Logo Design Quotes: Concepts, Revisions & Deliverable Rights
Compare two actual logo design quotes by concepts, revisions per selected design, redesign requests, file and usage-right requirements, and approval-stage cash payments.
Enter terms and calculate to see results. Synthetic examples also withhold a comparison decision until evidence is confirmed.
Compare logo concepts, revision terms, deliverables, and usage rights
A shop opening or rebrand can put the same logo on signs, packaging, business cards, and online sales pages. A low package price can change once you add missing concepts, revise more than one selected design, request print-ready source files, or obtain the usage scope your business needs. This tool compares two actual written quotes against the same requirements and identifies the additional costs and unanswered questions.
For a small business using household savings, the decision includes both extra spending and the time needed to renegotiate an incomplete contract. The request ledger records which selected design a request belongs to and whether each vendor treats it as a revision or a new-direction redesign. The result combines that cost breakdown with deliverable and rights questions and an approval-based payment schedule for requesting a revised written quote.
Separate initial concepts from selected designs
Required initial concepts
These are the distinct directions you want to review before choosing a design. Enter 1–20 concepts and compare that requirement with each vendor’s included count. Confirm the counting rule, such as whether a different color version is a separate concept. Identical package names do not establish identical scope.
Selected designs to revise
Record 1–4 designs that you actually select for further work. Their number cannot exceed the required initial concepts. Name a main logo and a secondary symbol separately if both need revisions, and confirm the included rounds and excess price for each. Unused rounds from one selected design do not automatically transfer to another.
Keep the vendor name and a quote reference or verification-date note so that revised proposals remain distinguishable. The base amount should cover the work already included in the package. Use the other-fee field only for charges that are not counted elsewhere. For example, check whether a font purchase or a short brand guide is already included before adding it again.
Use a request ledger to distinguish revisions and redesigns
The request ledger supports up to 30 rows. Each row identifies the request, the selected design it concerns, and the number of billable rounds under the agreement. For each vendor, classify it as a revision, redesign, or unknown. A row is not necessarily one round: confirm how a batch of feedback is counted and enter an integer from 1 to 100 rounds for that row.
Requests classified as revisions
Revision rounds are added for each selected design before subtracting that design’s own allowance. If two designs include two rounds and one round respectively, each allowance is applied separately. Color changes or letter-spacing adjustments are not presumed free; their treatment follows the actual contract definition.
Requests classified as redesigns
A new direction or concept change is charged at the redesign price when that is how the parties classify it. Those rounds do not consume the existing design’s included revision allowance. Receiving a new concept does not automatically create a new free-revision allowance. Record any subsequent work using the separately agreed scope and request ledger.
Vendor A may call the same request a revision while Vendor B calls it a redesign. The calculator compares the confirmed agreements rather than deciding which classification is legally correct. An unknown classification is not assigned to the cheaper option; the relevant total remains unresolved. A selected classification without written confirmation may produce a conditional amount, but it cannot establish the lowest equivalent quote.
Compare file delivery and rights in separate requirement rows
The six requirement rows cover editable vector sources, web PNG/SVG files, print PDF files, commercial usage, adaptation or modification usage, and assignment of economic copyright. The first four are required by default; select the remaining rights only when your project needs them. You do not have to purchase an unnecessary assignment, but an unselected requirement is excluded from the comparison. Define your business needs before treating the total as complete.
How vendor deliverable and usage-right statuses affect the comparison
Vendor status
Meaning
Treatment
Included
The base quote supplies the required scope
No extra charge; check confirmation
Available for an extra fee
The extra purchase satisfies the requirement
Add that fee once
Unavailable
The vendor cannot satisfy this requirement
Show the shortfall and withhold comparison
Unknown
Inclusion or additional terms are unresolved
Ask again rather than assuming it is free
Specify more than the file extension: include editable software versions, color modes, monochrome and reversed variants, transparent backgrounds, and the printer’s requirements where relevant. For commercial usage, describe media, territory, duration, signage, packaging, online advertising, and use by franchisees or outside production vendors. Include third-party font and stock-asset licensing questions in the scope that you ask the designer to confirm. When the requirement wording changes, obtain confirmation of the revised scope rather than reusing evidence for an older requirement.
How the quote calculations work
Additional concepts, revisions, and redesigns
Additional concepts = max(0, required concepts − included concepts) Excess revisions per design = max(0, its revision rounds − its included rounds) Revision cost = Σ(excess rounds per design × that design’s excess price) Redesign cost = total rounds classified as redesign × redesign price
Additional concept cost is the concept shortfall multiplied by the extra-concept price. When a design has no excess revisions, a blank excess price does not create a cost in the current scenario. When excess work does exist, an unknown price is not treated as zero.
Conditional total
Add the base quote, other fee, additional concepts, excess revisions, redesigns, and extra fees for required deliverables or rights. Every amount must use the same final VAT-inclusive KRW cash basis. For a VAT-exclusive quote, confirm the applicable tax and other payable items with the vendor before entering a comparable all-in amount. This tool does not determine tax status or deduct input-tax credits to calculate an after-credit cost.
Check whether an additional concept and a redesign request describe the same paid task. If the vendor bundles them into one charge, reconcile included quantities and separate charges before entering the quote so that the work is not counted twice. The calculator does not invent an allocation for an inseparable bundle. It also does not forecast future revisions or apply a probability of design failure.
A worked example: different base prices, the same KRW 850,000 total
This is a synthetic illustration of the formula. Assume three required concepts and two selected designs, with three revision rounds on the first design, one revision round on the second, and one redesign round on the first. The required scope includes vector, web, and print files and commercial usage; there are no other separate charges.
Synthetic VAT-inclusive logo quote comparison for Vendors A and B
Cost item
Vendor A, KRW
Vendor B, KRW
Base quote
500,000
750,000
Additional concepts
100,000
0
Excess revisions
50,000
0
Redesigns
150,000
100,000
Separate editable vector delivery
50,000
0
Conditional total
850,000
850,000
Vendor A includes two concepts and therefore needs one extra concept. Its selected designs include two revision rounds and one round, so only the first design exceeds its allowance, by one round at KRW 50,000. A redesign costs another KRW 150,000. Vendor B includes three concepts and three plus one revision rounds, leaving only its KRW 100,000 redesign charge. After all required scope and payment checks are complete, the two quotes tie; neither is a unique lowest-cost vendor.
If the first design’s revision request becomes four rounds, Vendor A has two excess rounds and its total becomes KRW 900,000. Alternatively, keep the original requests but reduce the second design’s included revisions to zero: that design creates one extra round, also producing KRW 900,000. This illustrates why allowances are tracked per selected design rather than pooled. The example does not establish an appropriate commercial price.
Read known costs, conditional totals, and confirmed totals differently
Known cost subtotal
This adds only the amounts that can be calculated from the entries. A subtotal can appear while a required usage-right fee is missing, but it is not the full cost of completing the contract.
Conditional total
This appears when all necessary amounts can be calculated. If request classification or deliverable confirmation is outstanding, a numerical total still depends on unresolved terms.
Confirmed total and comparison
Price, concept, request, and required-scope checks must be complete for a confirmed total. Both vendors must also have reconciled payment schedules before the lowest equivalent total can be identified. The result does not rank design quality.
Blank means unknown, whereas zero explicitly means no charge. Enter zero after confirming free provision; leave a field blank when an answer is still outstanding. A vendor unable to supply a required item does not offer the same completed scope even if its partial price is lower. An unknown economic-rights assignment does not by itself block the comparison when that requirement is not selected.
Reconcile approval-stage payments and cumulative cash
The payment ledger covers the adjusted full quote, including extras, rather than simply dividing the base fee. Name stages such as deposit, direction approval, and final-file acceptance, then enter actual dates, VAT-inclusive amounts, and confirmation of the approval and payment conditions. Each vendor can have 1–8 payment rows. Rows with valid dates and amounts are ordered by date to show stage cash and cumulative cash.
Allocating the KRW 850,000 example
Vendor A’s payments of KRW 250,000, 300,000, and 300,000 total KRW 850,000. Vendor B’s payments of KRW 300,000, 250,000, and 300,000 reach the same amount, so each unallocated difference is zero. Their upfront cash requirements still differ, making payment dates and approval conditions relevant even when totals tie. A KRW 850,000 total against KRW 850,001 of payments produces a −1 KRW difference; over-allocation is not hidden by clamping it to zero.
The unallocated difference is the conditional total less the sum of known payment amounts. A row with an unknown date or amount is not a completed payment plan, and unresolved approval conditions still prevent equivalent comparison even when the arithmetic balances. Impossible calendar dates are errors: 2028-02-29 is valid, while 2026-02-29 is not. Keep this planned schedule separate from receipts for money already paid.
A practical workflow before signing
Define required concepts and selected designs, then send the same written scope to both vendors. Describe intended shop, online-store, and franchise use before comparing prices.
Transfer included scope and extra prices from the actual quotes. Assign each request to its selected design and ask each vendor to confirm revision versus redesign treatment.
Complete the file and rights matrix. When an item is available for an extra fee, confirm that the extra purchase actually satisfies the stated specification.
Enter approval-stage payments for the full adjusted quote and calculate. After editing inputs, calculate again to refresh both results and the review report.
Save the TXT report or print outstanding questions for a revised written quote. Once both vendors’ terms are confirmed, consider the total, timing of cash, deliverables, and rights together.
Opening a shop or online store
A sign maker and a packaging supplier may need different files. Confirm whether you are buying a new work or a renamed template and whether outside production vendors can use the delivered assets. Record those requirements to expose file-recreation costs and cash needed before opening.
Rebranding and extending a visual identity
Define required modification and usage scope before expanding a logo into new channels. Logo work, catalog printing, and website development have different delivery units. Keep project costs separate to identify source-file or rights charges duplicated across several proposals.
Understand file ownership, copyright, trademark, and model limits
Korea’s Copyright Act Article 10 addresses rights arising through creation, while Articles 45 and 46 distinguish assignment of economic copyright from permission to use a work. File delivery alone does not establish either assignment or permission for every medium, territory, or duration. Article 45(2) presumes derivative-work rights under Article 22 excluded from a full assignment without a special agreement, with a program exception. Not every small edit is necessarily a derivative work, so specify the intended adaptations.
Moral rights belong personally to the author under Article 14 and must not be presented as transferred economic rights. Review modification and attribution arrangements separately, including Article 13’s integrity protection. Trademark rights arise through registration under Trademark Act Article 82(1); logo delivery or copyright assignment does not guarantee registrability or trademark ownership.
The calculator does not determine copyright eligibility, originality, non-infringement, third-party font-license validity, trademark registrability, or contractual legal effect. If you want to use an unselected concept, discuss its usage and rights separately from the selected final work. Design quality, collaboration, timing, and ongoing support also matter; the cash comparison does not evaluate them.
Frequently asked questions
Are three concepts the same as three selected designs?
Concepts are initial directions to review; selected designs are the ones you choose for further work. You may review three concepts but select only one. Confirm unselected-concept usage separately.
Can a redesign charge apply while free revisions remain?
Yes, if the agreement treats a change of direction as a separate redesign. The model does not automatically substitute unused revisions for redesigns. Confirm the request classification and price first.
Does delivery of vector sources transfer every copyright?
File delivery, economic-rights assignment, and a usage licence are separate checks. Specify required media, duration, territory, third-party use, and adaptations. Do not describe the author’s moral rights as assigned.
Should I enter zero when a price is missing?
Enter zero only after confirming that there is no charge. Leave an unanswered price blank so that the result does not imply that a missing cost is included. A rate that is irrelevant because there is no excess work in the current scenario does not block the total.
Which vendor is recommended when totals tie?
If both quotes are fully confirmed, the result shows a tie rather than a unique cheapest vendor. Review payment timing, files, usage scope, design quality, and collaboration terms. Outstanding requirements withhold the equivalent-comparison conclusion.
What happens when payments exceed the quote total?
A negative unallocated difference exposes over-allocation. A KRW 850,000 total and KRW 850,001 of payments show −1 KRW. Check duplicated stages or extras already included in the base fee.
Does loading the example confirm the contract terms?
No; example prices illustrate the formula and all evidence confirmations remain unchecked. Replace values and ledger entries with your actual quote, then confirm only what the vendor has documented. Changed requirements need renewed confirmation.
Are entries or quote documents saved to a server?
Calculations run in your browser, and this tool does not automatically save or transmit quote entries. Save a TXT report or print the result if you need a record. Refreshing resets the entries, so retain original contracts separately.
Verified official sources and the next action
Sources were checked on 2026-11-17. The direct National Law Information OPEN API checks used Copyright Act version MST 285693, Act 21595, promulgated 2026-04-28 and effective 2026-10-29, and Trademark Act version MST 279819, Act 21134, effective 2025-11-11. Recheck subsequent amendments, updated standard forms, and the actual quote’s validity date when renewing a contract.
Turn the result into a like-for-like revised quote request
Send selected-design revision rounds, redesign triggers, required files, usage media and duration, and approval-stage payments together rather than forwarding only the lowest number. After the vendor answers outstanding questions, update the entries and calculate again to retain a clear basis for the comparison.