Plan a modular partition order from the drawing
Dividing a wall length by the advertised panel width does not produce a complete modular partition order.
Door frames occupy space, shared corners need the correct connection sets, and inline joints and end trims add their own requirements.
This calculator organizes standard panel quantities, connection sets, door and window kits, and residual gaps from an already confirmed layout and product specification.
Use the result to reconcile an order with your installer or supplier.
The calculator does not fill an unexplained gap by cutting a panel or substituting another width, and an unknown price is not treated as free.
Reviewing quantities together with the confirmed subtotal helps identify missing components before another order or delivery becomes necessary.
Documents to have ready
- A confirmed plan showing run lengths, endpoints and shared junctions
- One product specification with matching height, finish, effective panel width and connector allowances
- Frame positions, actual occupied opening widths and the included kit components
- Per-unit quotes, pack sizes, minimum order quantities, installation and delivery on the same tax basis
Geometry is not jurisdiction-specific, but this page records all lengths in mm and monetary inputs in Korean won, KRW.
It does not convert currencies or apply a Korean statutory tax rate.
Use a consistent effective-width convention
The first input is effective panel width.
The nominal width in a product name may differ from the space occupied after assembly, so confirm the measurement convention against the supplier drawing.
Inline connector width is the additional length between adjacent panels.
Adding this allowance again when it is already included in the panel module can undercount panels.
Allowances at each run end
Deduct the confirmed occupied width at the start and end of each gross run.
A shared corner can require one physical set while its allowance along each adjoining run differs with the drawing convention.
Use the supplier-confirmed allowance for each direction rather than deducting the full post width everywhere.
Site tolerance
Tolerance is a confirmed limit against which the residual gap is compared.
It is not an automatic allowance for an uneven floor, an out-of-plumb wall or assembly clearance.
Enter the limit approved for the actual product and site rather than increasing it to hide a gap.
Count each shared junction once
Assign one node ID to one physical connection point.
If runs A–B and B–C meet at an L corner, register B as a single L node so its corner set is not ordered twice.
An end or wall node must connect to 1 run, a straight or L node to 2, a T node to 3, and an X node to 4.
Select the node type from the confirmed drawing; connection count alone does not establish its angle or structural suitability.
- End and wall nodes: count the respective end-trim or wall-connection set once.
- Straight, L, T and X nodes: check connection counts and avoid duplicating the same shared assembly.
- Duplicate runs: A–B and B–A are the same node pair and are rejected.
- Drawing reconciliation: physical overlap entered under different IDs cannot be detected without coordinates.
Correct unused nodes, missing endpoint references, self-loops and mismatched connection counts before using the result.
Shared-component counting is meaningful only when the IDs correspond to the actual locations on the plan.
Position door and window frames within the run
Opening position is measured from the original run start to the beginning of the frame.
It is not measured again from the point remaining after the start allowance is deducted.
Enter the full occupied width of the frame and confirmed surrounding components, rather than the clear passage width of a door leaf.
This model rejects openings that reach into an end allowance, overlap another opening or touch another opening.
Avoid ordering kit-included jamb posts twice
A door or window kit is a confirmed assembly unit containing its frame and applicable hardware.
If both jamb posts are included, no separate jamb posts are added; if they are excluded, 2 separate jamb posts are counted per opening.
A product with only one included post, or another component arrangement, does not match this both-or-neither model and needs a separate supplier schedule.
Panels above or below a window, mixed-height construction and additional bracing are not added automatically.
How standard panels and residual gaps are calculated
After end allowances and occupied openings are removed, each continuous panel space forms a bay.
The spaces on opposite sides of a door are separate bays; their lengths cannot be pooled to fit another panel.
For bay length L, effective panel width w and additional inline connector width j, the calculation is:
Standard panel count n = floor((L + j) / (w + j))
Occupied width = n × w + max(n − 1, 0) × j
Residual gap = L − occupied width
Inline connectors within the bay = max(n − 1, 0)
If no standard panel fits, the panel and internal connector counts are 0 and the entire bay length remains as a gap.
Connector sets at separately registered straight nodes are added to the internal bay connectors.
Decimal-mm inputs are supported, but displayed digits do not make a site measurement more precise.
A residual gap is not an instruction to round up another panel or cut material on site.
Worked example: three bays that fit exactly
Use an illustrative effective panel width of 600 mm, inline connector width of 20 mm and tolerance of 0 mm.
A and C are end nodes, and B is a shared L corner.
Run A–B is 3,440 mm and run B–C is 1,320 mm, with 50 mm deducted at both ends of each run.
A–B contains one 900 mm occupied door opening beginning 1,270 mm from its original start, with both jamb posts included in the door kit.
Layout and bill of materials
The two sides of the A–B opening and the B–C run each form a 1,220 mm bay.
Each fits 2 panels and 1 inline connector exactly.
The required quantities are 6 panels, 3 internal inline connectors, 1 L set, 2 end sets and 1 door kit.
Separate jamb posts are 0 and all three residual gaps are 0 mm.
Confirmed quote and preparation amount
Assume per-unit prices of KRW 100,000 for a panel, 10,000 for an inline connector, 20,000 for an L set, 5,000 for an end set and 200,000 for a door kit.
Materials total KRW 860,000.
Installation of KRW 100,000 and delivery of KRW 50,000 bring the confirmed preparation amount to KRW 1,010,000.
Every dimension and price in this example is fictional, not a market average or recommended specification.
Pack sizes and MOQ change the order quantity
Required quantity comes from the layout; order quantity reflects the sales pack and minimum order quantity, MOQ.
For a required item, take the larger of required quantity and MOQ and round it up to a whole pack.
An item with required quantity 0 has order quantity 0 even when a MOQ is entered.
Order quantity = ceil(max(required quantity, MOQ) / pack size) × pack size
Surplus quantity = order quantity − required quantity
Line amount = order quantity × per-unit price, rounded to a whole KRW
If panels in the example are sold only in packs of 4 with MOQ 0, the order becomes 8 panels instead of 6.
There are 2 surplus panels; materials become KRW 1,060,000 and the preparation amount including installation and delivery becomes KRW 1,210,000.
Enter a per-unit price, not a whole-pack price.
Do not combine panels with different heights, finishes, colors or product codes to satisfy one pack size or MOQ.
Keep unresolved gaps and missing prices visible
The same panel count can still leave the order incomplete
Change A–B to 3,500 mm, the door start to 1,290 mm, and B–C to 1,340 mm.
The bays become 1,240, 1,260 and 1,240 mm.
The standard panel count remains 6, but the residual gaps are 20, 40 and 20 mm, all above the entered 0 mm tolerance.
The standard-panel schedule and confirmed subtotal are provisional: parts or custom panels for the gaps, and their prices, are not included.
Ask the supplier to confirm order dimensions and permitted component combinations.
A blank price means unknown; 0 means confirmed free or included elsewhere.
When a required item, installation or delivery is unpriced, the confirmed subtotal includes only known amounts and must not be read as the final total.
An unpriced item with no required quantity does not add a purchase cost.
Use one currency and one tax basis for all quotes; the calculator does not apply VAT automatically.
From product inputs to supplier reconciliation
- Enter product dimensions: use the same measurement convention for effective width, inline connectors and confirmed tolerance.
- Register nodes and runs: use one ID per location and enter its type, gross lengths and end allowances from the drawing.
- Add openings: measure from each original run start and confirm the occupied frame width and jamb-post inclusion.
- Normalize the quote: enter per-unit prices, pack sizes, MOQ, and installation and delivery amounts on the same basis.
- Review results: read residual gaps and hold reasons first, then required, ordered and surplus quantities.
- Reconcile before ordering: save the TXT report or print the result and confirm codes, quantities and omitted parts with the installer.
The sample lets you inspect a fictional product and plan, then return to your previous inputs to continue editing.
Replace all sample dimensions and prices with confirmed documents before using the result for a real order.
The confirmation checklist is a record inside the calculator; it does not sign a contract, send an order or approve installation.
Practical uses and model limits
Separate a small office meeting area
Reconcile straight runs, one L corner and an entrance together.
Check whether shared corner sets and end trims are included, rather than relying only on an area-based quote.
Connect several shop zones
Represent each T or X junction with one shared node to avoid adding the same post for every run.
The installer must still confirm actual angles, supports and bracing.
The model covers one product, one height and one effective standard panel width.
Each part type pools one identical SKU, price, pack and MOQ; use separate schedules when door or window dimensions or connector types require different SKUs.
It does not optimize mixed widths or automatically calculate irregular angles, height changes, panels above or below windows, wiring, site-cut glass or additional bracing.
It does not determine fire, sound, escape-route, structural or permit compliance, or landlord approval.
A gap within the entered tolerance does not certify that the layout is safe or can be installed.
Frequently asked questions
What if the panel module already includes the connector?
Use the supplier’s measurement convention for any additional connector allowance.
Check the assembly drawing to prevent double deduction or double addition.
Should I add a corner post for every run?
Use the same node for the same location.
Shared L, T and X nodes are counted once, while allowances are entered separately for each adjoining run.
Will ordering one more panel resolve a residual gap?
Not automatically.
An extra standard panel does not fit a smaller space, so ask the supplier about custom dimensions, a separate filler or permitted cutting.
Can I enter only the door-leaf width?
Use the actual occupied width including the frame and confirmed surrounding components.
Clear passage width and ordering width serve different purposes.
What if the door kit includes posts?
Select both jamb posts included to avoid adding separate posts.
A kit with only one post or another arrangement requires a separate supplier schedule.
Can I use zero for a price I do not know?
Leave it blank to retain an unknown price.
Use zero only for a confirmed free or included item, and do not interpret the confirmed subtotal as the final total.
Can I register the same run in the reverse direction?
A–B and B–A are the same node pair and are rejected as duplicates.
Physical overlap recorded under different IDs still requires drawing reconciliation.
Does the result cover the entire renovation budget?
It covers the entered partition schedule and confirmed quotes.
Check other trades, omitted bracing, gap treatment and contract terms separately, alongside the overall fit-out cash flow.
Sources and update checks
Product-source review date: 2026-11-28.
Allsteel’s official resource listing, Optimize product page, and the index for page 73 of its official 2026 specification guide distinguish inline, L, T and X connection components.
These resources explain component categories; they do not establish universal dimensions, pack sizes, included parts or prices.
Use the specification and supplier-confirmed schedule for the actual product being ordered.
Recheck effective widths, allowances, tolerances, frame footprints, kit contents, pack sizes and MOQ when the product or contract version changes.
Current supplier quotes govern prices and the installation and delivery scope.
This is a quantity and user-quote calculator, not a statutory tax calculation.
Check the order schedule against the drawing
Start with panel counts and residual gaps, then compare required, ordered and surplus quantities for each item.
Resolve unknown prices and out-of-tolerance gaps before confirming the order.
Attach product codes and the original plan to the saved TXT report or printed result so the installer can identify which location and component need checking.
Return to partition dimensions and runs