposit.
Refundable deposits are not automatically treated as equipment investment or annual expense.
Check actual payment dates, return dates, and contractual conditions separately.
Simple equipment payback
Annual net savings = cylinder cost − generation cost
Simple payback years = equipment investment I ÷ annual net savings
A finite payback requires positive investment and positive annual savings.
With positive investment and zero or negative savings, there is no finite payback under these assumptions.
Confirmed zero equipment investment with nonnegative savings means no additional equipment investment to recover.
A returned deposit does not reduce the equipment investment used in this payback calculation.
Simple payback excludes loan interest, depreciation, inflation, discounting, taxes, and terminal equipment value.
It assumes the same annual demand and recurring costs continue.
If an approval needs NPV or a complete asset-life cash flow, take the component values into that separate investment appraisal.
Use the same currency and tax-inclusion basis for both alternatives; changing interface language does not convert money.
Break-even volume is a continuous-volume approximation
Variable savings and fixed-cost difference
m = (1 − backup share) × (cylinder unit price ÷ usable volume − E × electricity price)
F = maintenance + fixed backup cost + additional electricity cost − current rent
Operating break-even demand ≈ max(0, F ÷ m)
Target-payback demand ≈ max(0, (F + I ÷ target years) ÷ m)
The tool calculates an upward demand threshold only when m is positive.
When m is zero or negative, this method has no increasing-volume break-even threshold to report.
A threshold is outside the current supply range when planned generation exceeds guaranteed continuous flow × available hours, or when threshold annual demand ÷ available hours exceeds the entered fixed peak flow.
Actual cylinder and backup costs are stepped because cylinder counts round upward.
The continuous approximation is therefore not an exact minimum contractual volume or a guarantee of savings at every higher quantity.
Re-enter demand around the threshold and compare actual rounded cylinder counts with the supplier billing schedule.
The −20% and +20% demand scenarios keep other assumptions fixed; they are not a forecast, confidence interval, or probability assessment.
Worked example: 10,000 Nm³ per year on one specification
These are fictional arithmetic-check inputs, not market prices, a published electricity tariff, or standard equipment performance.
Assume both supplies have 99.9% stated purity and 7 bar(g) delivery pressure, with the same reference conditions and confirmed process equivalence.
Annual demand is 10,000 Nm³, available time is 2,000 hours, simultaneous peak is 8 Nm³/h, guaranteed flow is 10 Nm³/h, and backup share is 10%.
CU means a consistently chosen currency unit throughout the example.
Volumes and cylinder cost
Planned generation 9,000 Nm³ · backup 1,000 Nm³
Annual capacity 20,000 Nm³ · annual/peak shortfall 0
Usable 10 Nm³/cylinder · current 1,000 · backup 100 cylinders
Refill CU 20,000 + delivery CU 1,000 per cylinder
Current rent CU 600,000/year
Annual cylinder cost = CU 21,600,000
Generation cost and savings
E 0.6 kWh/Nm³ · additional 400 kWh/year
Annual 5,800 kWh × CU 150 = CU 870,000
Maintenance CU 1,000,000 · fixed backup CU 300,000
Backup gas 100 × CU 21,000 = CU 2,100,000
Annual generation cost = CU 4,270,000
Annual net savings = CU 17,330,000
Initial cash and simple payback
Generator CU 20,000,000
Compression/drying CU 5,000,000 + installation CU 5,000,000
Equipment investment = CU 30,000,000
New deposit CU 500,000 → cash paid CU 30,500,000
Existing deposit CU 2,000,000 · confirmed return CU 1,000,000
Net initial cash = CU 29,500,000
Equipment payback ≈ 1.7311 years
Approximate thresholds and demand scenarios
m = CU 1,809/Nm³ · F = CU 760,000/year
Operating threshold ≈ 420.1216 Nm³/year
Three-year target ≈ 5,948.0376 Nm³/year
Demand 8,000 Nm³ → savings CU 13,712,000/year
Demand 12,000 Nm³ → savings CU 20,948,000/year
The air-factor method produces the same E from 3 Nm³ air/Nm³ nitrogen × 0.18 kWh/Nm³ air + 0.06 kWh/Nm³ nitrogen of auxiliary energy: 0.6 kWh/Nm³ nitrogen.
Generation runtime is 9,000 ÷ 10 = 900 hours; do not multiply production by all 2,000 available hours again.
Keep the 1,000 Nm³ of backup supply out of generation electricity to avoid double-counting the same demand.
Enter, review, and confirm the supplier scope
- Enter annual demand, hours, simultaneous peak, required purity, and pressure in the common-conditions tab, then record reference conditions.
- Copy usable contents, refill, delivery, annual rent, and the existing deposit into the cylinder tab.
Known cylinder counts and current costs can be read while the generation quotation is still incomplete.
- In the generation tab, enter flow guaranteed at that purity and pressure, backup share, energy method, electricity, maintenance, and fixed backup fees.
- In the initial-cash tab, separate equipment and installation from deposits, and enter the target payback period.
- Check the reference basis, purity definition, process quality, delivery-point conditions, and commercial scope against actual documents before confirming the checklist.
Resolve held items and shortfalls with the supplier first.
- Save or print the result and return to editing when a condition changes.
After opening the example, restore the original input to return to the prior values and tab.
A blank means unknown, while zero means a confirmed zero.
Enter zero for verified free delivery or a cost already included elsewhere; do not use zero to fill an unknown quotation item.
A partial current-cost subtotal does not mean the complete comparison is ready.
Missing confirmations or insufficient purity, pressure, or flow hold the comparison, which is different from zero savings or no payback.
Frequently asked questions
Does higher nitrogen purity automatically make a supply option better?
First confirm the specification needed by the process.
Higher purity may change guaranteed flow and energy consumption, and oxygen-based purity is not automatically identical to a nitrogen assay.
The calculator does not rank purity figures without process-equivalence confirmation.
Should I enter the cylinder size in litres as usable contents?
No.
Cylinder water volume and usable reference-state gas volume are different quantities.
Use supplier-confirmed usable Nm³ per cylinder after applicable residual-pressure, changeover, and purge conditions.
Can energy be zero if the factory already owns a compressor?
Ownership does not make incremental electricity or available compressed air free.
Confirm the additional compression energy, drying, and filter costs on one measurement boundary.
A confirmed zero additional purchase cost is different from zero recurring consumption.
Does an existing-deposit return shorten equipment payback?
This simple equipment payback does not subtract refundable deposits from equipment investment.
The confirmed return affects net initial cash instead, making cash preparation visible separately.
Check when the deposit is actually returned; a later return may not fund an earlier equipment payment.
Is every volume above the approximate threshold guaranteed to save money?
The continuous approximation omits cylinder rounding and contractual minimum charges.
Recalculate actual demand around the threshold and confirm annual capacity and peak flow.
A threshold outside the current system capacity requires a new quotation with the larger system’s investment, energy, and guaranteed performance.
Does the result approve safety or food/medical gas suitability?
The result supports cost planning and quotation confirmation.
Asphyxiation and oxygen-deficiency hazards, pressure vessels, piping, ventilation, statutory inspections, and food or medical process suitability require separate review by qualified professionals and the supplier.
An economic result is not an approval for use or a safety assessment.
Sources and review date
Source review date: November 27, 2026.
Manufacturer material supports the specification and cost boundaries to confirm.
Model-specific flows, air factors, and promotional payback claims are not used as universal default inputs.
Reconfirm prices, usable contents, electricity prices, air factors, energy, maintenance, and backup terms for each quotation.
Do not carry old guaranteed figures across a model or contract revision.
Review source links and product documents at least every six months.
Prepare two quotations on an agreed specification
Align reference conditions, purity, and supply-point requirements using current usage records and both quotations.
Enter confirmed values above and send the saved comparison to suppliers to resolve installation scope and backup costs before making the equipment decision.