Exhibition Booth Build vs Rental Quote Calculator
Track owned modules, reuse and event-specific installation, dismantling, freight and storage.
Compare actual all-in quotes in KRW, first-event cash, cumulative costs and repeat-event crossover.
Enter actual final amounts including tax and discounts for the same confirmed booth scope. Blank means unknown; zero means confirmed included or free. This tool does not estimate market prices.
Confirm power, structural/fire requirements and work approval with the organizer, venue and qualified contractor. Amounts are in KRW; Korean venue sources do not replace your event rules.
Enter the quotes and calculate to see event cash and a re-quote checklist.
Compare actual booth build and rental cash across your event schedule
This calculator aligns an exhibition booth purchase or build quote with a rental quote for the same booth requirements and events.
A basic booth price can omit installation, electrical services, freight, dismantling, storage between events and repairs before the next show.
Small exhibitors and owner-operated businesses can compare the cash needed for the first event with cumulative spending across repeated events.
The inputs are your original supplier quotations, not an assumed market construction rate.
Matching floor area alone does not establish matching modules, finishes, graphics, furniture, equipment, approved power or working hours.
Send both suppliers the same scope and installation schedule before comparing amounts.
This English experience uses final tax-inclusive Korean won and Korean venue references checked on 2026-11-18 for the 2026 model context.
No statutory VAT rate, tax recovery, engineering compliance or venue approval is calculated.
Align scope before copying the prices
Footprint, finish, modules and graphics
Width and depth record the common booth footprint.
The model does not multiply that area by an invented construction price.
List required wall, shelf, counter or other module quantities alongside finishes and graphics, and check whether replacement printing is already included in another line.
Approved power, equipment and site conditions
Record the power requirement already agreed with the organizer or venue and the equipment needed in both offers.
Entering a kW figure does not certify wiring capacity or safety.
Separate electricity applications, electrical work, lighting, screens, furniture and other rentals when the quotations charge them separately.
Preserve a reference or version and the actual confirmation date for each offer.
A description such as all installation included does not establish that transport, dismantling, waste disposal and removal are covered.
Designated contractors, delivery slots, work documents and site access conditions must be checked for each event.
Confirmation fields record your written checks and do not replace organizer or venue authorization.
Enter modules first, then complete the event ledger
- Record common width, depth, finish and graphics, power and equipment, then verify that both offers meet the same approved scope.
- Add each module, required quantity, reusable status and quantity already owned.
Match purchase and rental unit prices to the written quote. - Add events in start-date order with installation date, event start, event days, billed rental days and dismantling date.
Choose per-event or per-billed-day rental pricing for each module. - For both plans at each event, enter setup, dismantling, transport, storage, repair, graphics, power, equipment and other charges.
- Confirm final tax-inclusive payable amounts, discounts, included scope, dates and reuse conditions in writing before interpreting the decision.
- Review first-event cash, event spending and cumulative crossover, then save or print the report to request comparable revised quotes.
An unknown amount is different from confirmed zero
An empty money field means unconfirmed.
Enter zero only when the supplier has confirmed that a charge is free or already included elsewhere.
A known subtotal is not a complete quote, a guaranteed budget or a lower or upper bound on the final bill.
All amounts are final tax-inclusive KRW payable after agreed discounts; the calculator does not add VAT again or deduct recoverable tax.
Reuse, existing ownership and repeat purchases
Reusable modules
First-event new purchase cost = (required quantity − already-owned quantity) × purchase unit price.
The same reusable modules are not purchased again at later events.
Enter storage, transport, repairs and replacement graphics as actual event costs instead.
When the required quantity is already owned, no new purchase cash is needed even if its old purchase unit price is unknown.
Consumables and repeated fabrication
Module purchase cost at every event = required quantity × purchase unit price.
Do not mark a component reusable if it must be fabricated again after dismantling.
This model does not accept an already-owned quantity for consumables; separate reusable and repeatedly purchased items into different rows.
Historical purchase payments for existing stock are excluded because the comparison measures additional cash from now onward.
It is not an accounting depreciation calculation or a recovery analysis of past investment.
Ownership alone does not establish reuse: confirm the next venue’s dimensions, component condition, packing, storage and installation schedule.
Unconfirmed reuse conditions hold the cost decision even when one arithmetic total appears lower.
Per-event rental and per-day rental use different multipliers
Rental module formula
For per-event pricing, add required quantity × rental unit price at each event.
For daily pricing, add required quantity × daily rental unit price × that event’s billed rental days.
Sum the module lines, then add the rental plan’s separate event charges.
Changing event duration does not multiply a per-event package by the number of show days.
A three-day show can have a longer charged rental period because of preparation, delivery and collection, while another offer may cover several days in one event package.
Event days record the show schedule and do not automatically set billed rental days.
This model uses the entered module rates throughout the listed events.
If a supplier uses tiered periods or different prices for each event, first check whether those terms can be represented accurately and request a comparable revised pricing basis when they cannot.
Keep site, freight and storage costs in the correct event
- Setup and dismantling: distinguish on-site installation, labor, disassembly and removal, and avoid adding a charge again if it is already in the module price.
- Transport and storage: confirm route, loading and unloading coverage.
Storage belongs to the period before the relevant event; do not assume that goods can stay at a venue or be stored free between shows. - Repair and graphics: enter the cost needed before that event for repairs, refinishing or replacement graphics.
Owned stock can need repairs even before the first listed event. - Power, equipment and other: include separately quoted electrical work, equipment, forklifts and omitted services.
Put final disposal, removal or storage after the last event into that event’s other charge.
Each event total equals its module cost plus the plan’s nine separate charge categories.
Review first-event cash, maximum event spending and cumulative spending separately to distinguish the launch budget from the full schedule budget.
The ledger groups spending by event; it does not model exact deposit, progress-payment and balance-transfer dates, refundable security deposits or financing costs.
Obtain a separate payment calendar when advance payments or deposits materially affect cash availability.
Synthetic worked example: crossover at the third event
These are fictional numbers for checking the formula, not market rates or actual supplier offers.
Assume four reusable modules, none already owned, at KRW 100,000 each to purchase or KRW 50,000 each per event to rent.
For each of three events, assume KRW 100,000 of additional build-plan charges and KRW 50,000 of additional rental-plan charges.
All other categories are assumed confirmed included or zero.
Event 1
Build: 4 × 100,000 + 100,000 = KRW 500,000
Rental: 4 × 50,000 + 50,000 = KRW 250,000
Cumulative build 500,000 / rental 250,000
Event 2
Build: KRW 100,000 with no repeat module purchase
Rental: KRW 250,000
Cumulative build 600,000 / rental 500,000
Event 3
Build: KRW 100,000 with no repeat module purchase
Rental: KRW 250,000
Cumulative build 700,000 / rental 750,000
Across these three events, cumulative build cash first reaches or falls below rental at event 3 and stays there through the final listed event.
Build minus rental is KRW −50,000, so build requires KRW 50,000 less additional cash in this arithmetic example.
If two identical modules are already owned, first-event build cash becomes KRW 300,000 and the three-event total becomes KRW 500,000.
If the modules are consumables instead, build requires KRW 500,000 at every event, totaling KRW 1,500,000, with no crossover in this schedule.
Example mode holds any actual-quote cost decision.
First crossover is different from crossover that lasts
Read the two crossover counts
First crossover is the earliest listed event where cumulative build cash is at or below rental cash.
Sustained crossover is the earliest event from which that relationship remains true through the last listed event.
A large repair or disposal charge can reverse an earlier advantage.
Equality counts as at or below, and neither count establishes a permanent break-even point beyond the schedule.
The calculator does not invent future events, price increases or resale values.
Missing charges prevent complete cumulative totals and crossover results.
With all money entered but scope, dates or quotation checks still incomplete, interpret numeric crossover as arithmetic reference only.
When reusable stock would be occupied at overlapping events between installation and dismantling dates, the model holds the comparison instead of assuming the same physical items can be used in both places.
Same-day dismantling and next installation are conservatively treated as overlapping because transport and working-time feasibility have not been established.
Questions for different exhibition plans
Preparing a first show
Ask exactly which walls, signage, lighting, electricity and furniture are covered by the rental package.
A lower repeated-event total does not solve a first-event cash shortfall; check whether the actual payment calendar is affordable.
Attending several venues
Confirm module dimensions, height, finishes, installation hours and reuse acceptance at every venue.
Include warehouse-to-venue freight and repairs, and obtain a separate-set or revised-schedule quote when physical stock is needed at overlapping events.
Use the catalog production project cost calculator for printed material distributed with the booth.
Cross-border temporary admission and security requirements belong in the ATA Carnet temporary-admission budget.
When combining reports, reconcile the original lines so freight or printing is not included twice.
Frequently asked questions
Does a lower build cost mean the booth is approved?
No cost result certifies structural, fire or electrical compliance or grants venue permission.
Complete drawings, work documents and organizer or venue checks with the responsible parties separately.
How many times can reusable modules be used?
The model does not set a universal module lifetime or reuse limit.
Confirm condition, specifications and schedule feasibility for every listed event with the supplier, then enter the actual repair costs.
Does a three-day event mean three billed rental days?
Preparation and collection can make the charged period different from show duration.
Confirm per-event versus per-day pricing and enter the actual billed days independently.
Where should I put the old purchase price of owned modules?
Past purchase cash and depreciation are outside this additional-cash comparison.
Enter the existing quantity and include future repair, storage and transport charges where they arise.
Why is the decision held after I enter every amount?
Quote references, confirmation dates, identical approved scope, reuse and event checks must also be complete, with no conflicting reuse schedule.
Fictional examples remain ineligible for an actual-quote decision even when their arithmetic is complete.
Are costs outside the input fields automatically included?
Unentered deposits, tax recovery, insurance, financing and date-specific cash gaps are not added automatically.
Confirm relevant payable charges in the original quote, place them in a suitable separate category, and review payment dates separately.
Official operating references and review date
References were checked on 2026-11-18 for the 2026 planning context.
They support questions about working conditions and service scope, not universal booth prices or reuse lifetimes.
- COEX online work reporting: identifies work documentation and organizer or venue review procedures.
- COEX service contractors: separates exhibition installation, electrical services, furniture, freight and customs, forklifts and dismantling.
- SETEC designated-contractor guidance: a starting point for checking installation, dismantling, storage, removal, electrical and transport conditions.
The current event’s exhibitor manual, responsible venue staff and individual contract determine the applicable terms.
Recheck quote version and confirmation date, work conditions, component condition, storage, disposal and removal coverage whenever you calculate.
Request revised quotes for the same confirmed scope
First establish modules, approved power, delivery and installation dates, dismantling, freight routes, storage and the reusable-item list.
Enter actual amounts above, then send both suppliers the saved ledger and unresolved questions.
Before choosing the lower total, confirm the cash needed to deliver the first event and the reuse conditions that make later events feasible.
Related calculators
- Catalog Production Cost & Quote Checklist CalculatorCompare planning, copy, design, photography, translation, printing, finishing, packing, delivery, and reprint costs across as many as five quantities.
- Event Audio Rental Equipment & Time Quote CalculatorCompare actual audio rental quotes for matching equipment, channels and schedules, including crew, overtime and dated cash needs in KRW.
- ATA Carnet vs Ordinary Temporary Admission Cash Budget CalculatorCompare actual carnet and ordinary temporary admission quotes, refundable deposits, release dates, financing costs and cash shortfalls for one overseas exhibition trip.
- Logo Design Quotes: Concepts, Revisions & Deliverable RightsCompare two actual logo design quotes by concepts, revisions per selected design, redesign requests, file and usage-right requirements, and approval-stage cash payments.
- Cash Runway CalculatorEstimate how long available cash can support a business under current revenue and expense assumptions.
- Break-Even Point CalculatorEstimate break-even value using fixed cost, annual margin, tax drag, fees, and downside business stress.