Injection Molding Lot Cost Calculator

Check shots, resin, tooling allocation and payment using confirmed process data. All prices are in KRW.

1. Delivery target

1 – 1,000,000 · integer

1 – 1,000 · integer

Each lot repeats the same quantity, process and rates. Blank means unconfirmed; zero means confirmed no cost or reuse.

2. Supplier-confirmed process

1 – 128 · integer

> 0 – 100

0 – 1,000,000 · integer

> 0 – 86,400

Count cavities actually producing this same part. Setup shots produce no good parts but consume time and resin.

3. Resin and runner mass

> 0 – 1,000,000

0 – 1,000,000

0 – 1,000,000

0 – 100

Do not add runner weight to total shot weight again. Enter only confirmed runner mass available in time for this lot. Deduct once within production-runner and blend caps; setup runner and rejected-part reuse are excluded.

4. Actual quoted rates

0 – 100,000,000

0 – 100,000,000

0 – 100,000,000

0 – 1,000,000,000

0 – 1,000,000,000

Use a consistent KRW and tax basis. Do not duplicate setup or inspection already included in the machine rate. Include grinding, transport and other quoted fees under maintenance and other fees.

5. Tooling, payment and remaining life

0 – 1,000,000,000

0 – 1,000,000,000

0 – 1,000,000,000 · integer

Total tooling cost is allocated evenly across the repeat lots. Enter the actual payment due now separately. Blank remaining life leaves production feasibility within tool life unconfirmed.

Alternative A · Lot result

Start with target good parts, then enter cavities, yield, setup shots and cycle time to see the required shots and time.

Next input: Target good parts (pieces/lot)

Confirm with the supplier before ordering

Start injection molding lot cost with the good parts you need

This injection molding shot, yield, tooling and lot cost calculator organizes confirmed process data around a target number of accepted parts.
Small manufacturers and outsourcing buyers can align the molding process sheet, tooling quote, and inspection and packing costs before placing an order.
Choosing a mold from cavity count alone, or multiplying finished-part mass by order quantity, can omit setup rejects, runners, and tooling expenditure.

Enter target good parts first, then confirmed yield and effective cavities.
Read required shots, machine hours, and new resin kilograms before comparing allocated lot cost with the payment needed this time.
Every price comes from your own quote; the worked example is fictional and is neither a market average nor a recommended process setting.
All monetary inputs and outputs remain in KRW in this English experience.

The decision this supports

Send the shot, mass and cost worksheet to the toolmaker and molder to confirm the initial quantity, payment terms, recoverable runner material, maintenance scope, and remaining mold life.
This calculator does not select clamp force or injection pressure, approve moldability or quality, or predict mold life.
Unconfirmed process settings must not become a firm supplier quotation simply because they produce a number here.

Prepare the order plan, process sheet, and actual quote

  1. Delivery plan: prepare target good parts per lot and the number of identical lots you expect to order.
    The lot count changes tooling allocation and cumulative shots.
  2. Confirmed process: obtain effective cavities for this product, production yield, setup reject shots, and cycle seconds per shot.
    Blocked cavities and unused shapes do not count as productive cavities.
  3. Mass and reuse evidence: confirm total shot mass including the runner, runner mass within that shot, usable runner kilograms for this lot, and the permitted blend percentage.
    Keep grams and kilograms distinct.
  4. Quote and contract: separate resin, machine and inspection/packing rates, setup charges, maintenance/other charges, total tooling cost, and the tooling payment due now.
    Enter confirmed remaining shots available for this order rather than a new mold's nominal lifetime.

The first field is target good parts, measured in pieces per lot.
For a comparison, keep the common target and repeat count and fill alternative B with its own confirmed cavity, cycle, mass and tooling conditions.
Known physical results can appear before every price is available, so an unknown price does not need to be replaced with an invented zero.

Understand yield, effective cavities, and setup shots

Yield is the accepted share of production parts

Dividing target good parts by yield produces the required production target before cavity rounding.
Lower yield increases shots and material.
Yield must be greater than zero and no more than 100%; retain the supplier's value and the conditions under which it was confirmed.

Cavities are actual output per shot for one product

Count effective cavities producing the same item.
Do not count every shape in a family mold as output of one product.
The last complete shot may create extra expected good parts, but the cost denominator stays at target good parts.

Setup shots are initial rejected adjustment shots added separately from production yield.
If a supplied yield already includes startup rejects, adding the same rejects again would double count the loss; reconcile that definition with the molder.
Machine time includes the cycles of setup shots.
Mold changes, waiting, and commissioning time outside those cycles are not automatically added: include confirmed separate charges in setup or maintenance/other costs and check for duplicate charging.

Calculate production shots and machine hours

Production target I = ceil(target good parts Q / (yield y / 100))
Production shots P = ceil(I / effective cavities c)
Total shots S = P + setup shots s
Machine hours H = S × cycle seconds t / 3600
Expected good parts = P × c × y / 100

Rounding up occurs at the production target and again at the shot count.
A fractional final shot is not produced, so the last cycle is a complete shot.
Expected good parts are an average-yield calculation, not a guarantee of actual accepted output.
Actual inspection could require more production; this worksheet does not invent that additional run.

Cycle input is in seconds, while the result is in hours.
Machine hours are different from a calendar delivery lead time.
Material supply, mold revisions, inspection queues, weekends and shift arrangements require a separate schedule; the calculated hours do not establish a promised shipment date.

Include the runner in shot mass and credit reuse only once

Gross input G = total shots S × total shot mass g / 1000 kg
Production runner ceiling W = production shots P × runner mass r / 1000 kg
Applied reuse E = min(confirmed usable R, W, G × blend limit b / 100)
New resin V = G − E

Total shot mass already includes both molded parts and runner material.
Adding runner mass again overstates material cost, as does adding a yield allowance that is already counted elsewhere.
Assuming every runner can be recycled can instead understate purchases.
The reuse credit must satisfy both the confirmed usable quantity and the material/product blend limit.

This model excludes setup runners and rejected parts from its recoverable ceiling.
Even production runners must be available after grinding, drying and inspection early enough to be used in this same lot.
Material usable only after the lot ends must not reduce this lot's new-resin requirement.
The formula subtracts the applicable quantity once; it does not repeatedly recycle the same material or create infinite regrind savings.

New resin kilograms are a mass calculation without bag-size rounding or supplier minimum orders.
Grinding, drying, freight, disposal and initial advance-purchase cash are not calculated automatically.
Enter confirmed extra charges in maintenance/other costs and reconcile purchase packs and payment timing separately with the supplier.

Separate allocated cost from the payment due this time

Lot operating cost O = new resin V × resin price p + hours H × machine rate h
+ target good parts Q × inspection/packing rate u + setup f + maintenance/other m
Allocated lot cost C = O + total tooling T / repeated lots N
Cost per good part = C / target good parts Q
Payment cash = O + tooling payment due now D
Total cost across N lots = N × O + T

Tooling allocation divides total tooling cost across your planned identical lots to compare cost per lot.
It does not alter contractual payment dates or lower the deposit you owe.
A large total tooling price may have a smaller installment due now; a low allocated unit cost can still require substantial first-order cash.
Read both measures when choosing tooling.

Payment cash assumes the full entered operating cost plus the tooling payment due this time.
It is not a complete financial cash-flow model of deferred operating invoices, resin already held in stock, or advance purchasing dates.
If repeat orders never occur, the planned allocation is no longer appropriate: distinguish committed orders from forecasts and revise the calculation.

Calculations retain unrounded monetary values; displayed totals are rounded to whole KRW and unit cost to two decimal places.
Use a consistent scope across every quote.
Enter omitted tax, freight, additional inspection or other confirmed charges yourself; no statutory rate or legal minimum charge is added automatically.

Worked example: 1,000 good parts per lot across 10 lots

Both alternatives target 1,000 good parts in each of 10 repeated lots.
Both use 100% yield, 10 setup shots, a 36-second cycle and 10 g of runner per shot, with zero reusable runner and a zero blend limit.
Resin costs KRW 4,000/kg, machine time KRW 60,000/hour, inspection/packing KRW 100 per target good part, and setup KRW 20,000 per lot; maintenance/other costs are zero.
Each mold has a fictional confirmed remaining life of 10,000 shots.
These are worked arithmetic inputs, not current market quotes.

Alternative molding shots, material, cost allocation and cash under the same target and lot count
MeasureAlternative AAlternative B
Effective cavities / production yield2 / 100%4 / 100%
Total shot mass, including runner50 g/shot90 g/shot
Production / setup / total shots500 / 10 / 510250 / 10 / 260
Machine time5.1 hours2.6 hours
New resin requirement25.5 kg23.4 kg
Material costKRW 102,000KRW 93,600
Machine costKRW 306,000KRW 156,000
Inspection and packing / setupKRW 100,000 / 20,000KRW 100,000 / 20,000
Lot operating costKRW 528,000KRW 369,600
Total tooling / allocation across 10 lotsKRW 1,000,000 / 100,000KRW 2,000,000 / 200,000
Lot cost with tooling allocationKRW 628,000KRW 569,600
Cost per target good partKRW 628.00KRW 569.60
Tooling payment due this timeKRW 500,000KRW 1,000,000
Payment cash for this lotKRW 1,028,000KRW 1,369,600
Total cost across 10 lotsKRW 6,280,000KRW 5,696,000

Alternative B needs fewer shots and machine hours for the same target, reducing operating cost and allocated unit cost.
Its larger tooling installment nevertheless makes payment cash higher than alternative A.
A lower cost per part does not establish that the initial budget is sufficient: compare the actual payment terms with available funds.

Tooling break-even and confirmed remaining life

When a higher-tooling-cost alternative has lower operating cost per identical lot, repeated production can recover its additional fixed tooling cost.
In the example, B requires KRW 1,000,000 more tooling and saves KRW 158,400 per lot.
Dividing and rounding up gives 7 lots and 7,000 target good parts as the first repeat unit at which B is equal or cheaper.

Check the lot before and the lot at the crossover

At 6 lots, total cost is KRW 4,168,000 for A and KRW 4,217,600 for B.
At 7 lots, A costs KRW 4,696,000 and B costs KRW 4,587,200.
Reaching that point needs 3,570 cumulative shots for A and 1,820 for B, both within the assumed confirmed 10,000-shot remaining life.

This quantity applies only to repeating the same-sized lot under unchanged process and price conditions.
It does not model fewer setups, quantity discounts, cavity changes or reuse-limit changes associated with one larger order.
If an alternative has both lower tooling and lower operating cost, a reversal is unnecessary; equal costs and the absence of operating savings are also distinct outcomes.

A candidate is not treated as reachable within life if either mold requires more cumulative shots than its confirmed remaining allowance.
Blank life leaves a mathematical candidate unverified.
A supplier must separately confirm extension after maintenance or replacement tooling cost; the calculator does not automatically replace molds until a crossover appears.

Use sensitivity for yield and target quantity

Yield falls by 1 percentage point

The sensitivity case reruns alternative A with yield reduced by 1 percentage point using the same formulas.
A resulting yield of zero or less is omitted.
Unit cost is compared only when prices are complete; discuss extra shots and resin with the molder against its actual process controls.

Target good parts double

Within the input limit, the model doubles the target per lot while retaining the number of repeated lots and other conditions.
Fixed setup cost per part can fall, but payment terms and quantity discounts do not change automatically.
Review increased cumulative shots and remaining life again.

Use these cases to separate an initial small order from a repeat-order plan, discuss additional investment in cavities, and identify omitted charges when runner reuse conditions change.
Sensitivity assumes unchanged inputs other than the named change.
If yield changes also affect cycle time or sorting cost, edit those fields and calculate a new confirmed scenario.

Enter, review, save, and confirm with the supplier

  1. Enter target good parts and repeated lots, then A's yield, cavities, setup shots and cycle to check shots and hours.
  2. Add mass and reuse conditions to check new resin, then enter actual quoted rates and fixed charges.
  3. Separate total tooling cost from the payment due now and enter confirmed remaining life.
    Add B on the same quote basis to compare costs and crossover candidates.
  4. Review the confirmation checklist and preserve conditions and results as TXT or print.
    Record the document date, drawing revision and person confirming reuse with the supplier.

The fictional example demonstrates the formulas and form flow.
Opening it preserves your earlier inputs, selected alternative and confirmation checklist; restoring your inputs returns to that state.
Switching alternative tabs retains each alternative's entries.
On a phone, go to results, return to editing, change a price and review the updated values.

Blank does not mean free

A missing required value identifies the next item to confirm and leaves the full cost pending.
Enter zero explicitly when no additional charge or no reuse has been confirmed.
Input ceilings are software calculation limits, not industry standards or safe operating limits.

Frequently asked questions

Can I divide the order quantity by the cavity count?

That only approaches the answer when yield is 100% and there are no setup rejects.
This model rounds up the production target after allowing for yield, rounds up the production shots after dividing by effective cavities, and then adds setup shots.
Expected surplus good parts are neither guaranteed deliveries nor assumed sales.

Should I add runner mass to shot mass again?

No.
Shot mass is the total material injected per shot, including the runner.
Runner mass identifies the recoverable portion already inside that total.
Ask for a separately confirmed total shot mass when a different cavity or runner arrangement is proposed.

Are setup runners and rejected parts recycled automatically?

No.
The recoverable ceiling uses production-shot runners only, excluding setup runners and rejected parts.
The applied amount is the smallest of confirmed usable runner kilograms, production runner mass, and the permitted blend ceiling.
It is subtracted once, with no repeated regrind or infinite circulation credit.

Does allocating tooling reduce the amount I have to pay now?

Allocation spreads total tooling cost across the planned identical lots for cost comparison.
The tooling payment due this time is a separate input.
Payment cash adds that payment to the lot operating cost, so deposits and final installments must still be reconciled with the actual contract.

Can I use 100% when yield is unknown?

An assumed perfect yield removes the extra shots and resin needed for rejects.
Leave yield unconfirmed until the supplier provides a suitable value, and use the known partial results in the meantime.
Even a confirmed expected yield does not guarantee a specific accepted quantity or quality approval.

What orders does the tooling break-even quantity describe?

It applies to repeated lots of the same target quantity under unchanged process and cost conditions.
The tooling cost difference is divided by the operating saving per lot and rounded up to whole lots, then multiplied by target good parts per lot.
It is not an optimum single large order quantity or a quantity-discount model.

What happens when remaining mold life is blank or insufficient?

Prices can still produce a mathematical cost and break-even candidate, but blank life leaves feasibility unconfirmed.
If either mold needs more cumulative shots to reach the candidate than its confirmed remaining life allows, the candidate is not treated as reachable within life.
Replacement tooling and life extension after maintenance are not invented.

How are blanks different from zero, and can I save my work?

A blank is unconfirmed; zero is a confirmed absence of that cost or reuse.
Missing required prices leave the total pending while known shot and time results remain available.
Save the conditions and results as TXT or print them.
Closing the fictional example restores the earlier inputs, selected alternative, and confirmation checklist.

Primary sources and conditions to recheck

Sources were checked on 2026-11-28.
Supplier documentation supports the discussion of tooling options, multi-cavity production and individual quotation structure; it does not establish a guaranteed yield, regrind allowance or mold life for your project.
The formulas are the explicit quantity, mass and cost arithmetic model published above.

Recheck links at least every six months and reconfirm drawing, resin, mass, yield, recovery timing, permitted reuse, payment terms, remaining life and maintenance scope for every quotation.
Country-specific tax rates and legal tariffs are not added automatically; both language versions use the same process formulas and KRW prices.

Align shots, resin, and tooling payments before ordering

Prepare the confirmed process sheet and actual quote, then start with target good parts.
Save the cost worksheet and confirmation checklist and discuss the initial quantity and payment terms with the supplier.