Local Exhaust Duct & Service Quote Calculator

Compare initial cash, 12-month running costs and missing work from confirmed designs and actual KRW quotes.

Work included in the package

Included and not-applicable items add nothing. Unconfirmed items hold the final total.

Shared period and design confirmation

This tool does not assess design, performance, explosion protection, safety or permits. It compares alternative quotes for one system; it does not add them together.

Confirming your quotes

Enter the package amount and confirm the work included. Known subtotals appear as you go.

Before requesting a revised quote

Costs use your actual quotes and assumptions. Base/demand charges, compressed air and downtime are separate unless entered. Confirm design, capture velocity, cleaning performance and legal compliance with a professional.

Related calculators

Compare local exhaust quotes from equipment price to first-year cash

The Local Exhaust Duct, Filter and Service Quote Calculator organizes actual quotes for a new installation or modification whose professional design has already been established.
It helps workshop owners and facility managers include hoods, ducts, fans, air cleaning, electrical work, installation, and commissioning before comparing the initial payment with the following twelve months of operating costs.
A low equipment price can still require substantial additional site work.

Enter up to four alternatives for the same exhaust system.
The alternatives are compared rather than added together as a multi-site installation ledger.
Align the design and project boundary first, then use the unresolved-item list to request revised supplier quotes.
Both interfaces use Korean won (KRW), without market-price feeds or currency conversion.

Bring the underlying evidence

Prepare the confirmed design, package inclusions, quantities and unit prices for additional work, measured power data, operating plan, filter and service quotes, and validity dates.
Keep the quote reference and design revision with your own records so different versions do not become mixed in the comparison.

Match the package and eight installation scopes

Start with the package quote amount.
Establish whether it covers only equipment or also hoods, fans, initial filters, and installation before classifying subsequent work.
In the common conditions, confirm that the professional design and comparison scope have been established and enter the first month of the twelve-month budget.
The calculator cannot confirm an unresolved design for you.

Equipment and exhaust components

Confirm hoods, ductwork, fans, and air cleaning or initial filters separately.
Identical product labels do not establish identical design quantities or specifications.
Keep initial fitted filters within installation and later planned changeouts within operation, avoiding a second charge for the initial set.

Site work

Check electrical work, installation and access, commissioning, and removal or disposal.
Ask whether access equipment, penetrations, delivery, and protection are included in the installation quote.
Add discovered extras to the appropriate confirmed scope amount without repeating the same work under several headings.

Separate ductwork is entered in metres (m); the other work uses whole work packages or lots.
If one lot includes multiple components, enter the supplier-confirmed package amount.
Distinguish a per-metre rate from a whole-ductwork quote so length is not multiplied into the price twice.

Included, separate, not applicable, and unknown have different meanings

Included and separate work

Included work is already covered by the package and adds zero again.
Previously entered quantity and price values are ignored while the item is included.
Separate work adds the confirmed quantity multiplied by its unit price.

Confirmed exclusion and unresolved work

Not applicable means that no additional expenditure is confirmed for this project.
Unknown means necessity, package coverage, or price has not yet been established.
Do not convert a blank or unknown field into a free item merely to produce a lower total.

A confirmed installation subtotal remains useful while other inputs are incomplete, but it is distinct from a complete quote.
If ductwork is confirmed and commissioning remains unknown, the known amount is preserved while commissioning stays on the follow-up list.
Request written confirmation of coverage before changing a status so the reason for any change in the total remains clear.

Normalize taxes and quote validity

Select tax included, tax excluded, or unknown for each quote.
For an excluded-tax quote, enter the percentage confirmed in the contract; a confirmed 0% is accepted.
No general VAT rate is automatically applied to every entry.
Installation, filter changeouts, and maintenance amounts within one quote must use the same tax basis.
Ask the supplier for consistent amounts if only some original prices include tax.

An unresolved tax basis is not a completed cash amount

The entered installation subtotal can be shown before taxes are confirmed, but it is not labeled as tax-confirmed initial cash.
Electricity uses its own tax-inclusive rate and never receives the quote tax percentage again.
The calculator does not determine exemptions, zero-rating, input-tax deductions, or actual refunds.

Record the effective and valid-until dates and ensure they cover the budget start date.
A quote outside that window holds the first-year comparison until its terms are revised.
Starting within the validity window does not itself guarantee future maintenance prices, so check any price-lock terms separately.
This date check does not determine contract formation or legal validity.

Use confirmed electrical input and operating hours

Power means average electrical input in kW under the planned operating conditions.
Motor nameplate shaft output alone may omit efficiency, loading, or variable-speed conditions.
Check whether controls and auxiliary equipment are already covered by the measurement so their input is not added a second time.

Electricity formulas and units

Annual energy, kWh = confirmed input, kW × total operating hours, h, over twelve months
Annual electricity cost = annual kWh × tax-inclusive variable rate, KRW/kWh

Reflect shifts, closures, and shutdowns in total operating hours, which cannot exceed the actual calendar hours in the twelve-month window.
Use a confirmed variable electricity rate from the bill or contract.
Base charges, demand, power factor, time-of-use tariffs, compressed air, and HVAC are not modeled independently; retain excluded costs in a separate budget.
Distinguish kW from kWh to avoid multiplying already measured energy by hours again.

Plan filter changeouts and maintenance separately

Filter changeouts and inspection or maintenance have independent schedules.
For each, enter the first planned date, a whole-month interval from 1 to 120 months, a confirmed cost per event, and its confirmation status.
Check whether the filter event price includes parts, replacement labor, and waste handling.
Request a consolidated confirmed event price for missing work and record the coverage check.

Budget boundaries and month ends

A budget starting in 2027-01 includes 2027-01-01 and excludes 2028-01-01.
If the first planned event precedes the budget, the recurrence continues from that anchor and counts only dates inside the window.
A monthly January 31 schedule uses the actual last day of February and then returns to March 31.
Leap years use February 29 while preserving the original anchor for later events.

A confirmed schedule with no events in the window has zero event cost for that period.
An empty first date does not establish that no changeout is needed.
These dates support budgets and appointments; they do not establish statutory inspection intervals or a safe filter replacement point.
Revise the plan after field review when differential pressure, emissions, substance properties, or manufacturer instructions require a different schedule.

Read initial cash, annual operation, and first-year cash separately

Installation and initial payments

Entered installation subtotal = package + separate scope quantities × unit prices
Initial cash = entered installation subtotal × tax factor
Tax factor = 1 when included, or 1 + confirmed percentage ÷ 100 when excluded

Recurring expenditure and the first year

Annual operation = electricity + filter events × event price × tax factor + maintenance events × event price × tax factor
First-year cash = initial cash + twelve months of annual operation

First-year cash is a nominal allowance combining installation with the entered operating period.
It does not automatically include financing, time value of money, depreciation, residual value, or production downtime losses.
Annual operation is not a guarantee of the same cost in later years; recalculate when use, prices, or schedules change.
Intermediate products remain unrounded and final KRW displays round to the nearest won, so separately rounded rows can differ slightly from a rounded total.

Worked example: quote A has KRW 15,740,000 first-year cash

These are fictional inputs demonstrating arithmetic, not market prices, recommended specifications, or standard replacement intervals.
Confirm the design and scope and start the budget in 2027-01.
The quote is effective from 2026-11-23 through 2027-01-31.
Quote A has a KRW 10,000,000 package, separate ductwork of 20 m at KRW 50,000/m, electrical work of KRW 500,000, and commissioning of KRW 300,000, with all remaining installation scopes included.

Installation and electricity

Entered installation subtotal: 10,000,000 + 1,000,000 + 500,000 + 300,000 = KRW 11,800,000
Initial cash with the fictional quote’s confirmed separate 10% tax: KRW 12,980,000
Electricity: 5 kW × 1,920 h × KRW 150/kWh = KRW 1,440,000

Recurring costs and first-year cash

Filters: 2027-06-30 and 2027-12-30, KRW 400,000 per event → KRW 880,000
Maintenance: 2027-03-31 and 2027-09-30, KRW 200,000 per event → KRW 440,000
Annual operation: KRW 2,760,000
Initial plus annual operation: KRW 15,740,000

Both schedules use six-month intervals and each has two events inside the budget.
The confirmed quote tax factor applies to filter and maintenance prices, but is not applied again to tax-inclusive electricity.
Initial fitted filters can be covered by the installation package while later replacements still require separate planned expenditure.

Compare quote B on the same measures and inspect sensitivity

Quote B is a tax-inclusive KRW 13,200,000 package with all installation scopes included.
Keep the same power and schedules as A and use tax-inclusive filter and maintenance event prices of KRW 440,000 and KRW 220,000.
Annual operation remains KRW 2,760,000 and first-year cash becomes KRW 15,960,000.
Once both quotes are confirmed, the first-year difference in these fictional conditions is KRW 220,000.
Check matching installation scope, taxes, and operation before interpreting that difference.

Changing only the electricity rate by ±10%

10% of A’s KRW 1,440,000 electricity cost is KRW 144,000.
With installation, filter, and maintenance assumptions fixed, first-year cash becomes KRW 15,596,000–15,884,000.
This is neither a guaranteed supplier-price range nor a statistical prediction interval for total costs.

The calculator does not declare an overall lowest quote until every registered alternative is complete.
An unresolved ductwork price or tax basis can reverse the apparent ranking.
Resolve uncertain scope and operation first, especially when price differences are small, and assess technical suitability using the separate professional review.

Plan the deposit, interim payment, and balance

Enter deposit and interim percentages and allocate the remainder to the balance.
Their sum cannot exceed 100%, and a confirmed 0% is accepted for either input.
Even with the same installation total, a larger deposit changes the cash needed before work begins.
The entered split is a contract assumption rather than a standard or recommended payment arrangement.

Quote A payment allocation

From initial cash of KRW 12,980,000, a 30% deposit is KRW 3,894,000, a 40% interim payment is KRW 5,192,000, and the remaining 30% balance is KRW 3,894,000.
The deposit rounds first; the interim amount is capped at the remaining rounded total; the balance takes the remainder.
This residual adjustment prevents tiny amounts and rounding from producing a negative balance.

This allocation covers initial installation, without automatically adding annual filter or maintenance costs to the deposit.
Confirm actual payment dates, invoice timing, acceptance conditions, deposits, and any advance parts order with the supplier.
Update both the contract record and calculator inputs when additional work or delays change the agreed terms.

Work from the quote to a revised supplier request

  1. Confirm the shared design and scope, then enter the budget start month and package amount.
  2. Classify all eight scopes, adding quantities and prices only for separate work.
  3. In operation, enter electrical input, annual hours, the energy rate, and both recurring schedules.
  4. In contract terms, check taxes, the confirmed rate, effective and expiry dates, and payment percentages.
  5. Switch among up to four alternatives, compare the same measures, and send unresolved items to suppliers.
  6. Save a TXT report or print the results, then confirm revised quotes and actual payment and service appointments.

Switching quotes or stages preserves each set of inputs.
When viewing the worked example, check its fictional-example label and use Restore my inputs to return to your saved draft.
On a phone, use the result’s editing action to return to the current quote.
When sharing separate project documents, include only necessary contract information and avoid unnecessary personal details.

Practical scenarios and the limits of a cost comparison

A new workshop installation

Use the tool when an initial equipment and fan price needs to be completed with ducts, electrical work, and commissioning.
Check access and removal requirements and review initial cash together with its payment split.
A subtotal containing unresolved work should not become an approved order total.

Restarting a modified exhaust system

Enter the professionally confirmed modification scope and check commissioning, applicable pre-use inspection, and handling costs.
A price difference does not establish performance or permission to restart.
For an existing equipment operating ledger alone, distinguish this project comparison from the separate dust collector operating-budget tool.

This calculator does not determine airflow, capture velocity, pressure loss, explosion protection, emissions, permits, or regulatory compliance.
Filter count and quoted price do not establish cleaning performance, manufacturer warranties, or workplace exposure improvement.
Confirm the applicability and cost of required design and inspection work with qualified professionals rather than removing it merely to lower the displayed price.

Frequently asked questions

Can I compare a quote that only gives the equipment price?

You can see its confirmed subtotal, but a completed comparison waits for the coverage of hoods, ductwork, fans, electrical work, installation, commissioning, and other scope items.
Ask the supplier to restate missing items on the same scope.

Do I also enter the unit price of ductwork included in the package?

No additional price is needed once inclusion is confirmed.
Stored quantities and prices are ignored while an item is marked included.
If the design exceeds the package allowance, request a separate quote for only the additional work.

Can I leave the filter schedule blank when no changeout is planned this year?

A blank date means the schedule remains unknown.
Confirm the first planned date and interval; a valid schedule with no events in the window produces zero events.
For confirmed unnecessary work, record a confirmed zero cost and a supported schedule, such as a first date after the budget ends.

Is the quote tax percentage added to electricity again?

No.
The electricity rate is entered in KRW/kWh including its taxes and applicable adjustments.
Normalize installation, filter, and maintenance amounts to one tax basis within each quote, requesting a revised supplier quote if the original terms differ.

Why is no lowest quote shown after I enter the prices?

Every registered alternative must have its scope, tax basis, operation, schedules, and contract conditions confirmed, together with the common design check.
The quote must cover the budget start date.
A completed alternative is not presented as the overall lowest while another remains unresolved.

Are the replacement interval and inspection dates statutory requirements?

They are your planning inputs for budgets and appointments.
Obtain separate advice on actual inspection and replacement needs under the relevant substances, equipment, manufacturer instructions, and applicable law.
The calculated dates and costs do not establish a safe service life or compliant performance.

Does loading the worked example erase my draft?

Your original inputs, selected quote, editing stage, and checklist are preserved while the example is open.
Restore my inputs returns to that saved editing state.
Example prices are fictional and must not be treated as supplier prices.

What should I confirm after saving the result?

Check unresolved work, labor and waste handling within each filter changeout price, taxes, quote validity, and deposit, interim, and balance terms with the supplier.
Update the inputs from the revised quote, compare the cash difference again, and confirm actual payment and maintenance dates.

Official context when applying the tool in Korea in 2026

The relevant Korean Rules on Occupational Safety and Health Standards were checked through the National Law Information OPEN API on 2026-11-23.
The relevant provisions match between current-search version MST273603 and the 2025-12-01 amendment version MST280187.
The search header date 2026-03-02 concerns deferred commencement of part of Article 241 and is not a uniform new commencement date for the local exhaust provisions.
The references below explain matters requiring professional confirmation in Korea; they do not impose Korean requirements on workplaces in other countries.

  • Rules, Article 73: ducts informs checks of duct routing, connections, and access for cleaning within the confirmed design and work scope.
  • Rules, Article 76: exhaust treatment requires separate consideration of suitable air cleaning; one filter type is not assumed suitable for every substance.
  • Rules, Article 429: local exhaust performance requires separate assessment of the applicable chapter’s performance requirements and actual compliance.
  • Rules, Article 441: pre-use inspection concerns inspection before first use following installation or dismantling and modification or repair where that chapter applies; it is not described as an identical obligation for every industry.
  • Value-Added Tax Act, Article 30: the general 10% rate was checked in current version MST276117, effective 2026-01-02. The calculator still uses the entered confirmed rate and does not determine the actual transaction’s tax status.

The reviewed provisions do not supply standard installation prices or a universal filter replacement interval.
At each order, recheck current law and applicability, the confirmed design, supplier prices, measured power, service coverage and dates, tax treatment, and quote validity.

Resolve missing scope before confirming payment plans

Start with the package price on your actual quote and confirm the work coverage one item at a time.
Leave unresolved items unknown and save the report and checklist for the supplier.
Once revised quotes arrive, compare initial cash, annual operation, and first-year cash again on matching terms before confirming the contract, payments, and maintenance appointments.