Compare the cost of a teaching setup beyond the display
An interactive display purchase can involve more than the panel price.
An OPS computer, stand, mounting work, wiring, software seats and management renewals may be separate items.
A display that arrives without the components your classroom needs can leave you seeking a revised order and extra funding.
This calculator compares up to four actual quotes for the same required classroom setup.
It shows setup cash, charges by contract year and the total over your evaluation period, while keeping unresolved items visible.
Use a current supplier quote rather than treating the worked example as a market price.
Both language versions use the same calculation engine and Korean won (KRW); the English page does not convert the amounts into dollars.
The decision and next action
First establish whether each supplier covers your required quantities and options.
Then compare the immediate preparation amount and period total, and confirm the model, classroom configuration and order quantity with the supplier.
If compatibility or installation scope is unresolved, use the checklist to request a revised quote before choosing by price.
Common conditions and quote inputs
Devices, years and comparison date
Required devices, from 1 to 100, are the common quantity each quote must cover.
The evaluation period is 1 to 10 years, with each contract year covering 12 months after the contract begins.
Enter the date on which you are comparing quotes.
A quote whose validity ends before that date, or whose contract starts before that date, remains on hold for this forward purchase comparison.
Required teaching components
The panel is always required.
Select whether OPS, mount or stand, installation, wiring, software licences and management are required for your setup.
You may deselect an option when reusing existing equipment.
Its entered values are preserved for later editing, but the deselected item is excluded from the total.
Record the supplier or quote name and exact display model.
Screen size alone does not establish compatibility: operating systems, connectors, touch input, OPS power and interface requirements, brackets and stand limits may differ.
Confirm compatibility only after checking the actual combination with the supplier.
Entering a model name does not trigger an automatic compatibility decision.
Included, separate, unknown and not supplied
- Included: the option is already covered by the package price. Confirm the supplied quantity; the engine does not add its price again.
- Separate: the actual supplied quantity is multiplied by the entered unit price. Enter zero only when a zero charge has been confirmed.
- Unknown: the price or scope has not been established. A blank is not treated as zero, and the complete total or cost recommendation remains pending.
- Not supplied: the supplier has confirmed it does not provide a required item. A calculable cost does not make that quote cover the same setup.
Per device versus project package
For per-device billing, the engine charges the full quantity actually supplied.
If you need two devices but the quote supplies one, it flags the shortage rather than inventing a price for the missing device.
A project package means the quoted package covers the whole required setup, with a confirmed package quantity of at least one.
Check that a project licence really supports all required devices; per-device software quantities must cover the required simultaneous device count.
Ask whether wall reinforcement, recessed cable runs, electrical work, transport and removal of old equipment are included.
Combine the confirmed relevant work into the installation or wiring amount.
Avoid entering a package price under both the panel and installation: mark the bundled work as included.
Formulas for preparation cash and period cost
One-time and monthly charges
One-time cost = sum of quantity × unit price for separately billed panels, OPS, mounts, installation and wiring.
Monthly item period cost = supplied quantity × monthly unit price × max(evaluation months − free months, 0).
Preparation cash = one-time cost + monthly charges already payable in month one.
Period total = one-time cost + licence period cost + management period cost.
Software licences and management have separate monthly prices and free-month inputs.
For monthly items, included means the package covers the entire evaluation horizon.
If only the first year is free and renewal charges follow, choose separate and enter the renewal monthly price and free months.
For a 36-month evaluation and 12 free months, the licence has 24 paid months.
If the free period covers the whole evaluation, that monthly item contributes zero during the evaluation.
This does not establish whether the agreement ends or automatically renews afterward.
An unconfirmed free period should remain blank until the supplier confirms it.
Choose the actual VAT basis: included, additional, confirmed no addition, or unknown.
Only the additional setting applies the percentage you have confirmed from the contract.
There is no statutory tax-rate preset, exemption decision or input-tax-credit calculation.
All unit prices in a quote must share the same VAT basis; request a consistent revised quote if the source mixes tax-inclusive and tax-exclusive lines.
Calculations retain precision internally and round the final displayed interval total to whole won.
Separately rounded annual amounts may differ by a few won from the rounded overall total; check the supplier’s invoice rounding rule.
Reading annual charges and renewals
Paid months in a contract year equal cumulative paid months at that year’s end minus cumulative paid months at the previous year’s end.
With 13 free months, year one has no monthly charge, year two has 11 paid months and year three has 12.
Year one also contains one-time hardware and work costs; subsequent years contain the relevant monthly charges.
These are 12-month periods after the contract starts, rather than calendar tax years or an actual payment-date ledger.
Annual prepayment, advance deposits, delivery balances and a lump-sum renewal bill require a separate review of the agreement.
Preparation cash includes only the first month’s payable recurring charge and can therefore differ from an invoice requiring several months upfront.
Preparation cash is already part of the period cost; adding the two would double count it.
Worked example: two displays over three years
This is a fictional arithmetic example, not a current supplier price.
Both quotes cover two devices over three years, all options are required, compatibility is confirmed and VAT is included.
The comparison date is 2026-11-22, the contract begins on 2026-12-01 and the quote expires on 2026-11-30.
Quote A
Panels: 2 × KRW 2,000,000; OPS: 2 × KRW 500,000; stands: 2 × KRW 200,000; project installation: KRW 300,000; project wiring: KRW 100,000.
Licences cost KRW 10,000 per device per month after 12 free months.
Management costs KRW 20,000 per project per month with no free months.
One-time KRW 5,800,000 + licences KRW 480,000 + management KRW 720,000 = KRW 7,000,000.
Quote B
Panels: 2 × KRW 2,400,000 including OPS and stands; project installation: KRW 400,000; project wiring: KRW 100,000.
Licences cost KRW 15,000 per device per month with no free months.
Management costs KRW 20,000 per project per month after 12 free months.
One-time KRW 5,300,000 + licences KRW 1,080,000 + management KRW 480,000 = KRW 6,860,000.
Preparation cash and annual charges for two fictional three-year quotes in Korean won| Amount | Quote A (KRW) | Quote B (KRW) |
|---|
| Preparation cash | 5,820,000 | 5,330,000 |
| Year 1 | 6,040,000 | 5,660,000 |
| Year 2 | 480,000 | 600,000 |
| Year 3 | 480,000 | 600,000 |
| Three-year total | 7,000,000 | 6,860,000 |
Quote B costs KRW 140,000 less over three years, even though its renewal-year charges are higher than A’s.
Looking only at panel unit prices would miss the included hardware and different free periods.
If an item becomes unknown, resolve it before using the difference to place an order.
A confirmed subtotal is not a complete comparable quote
Partial input can still produce a confirmed one-time subtotal.
It excludes unresolved options, monthly charges and unconfirmed taxes, so it is neither a complete price nor an upper limit.
When VAT is unknown, use the subtotal only as an account of known line prices.
Why a calculated total may still be on hold
Missing required items, insufficient supplied quantities, unknown or incompatible hardware, a blank display model and unresolved validity or start dates affect scope.
Being able to add the amounts does not establish that the setup can support the required teaching environment.
Only when every comparison quote has confirmed costs and satisfies the common requirements does the engine show the lowest-cost quote and difference.
Equal totals are shown as tied.
Unit-price sensitivity uses your assumption
The scenario lowers or raises confirmed, separately billed unit prices by your chosen percentage.
The initial 10% is an illustration, not a price forecast; you may choose 0–50% with up to two decimal places.
Quantities and free periods stay the same, and bundled options remain included without an extra charge.
At ±10%, the worked example gives A a total of KRW 6,300,000–7,700,000 and B a total of KRW 6,174,000–7,546,000.
Real suppliers need not change all prices by the same percentage when quantities or quote validity change.
Overlapping scenario ranges do not guarantee a discount or establish product quality.
Update the original inputs when a supplier issues an actual replacement quote.
Steps, saving and the supplier checklist
- Set the required device count, years, comparison date and mandatory options. Compare different classroom configurations separately using consistent common conditions.
- In the quote step, record the model, dates, VAT basis and compatibility, then enter that supplier’s included and separate lines.
- Switch supplier tabs to enter another quote. Previous entries remain available; you can compare up to four quotes.
- Review preparation cash, annual charges, period totals and unresolved items. Use the quote’s edit action to return to its inputs.
- Download the comparison as a text file or open its print report for site and contract discussions. Checklist ticks are your notes and do not override unresolved engine checks.
The example action identifies the data as fictional.
Restoring the original inputs returns to your previous values, step and selected quote.
Keep the source quote version and the date of supplier confirmation in your records, and compare the transferred quantities and prices with the final agreement.
Practical classroom checks and limits
A new classroom
Check power and network locations, wall construction, access routes, lifts and delivery charges.
Keep wiring unknown until the site work is confirmed rather than entering an assumed zero.
Ask whether teaching software seats and the OPS operating-system licence are separate entitlements.
Reusing existing equipment
Check video, touch and audio operation with the existing computer, and confirm that the stand supports the new display.
Deselecting a required purchase excludes its cost from the comparison; it does not certify safe reuse or warranty coverage.
Electricity, downtime losses, resale value and financing are not automatically included in these totals.
Frequently asked questions
Does every interactive display need an OPS computer?
It depends on the teaching software, existing computer and panel operating system.
Confirm your setup with the supplier before selecting OPS as required.
How should free installation be entered?
Use included when it is bundled into the package.
Use a separate price of zero when the supplier explicitly confirms a zero charge; otherwise leave it unknown.
Can licences and management both have monthly charges?
Yes, when they are distinct charges.
If one monthly package covers both, put the price on one line and mark the other included to avoid double counting.
Is one free management year a default entitlement?
No.
Manufacturer offers can depend on the product and policy.
Enter the free months confirmed for your current agreement.
Is preparation cash the contractual deposit?
No.
It combines one-time cost and payable month-one recurring charges.
Check deposit, balance and prepayment timing separately.
Why do I enter the VAT rate myself?
Quotes may use different tax bases.
The calculator uses only your confirmed contract percentage and does not determine statutory tax, exemption or input-tax recovery.
Can suppliers offer different quantities?
You can record their actual quantities, but a shortage against the common requirement blocks recommendation.
Request a revised quote covering the same setup.
Can I order immediately when a lower total appears?
Confirm hardware compatibility, work scope, validity, warranty and renewal terms in the agreement first.
The result compares entered costs and declared scope.
Sources and update basis
The official Samsung WAF interactive display package page was checked on 2026-11-22.
Its separate OPS purchase and management free-period and policy-change notices support separating those cost items.
No listed price or promotion is imported as a default.
The stand description also mentions a different model, so this calculator does not make an automatic compatibility decision.
Recheck the actual model, site work, taxes, free period and renewal unit prices with the supplier before ordering.
This 2026 implementation is contract arithmetic and does not determine legal, procurement, installation safety or tax compliance.
Match the required setup before choosing by total
Keep your quote beside you and start with the required device count.
Leave unresolved options visible and send those questions to the supplier, so the final comparison includes both preparation and renewal costs.