Industrial Dehumidifier Fleet & Budget Calculator

Use confirmed moisture loads and same-condition removal rates to check fleet size, condensate, drainage and a rental budget in KRW.

1. Fleet and sequential conditions

1 – 1,000 · integer

Reuse this fleet across sequential stages. Condensing units only: enter supplier-confirmed loads and removal rates.

0.000001 – 3,650

0 – 1,000,000

0 – 1,000,000

0.000001 – 100,000

0.000001 – 24

Initial water ÷ days is added to ongoing load. Account for defrost, stoppages and emptying once across hours/rate. Do not double-count water across stages.

Energy calculation method

0 – 100

0 – 10,000

Maximum power is a separate all-available-hours bound, never added to mean energy.

2. Actual drainage plan

0.000001 – 1,000,000

0.000001 – 1,000

Uses peak simultaneous flow into one shared tank or drain. Do not pool separate tanks. Hoses, pumps, head and unattended operation require a site check.

3. Rental terms and prices

Use final tax-inclusive quotes on the same basis. Enter confirmed 0 for included/free items; leave unknowns blank. Include quoted base electricity charges, deposits or extra work in one-off cash as needed.

0 – 100,000,000

0 – 3,650 · integer

0 – 1,000,000

0 – 1,000,000

0 – 1,000,000,000

Fleet requirement and shortfall

Largest theoretical minimum across sequential stages

Unconfirmed units

Next to confirm: Stage 1 · Selected fleet (units)

Stage 1

Unconfirmed: Selected fleet (units) · Stage duration (days) · Ongoing moisture load (L/day) · Initial water to remove (L) · Confirmed removal (L/24h/unit) · Available removal time (h/day) · Confirm moisture load and performance at the same conditions

Processed water and operating budget

Unconfirmed

Known cost subtotal: Unconfirmed

Billed calendar days
Unconfirmed days
Total condensate / energy
Unconfirmed L / Unconfirmed kWh
Rental
Unconfirmed
Electricity
Unconfirmed
Water handling
Unconfirmed
One-off cost
Unconfirmed

Sequential durations are added, rounded up once, then checked against minimum billed days. Unknown costs are not zero. Backlogs are not carried to later stages.

Confirm with the supplier

Related calculators

Size industrial dehumidifier use around confirmed site conditions

The industrial dehumidifier minimum-unit, condensate, and operating budget calculator aligns a confirmed moisture quantity with equipment performance at the same conditions.
Warehouse, basement shop, and workshop operators can organize unit count, processable water, drainage arrangements, and rental expenditure in one worksheet.
A high catalog rating does not establish the removal rate at a colder or less humid site.

Start with a qualified supplier's confirmed moisture load rather than floor area.
The result is an arithmetic lower bound for the entered conditions; it does not guarantee a target relative humidity, a drying completion date, or safe unattended operation.
When water quantities or performance change, create a separate confirmed stage and review the plan again.

The decision this supports

Check whether the selected fleet can meet each stage's daily quantity, then discuss more units or a different schedule wherever it cannot.
Separating processing electricity and condensate from contractual billing days helps reveal costs missing from the equipment rental price alone.
All money remains in KRW, including this English experience.

Prepare three sets of evidence before entering numbers

  1. Confirmed water balance: obtain initial removal in L, new ongoing load in L/day, and the processing duration assigned to those quantities.
  2. Matching equipment performance: confirm the installed model, supply frequency, temperature and humidity, average L/24h per unit, and either SEC or average power while operating.
  3. Drainage and an actual quote: prepare common-tank usable volume and emptying intervals or a confirmed continuous drain rate, plus rental, minimum days, delivery, electricity, and water-handling prices.

The first field is the selected unit count, shared by equipment reused through sequential stages.
Record the condition, document reference, and verification date in the stage name or performance notes.
If a source uses kg, ask the supplier for the confirmed liquid-equivalent L; the calculator does not automatically convert mass into volume.

Separate initial removal from the ongoing moisture load

Initial quantity M

This is the confirmed liquid-equivalent water already present and assigned to the stage.
Spread over D days, its daily allocation is M/D.
The calculator neither estimates total moisture stored in the building nor assumes that all water entering it can be removed.

Ongoing load W

This is new moisture from air exchange, access, products, or processes, expressed in L/day.
Counting the same water again in initial removal exaggerates the required fleet.
Check that initial quantities in later stages do not repeat water already assigned elsewhere.

Daily required removal is L = W + M/D.
Required water over the stage is M + W × D.
For initial removal of 100 L over 2.5 days and ongoing load of 40 L/day, the initial allocation is 40 L/day and the total requirement is 80 L/day.
A longer duration lowers the daily initial allocation but may increase both ongoing water over the period and rental days.

Use separate performance points when conditions change

Removal rate and energy use change with temperature and relative humidity, even for the same industrial dehumidifier.
Enter the confirmed average rate R in L/24h per unit and record that the relevant performance has been checked.
Sharing a model name or a daily rating unit does not make two test conditions interchangeable.

An official example of the difference

Dantherm's DH20 table lists 18.4 L/24h and SEC 0.66 kWh/L at 30°C and 60% RH, compared with 12.6 L/24h and SEC 0.82 kWh/L at 20°C and 60% RH.
The listed supply is 230 V, single phase, 50 Hz.
These overseas product figures illustrate condition dependence; they are neither defaults for equipment installed in Korea nor a product recommendation.

The calculator does not interpolate between performance points or apply a universal temperature and humidity multiplier.
Split changing work into up to four sequential stages, each with its own confirmed load and performance.
Align the time basis with the supplier: if a reported average already includes downtime, do not subtract that same downtime again through available operating hours.

Read the theoretical minimum and the selected fleet's deficit

Daily water balance

Hourly removal per unit r = R / 24
Daily capacity per unit = r × h
Theoretical minimum units = ceil(L / (r × h))
Selected daily capacity C = N × r × h
Daily unprocessed load = max(0, L − C)

Available hours h are hours actually available for removal on each day.
Include access restrictions, defrost, emptying, or inspection interruptions consistently with the removal-rate basis.
Hours must be above zero and no greater than 24; duration and removal rate must also be positive.
The minimum does not automatically add spare machines, distribution requirements, failure allowance, or electrical circuit constraints.

Because the same fleet is reused in sequential stages, the overall lower bound is the largest stage minimum rather than their sum.
When the confirmed load is zero throughout, theoretical demand can be zero units.
That does not remove rental charges for equipment the user has selected and contracted.

Unit-hours are different from elapsed calendar time

Required unit-hours equal the period's required water divided by the hourly rate of one unit.
Two units each operating for ten hours provide 20 unit·h; that does not mean twenty hours must elapse on the calendar.
Read hours needed for the full requirement separately from hours processing the water that the selected fleet can actually handle.

Water within selected capacity

Period condensate = min(L, C) × D
Processing unit-hours = period condensate / r
Daily hours per unit = period condensate / (D × r × N)

Water still left unprocessed

Period unprocessed water is required water minus processed water.
It is not automatically carried into the next stage and the schedule is not automatically extended.
Revise the plan after confirming additional units or the performance applicable to extra days.

Initial water is allocated evenly over the stage, so the model does not predict a changing drying curve.
A daily average does not establish that a sharp hourly moisture peak has been addressed.
Use field measurements and the specialist's monitoring plan to refine stage boundaries and durations.

Calculate electricity using SEC or average operating power

When SEC is confirmed

Processing electricity = actual processed L × SEC in kWh/L.
Use a value matching the temperature, humidity, and operating conditions rather than the lowest value found at another rating point.

When average power is confirmed

Processing electricity = processing unit-hours × average operating kW per unit.
Confirm the measurement basis and distinguish power while operating from maximum nameplate input.

Only the selected method contributes to the stage's operating budget.
An optional maximum-input value produces the separate full-hours scenario N × Pmax × h × D; it is not added to average processing electricity.
If average power, including power implied by SEC, exceeds maximum input, the upper scenario is held for an inconsistent input check.

Standing electricity charges, a higher contracted supply, time-of-use prices, and auxiliary equipment are not estimated automatically.
Confirm any additional costs and their scope with the supplier and electricity bill.
Calculations retain unrounded intermediate values and round KRW displays to whole won, so individually rounded rows can differ slightly from the final rounded total.

Condensate follows processed water, not maximum rating alone

Adding all daily equipment ratings can overstate condensate when the moisture load is lower.
Period condensate here equals the smaller of daily demand and selected capacity, multiplied by duration.
Insufficient units also produce less collected water, but leave moisture unprocessed; lower water-handling cost does not establish better efficiency.

A common tank and actual emptying arrangements

Maximum simultaneous condensate flow is N × r, and common-tank fill time is usable volume V / (N × r).
The fictional two-unit example has a maximum 10 L/h, making a 100 L common tank equivalent to ten continuous operating hours.
An eight-hour emptying interval fits this arithmetic comparison; it does not guarantee against overflow or failure, or establish safe unattended operation.

Use usable volume rather than the nominal outside size of the tank.
Adding independent built-in tanks as though they were one shared reservoir can conceal a tank filling before the others.
A stage with a confirmed zero load produces no water and has no tank fill-time result.

Continuous drainage compares a confirmed L/h handling rate with maximum simultaneous flow.
Hose falls, blockage, pump head, permitted discharge, power interruptions, and actual inspection arrangements require separate site checks.
Address an unknown or insufficient drainage plan before confirming available hours and costs.

Separate billed rental days from processing costs

One contract with sequential equipment use

Billed days = max(ceil(sum of stage days), minimum contract days)
Rental = selected units × billed days × daily price per unit
Electricity cost = sum of processing kWh × KRW/kWh
Water handling = sum of condensate L × KRW/L
Budget for entered scope = rental + electricity + water handling + one-off cost

For two stages of 1.2 days each, first add them to 2.4 days and then round up to three days.
Do not round each stage to two days and sum them to four.
Billing-day rounding corrects tiny floating-point noise, so 0.1 + 1.3 + 2.2 + 0.4 days is treated as four days.
Gaps between stages, different return dates per unit, or weekly price blocks require the supplier's actual billing terms rather than an unsupported interpretation of this single-contract model.

Use final tax-inclusive KRW prices on a consistent basis.
Combine delivery, setup, and collection in the one-off amount, checking whether the quote is per unit or for the whole fleet.
The example amounts are fictional calculation inputs, not Korean standard prices or market averages.
No statutory VAT rate or electricity tariff is supplied automatically.

Worked example: two units at KRW 309,000 versus an incomplete one-unit plan

Assume 2.5 days, ongoing load 40 L/day, initial water 100 L, removal 120 L/24h per unit, twelve available hours per day, and SEC 0.5 kWh/L.
The fictional quote uses KRW 30,000 per unit-day, a four-day minimum, KRW 150/kWh, KRW 20/L for water handling, and KRW 50,000 one-off cost.
These are test assumptions rather than a product or price recommendation.

Fictional processing and KRW budget comparison using two units and one unit for the same water requirement
MeasureTwo selected unitsOne selected unit
Daily required removal80 L/day80 L/day
Selected daily capacity120 L/day60 L/day
Theoretical minimum2 units2 units
Daily unprocessed load0 L/day20 L/day
Period condensate / unprocessed200 L / 0 L150 L / 50 L
Processing unit-hours40 unit·h30 unit·h
Processing electricity100 kWh75 kWh
Billed rental days4 days4 days
RentalKRW 240,000KRW 120,000
ElectricityKRW 15,000KRW 11,250
Water handlingKRW 4,000KRW 3,000
One-off delivery, setup, collectionKRW 50,000KRW 50,000
Budget for entered scopeKRW 309,000KRW 184,250 · incomplete

Two units supply the required 40 unit·h, with each operating eight hours per day, producing 200 L condensate and using 100 kWh.
Average operating power of 2.5 kW gives the same 40 × 2.5 = 100 kWh.
With separately confirmed maximum input of 3 kW, the full-hours upper scenario is 2 × 3 × 12 × 2.5 = 180 kWh; do not add it to the 100 kWh processing budget.

The one-unit KRW 184,250 result is a partial budget with 50 L unprocessed.
Being below the two-unit KRW 309,000 result does not make it a cheaper completion plan.
Agree on more equipment or another schedule and recalculate with its confirmed conditions.

Distinguish blanks, confirmed zero, and a capacity warning

A blank means the value has not been established; it is different from confirmed zero.
Enter zero for a verified absence of ongoing load or an additional water-handling charge, but do not fill unknown items with zero to lower the budget.
Known cost components remain visible as a subtotal while the complete total is held for missing information.

States that do not establish a completion budget

Unconfirmed loads or performance, too few selected units, and unknown or insufficient drainage are separate issues.
An arithmetic result for processable water does not resolve remaining moisture or site constraints.
Checking an input assumption is also different from confirming that the work has actually been performed.

Zero duration, zero removal rate, zero available hours, negative values, and out-of-range values cannot support the calculation.
Positive duration, removal rate, available hours, tank volume, and emptying interval are supported from a minimum of 0.000001.
A derived minimum-unit count beyond safe integer precision, or a cost beyond supported whole-KRW precision, is explicitly withheld.
The selected fleet is an integer from 1 to 1,000 units and the plan supports one to four sequential stages.
The theoretical calculation rounds a fractional requirement upward, but a user cannot select half of a physical machine.

Follow the plan from data entry to supplier confirmation

  1. Enter the fleet under consideration and the first stage's water quantities, duration, and available hours.
    Resolve the boundary between initial and ongoing water first.
  2. Confirm matching performance evidence and enter removal rate plus the selected electricity method.
    Add another sequential stage when conditions change.
  3. Enter the genuine common-tank or continuous-drain plan and compare it with simultaneous flow.
    Do not pool independent tanks on paper.
  4. Enter actual prices with consistent tax treatment and minimum rental days, then read daily and period unprocessed water before the money.
    Keep an incomplete plan's cost separate from a completion budget.
  5. Review performance, drainage, and contract checks, then save TXT or print the worksheet for the supplier.
    Update the same record when a revised performance statement or quote arrives.

Use the fictional example to understand the form and verify the arithmetic.
Returning to your inputs restores the entries and selected stage that were saved before the example opened.
Editing an example does not turn it into actual measurement evidence, so check its fictional label before returning to record site data.

Useful planning situations and the model's limits

Review changing operating conditions

Separate initial high-moisture work from later maintenance operation when their confirmed performance differs.
Compare stage minimums and add their processed water, while recognizing that parallel sites or mixed equipment models require a separate engineered allocation.

Discuss rental and drainage arrangements

When daily access is short or emptying visits are infrequent, inspect the deficit and tank fill-time comparison first.
Use them to ask the supplier about fleet size, drainage equipment, and schedule changes without treating arithmetic as a safety approval.

This tool does not design a psychrometric load, estimate stored building moisture, determine drying completion, or select a target RH.
Air circulation, inlet and outlet placement, room distribution, product moisture release, leaks, mold, hygiene, and electrical or drainage safety remain outside its results.
Check the manufacturer's distinction between condensing and industrial desiccant technology and seek review for the actual installed model.

Frequently asked questions

Can floor area determine the number of dehumidifiers?

Area alone does not establish moisture from air exchange, open doors, stock, surfaces, or the required indoor conditions; ask a qualified supplier to confirm the ongoing load and initial removal quantity before entering them.

Can I enter the largest L/day figure in the catalog?

Use the confirmed average rate for the installed model at the same temperature, humidity, power supply, and operating conditions; this calculator supplies no universal correction factor for a different rating point.

What if initial water and ongoing load include the same moisture?

Initial water is the assigned quantity already present at the start of a stage, while ongoing load is new moisture entering or arising during it, so confirm that neither input nor multiple stages count the same quantity twice.

Does a budget with too few units cover completion?

When capacity is insufficient, the displayed cost covers only the quantity the selected fleet can process; additional equipment, extended rental, repeat visits, and a completion date require a revised confirmed plan.

Does the condensate model apply to desiccant equipment?

The liquid collection model is for condensing dehumidifiers; do not apply its condensate or tank results to industrial desiccant systems that discharge moisture through regeneration air.

Can I add up separate built-in tank capacities?

Enter only a genuine common tank receiving the combined flow; separate tanks must each be reviewed against their own unit rate, usable volume, and inspection or emptying interval.

How do I distinguish free items from unknown prices?

Enter zero when no additional charge has been confirmed and leave an unknown price blank; the calculator separates the known cost subtotal from a total budget that is still awaiting information.

Can I return from the example and save the result?

Returning to your inputs restores the entries and selected stage saved before opening the fictional example, while TXT and print output help preserve conditions, water balance, drainage checks, and quote assumptions for supplier review.

Sources and verification basis

Official source access was checked on 2026-11-25.
The sources support condition-dependent product performance and the distinction between technologies; overseas ratings are not treated as Korean legal standards or installed-equipment defaults.
Recheck performance and actual prices when the contract, model, power supply, or operating conditions change, and inspect source links at least every six months.

The water balance, rounding, electricity, and budget equations are this calculator's model built from those units and user-confirmed quantities.
They do not mean that a manufacturer has approved a particular site's completion fleet or contract price.
The current project reference year is 2026, and no future price or statutory rate is assumed.

Send the condition, water, and drainage worksheet to your supplier

Before saving, check stage performance, repeated initial or ongoing water, simultaneous drain flow, actual minimum billing days, and tax-inclusive scope.
Explain the required units and water left unprocessed first, then request matching performance evidence and a revised quote.
Enter actual evidence in the calculator above to organize the confirmed minimum-unit, condensate, and operating budget scope.