Lab Test Sample & Panel Order Budget Calculator

Reconcile lab-confirmed test items, sample counts, approved bundles and separate retest costs using actual quotes in KRW.

Confirmed order scope

Use counts of the same lab-confirmed sample unit within each model. Confirm mass, volume and usable test portions separately.

Budget & sample reconciliation

Base order total (KRW)

Unconfirmed

Known base subtotal: 0 KRW

Start with a sample / model name and available sample count. Enter the lab quote and required quantities in the next section.

Before submission: lab checks

Reconcile this worksheet with the lab application and quote. Checkmarks record your review, not test suitability or certification approval.

Related calculators

Plan a lab test order with both fees and sample requirements

This lab test sample and panel order budget calculator turns a laboratory-confirmed test plan into an itemized purchasing worksheet.
Connect each model to its test item, method, conditions and repetitions to check the order amount and the number of samples still needed.
It is useful when several departments request tests for one delivery, or when an additional test changes an existing quotation.

Save the worksheet and compare it with the laboratory application and quotation before submitting samples.
The result depends on the scope you enter matching the scope accepted by the laboratory.
A test report is not a prediction of passing or certification, and a result for submitted samples does not guarantee the quality of every product.
Required tests and regulatory applicability must be confirmed separately.

Prepare the quotation and follow the input sequence

  1. Identify each model, test item, method and condition in the laboratory documents.
    Keep tests in separate rows when the test portion or conditions differ, even if their names are similar.
  2. Enter available samples by model and the total sample requirement for every test row.
    If the laboratory allows sharing, obtain its confirmed total requirement for the base tests and record the approval.
  3. Confirm whether billing is per item or per sample, then enter the billed quantity per repetition, number of repetitions and unit price.
    Separate charges already included in the quotation from additional fees.
  4. Enable the retest scenario only when you want to price additional testing.
    Enter the actual retest items and quantities, resolve unconfirmed fields, and save or print the worksheet.

Use one confirmed sample unit for each model

Model and available samples

Register different product models separately.
Available samples are the pieces you can actually submit, which may differ from saleable inventory.
Confirm the packaging, markings, test portion and required quantity with the laboratory before treating stock as usable samples.

Total samples required by a row

The sample requirement is the total for all repetitions in that test row.
It is separate from the number of billable samples per repetition.
Do not multiply this total by repetitions a second time.
Destructive testing or preparation can make physical requirements differ from billed quantities.

The calculator compares counts in the same laboratory-confirmed unit within each model.
It does not convert grams, millilitres, test pieces or packaged products into one another.
Whether one finished product can supply all required test pieces depends on its material and the methods involved.
Even a sufficient piece count may not provide enough weight or usable test area.

Per-item billing, per-sample billing and repetitions

Per-item cost = 1 × repetitions × unit price
Per-sample cost = billed samples per repetition × repetitions × unit price
Base order = base test rows + preparation + report + urgent + delivery + other fees

Per-item billing uses one billing unit for each repetition of an item.
Per-sample billing multiplies the actual billable sample count by the unit price and repetitions.
Check whether a quoted amount covers an entire panel, one item, one sample or all repetitions together.
A quotation already covering every repetition must be represented in matching billing units so that its total is not multiplied again.

Enter whole Korean won amounts.
The calculator adds no assumed discount or tax rate.
Use the same tax-inclusive or tax-exclusive basis throughout, and put separately confirmed tax into other fees once if necessary.
Both language versions use KRW without currency conversion.
The workflow uses current laboratory quotations rather than a statutory fee schedule or a market-price default.

Duplicate candidates and approved panel inclusion are different

Rows with the same model, item, method, conditions and repetition count are flagged as duplicate candidates within the same scenario.
A flag is a request to review the order, not an automatic deletion or deduction.
If separate portions, lots or purposes require both tests, describe the distinction and keep the necessary rows.
Base and retest rows belong to separate scenarios and are not merged simply because their item names match.

Apply inclusion only with laboratory approval

If an item is already covered by another paid panel, select its directly payable reference row in the same model and scenario and record the approval.
Only a valid approved inclusion makes the included row cost zero separately.
Cross-model or cross-scenario references, chains of included rows and circular references are invalid.
Inclusion in a price does not remove the physical sample requirement.

Approved sample sharing and shortages

Without approval, base sample requirements are added independently for each model.
If the laboratory has reviewed representative sampling or the test sequence and confirmed one total for the base tests, enable sharing and enter that approved total and its approval note.
The approved total must remain within the independent sum.
Sharing cannot conceal an unconfirmed requirement in an individual row, and samples from different models are not pooled.

Compare requirements with available stock

Base shortage = max(0, base required − available)
Shortage including retest = max(0, base required + additional retest required − available)
If available stock is blank, the shortage is unconfirmed.
A zero shortage means only that the entered counts cover the requirement; it does not establish that the material, size, test portion or condition is acceptable.

Review preparation, report, urgent and delivery fees

Enter separately quoted preparation, report issuance, urgent processing, delivery and other confirmed charges.
Use zero when the laboratory has confirmed that a charge does not apply, and leave the field blank while it is unknown.
Do not add a fee again if it is already included in another quoted amount.
Additional sampling or special packaging can be entered under other fees; keep the original quotation so its scope remains traceable.

An urgent fee does not guarantee a completion date.
Sample supplementation, revised conditions and laboratory scheduling can affect delivery, so confirm the required report date separately.
This calculator does not model environmental-chamber ramping, holding, recovery, equipment occupancy or reservation time.

Worked example: KRW 265,000 base and KRW 420,000 with retest

These quantities and prices are fictional verification inputs, not a laboratory price list, a market average or a real test specification.
Model A has 5 available sample pieces.
ISO-X and ISO-Y are illustrative method labels only.

Base test order

Tensile testing costs 3 samples × 1 repetition × KRW 50,000 = KRW 150,000.
Bending costs 1 item × 1 repetition × KRW 80,000 = KRW 80,000.
Preparation KRW 20,000, report KRW 10,000 and delivery KRW 5,000, with urgent and other fees at zero, produce a base order of KRW 265,000.

Shared base samples and additional retest

The two base rows require 3 and 2 pieces independently, totalling 5.
Assume the laboratory approves a shared base total of 4: required 4, available 5, shortage 0.
A retest needs 3 additional pieces, giving a combined requirement of 7 and a shortage of 2.

The retest costs 3 × 1 × KRW 50,000 plus KRW 5,000 in additional fees, or KRW 155,000.
KRW 265,000 + KRW 155,000 = KRW 420,000 including retest.
No failure probability is assumed and no expected-value discount is applied.
Retest samples are additional independent requirements; unused or previously tested base samples are not automatically treated as reusable.

Blank fields, confirmed zero and known subtotals

A blank field is unconfirmed, while zero is a confirmed absence of that amount or quantity.
When a required price or billing quantity is missing, only calculable costs appear in the known subtotal and the final amount stays unconfirmed.
Do not use an incomplete subtotal as an accepted quotation.
Read the remaining questions about descriptions, repetitions, sample requirements and approval records alongside the amount.

Counts and amounts must be whole, non-negative numbers within the supported bounds.
Correct invalid or excessively large inputs before using the result.
Switching retest off preserves its inputs for editing but excludes them from the current base result.
When switching it on again, confirm its additional fees as well as its test rows before relying on the combined amount.

The worksheet supports up to 10 models and 50 test rows.
Repetitions range from 1 to 1,000, sample and billing counts from 0 to 1,000,000, and amounts from KRW 0 to KRW 1,000,000,000, all as whole numbers.
A separately payable per-sample test needs at least 1 billed sample per repetition.
Keep each model name, method, condition or approval description within 200 characters.

Practical purchasing scenarios

Combine requests from several departments

Collect quality and delivery requests into rows and review duplicate candidates.
Compare methods, conditions and repetitions with the laboratory before removing an item or recording approved inclusion.

Check the parcel before shipping samples

Use the model-level requirement, available count and shortage to decide whether additional pieces must be prepared.
Keep independent totals until laboratory approval supports a shared total, and separately verify sample size and usable test portions.

Approve a separate retest budget

Price only the actual additional retest items instead of automatically buying the entire original order again.
Present the base amount, incremental retest amount, combined total and additional sample shortage together in the purchasing decision.

Save, print and reconcile before submitting

  • Match model names, items, methods, conditions and repetitions to the laboratory application.
  • Confirm sample units, row totals, approved sharing and stock actually available for submission.
  • Record panel-inclusion approval and resolve duplicate candidates.
  • Reconcile the tax basis, additional fee scope and retest scope against the quotation.

The text download and printout retain the calculation worksheet and confirmation status for review.
If you loaded the fictional example, check its example label and replace it with actual quotations before ordering.
Closing the example restores the previous inputs and editing selection.
Completing a checklist does not itself constitute laboratory approval.

Frequently asked questions

Does the calculator contain standard laboratory prices?

No.
Enter current quotations from the laboratory.
The example prices are fictional and do not replace item-, method- or condition-specific quotations.

Are tests with identical names deducted automatically?

No.
Matching rows are flagged for review only.
Use a valid reference row and approval note to record inclusion after the laboratory confirms the same scope.

Does panel inclusion remove the sample requirement?

Price inclusion and sample sharing are separate.
Included rows retain sample requirements, while an approved shared base total is recorded independently.

How do I enter samples for two repetitions?

Billing multiplies by repetitions, but the sample field takes the total requirement across all repetitions once.
Use the actual total confirmed by the laboratory after reviewing sequence and reuse.

Can blank stock be treated as no shortage?

No.
Blank stock is unconfirmed and differs from a calculated zero shortage.
Enter the actual available submission count before relying on the shortage result.

Is the retest amount an expected loss?

No.
It is the incremental budget for the retest scenario you specify, without a probability or pass-rate prediction.
Its samples are not automatically shared with the base tests.

Does sufficient stock guarantee acceptance or a passing result?

No.
The result compares entered counts only.
Required mass, area, condition, method suitability, regulatory scope and test outcome need separate laboratory review.

Are currency conversion and tax added automatically?

No.
Use KRW amounts on a consistent tax basis.
Enter separately confirmed tax under other fees once if it is not already included.

Official guidance and review date

Official reception guidance was checked on 2026-11-25.
These Korean laboratory sources explain the process and what needs confirmation; they do not establish the fictional prices or a universal sharing rule.
Reconfirm the current quotation and laboratory response for every order, and review source links at least every six months.

Complete the worksheet for your laboratory

Start with a model and its test rows, then resolve the unconfirmed fields beside the known subtotal.
Review the base and retest budgets together with each model’s requirement and shortage.
Save the worksheet and reconcile it with the laboratory application before proceeding to reception.