What belongs in an actual aerial filming quote?
The same number of filming hours can produce different bills when locations, mobilizations, editing deliverables and usage rights differ.
A single package price can hide the cost of another site visit or a required deliverable outside the package.
This calculator records the amounts in your supplier’s actual quote by location and separates known prices from conditions that still need confirmation.
Use it when budgeting for a small business promotion, a family event or filming across several branches.
For locations and schedules reviewed by a professional, record filming sessions, initial mobilization, editing deliverables, usage rights, weather redispatch, weather reshoot sessions and rescheduling fees separately.
All monetary inputs and outputs use KRW, including the English page; the tool does not supply market prices or convert currencies.
Your next decision
Send the location ledger and unanswered questions to the supplier, then agree on the filming contract, delivery specification and backup schedule.
The result is arithmetic using your entries; it does not determine flight permission, operational safety, lawful rights or the legal effect of a contract.
Build the location ledger step by step
- Enter the location name and package base amount.
Add another location when spending needs to be tracked separately, even if the supplier is the same; enter an explicit zero only after confirming there is no base charge.
- Choose the inclusion state for filming sessions and initial mobilization.
For separate charges, copy the quantity, quantity already included, billing increment and unit price using the units in the quote.
- Check editing, rights and weather-related charges.
Record the required video length, final selected files, original-file handover, usage channels and duration, and the terms of the backup schedule.
- Check tax treatment and the quote acceptance, effective and expiry dates.
Record the professional’s filming-feasibility confirmation and your review of deliverables, rights and weather terms before saving or printing the result.
The ledger supports up to 8 locations and preserves each location’s values when you switch between them.
This keeps one location’s session price separate from another location’s mobilization charge.
Loading the fictional example preserves your previous entries for restoration; its amounts are not a quote from an actual supplier.
Unknown, included, separate, unnecessary and excluded
Included or confirmed unnecessary
Included means the package base amount already covers the work, so its additional charge is zero.
Confirmed unnecessary means you have established that the current assignment does not require the work.
Both produce zero additional cost, but they describe different delivery obligations.
Unknown or required but excluded
Unknown means provision or price has not been checked; it is not a free service.
Required but excluded means a needed deliverable or right is outside the quote.
Keep that omission visible and request a supplementary quote instead of treating the missing price as zero or confirming the total.
Separate activates quantity and unit-price calculation.
Choose included when the whole task is already in the package; when only part of the quantity is covered, use a separate line and enter that part as the included quantity.
For 3 sessions with 1 session included, only the 2 excess sessions are charged.
Writing a note without changing an unknown state does not complete its price confirmation.
Quantity, billing increments and rounding
Separate-charge formulas
Billed quantity = ceil(max(quantity − included quantity, 0) / increment) × increment
Separate charge = billed quantity × unit price
Location total = round((package base + sum of separate charges) × tax factor)
The billing increment determines the blocks in which excess work is charged.
A contract billing in whole hours rounds a short excess period up to that block; a contract billing in half-hours needs an increment of 0.5 hours.
Establish whether the supplier’s session means a flight, an on-site period or a filming block, then match the quoted unit.
Hours accept up to two decimal places; sessions, visits, files and items use whole-number quantities.
The increment must be positive, with a minimum of 0.01 hours or 1 for the other units.
Quantities are calculated on an integer scale to avoid charging an extra block because of binary floating-point noise, such as 0.3 hours minus 0.2 included hours billed in 0.1-hour blocks.
When the excess quantity is zero, the extra cost is zero even without a unit price; missing quantities themselves still prevent completion.
Individual separate charges are not first rounded to whole won.
The location’s tax factor is applied to its combined base and separate charges, and the final location amount is rounded once to the KRW minimum unit of one won.
The project total sums the rounded location totals.
If your contract uses a different intermediate-rounding method, compare the invoice and ask the supplier to explain the difference.
Editing delivery and usage rights need separate checks
Completion of filming does not establish that every original or edited file is available for every intended use.
Record final video length, selected-file count, color work, subtitles, aspect ratio, file format, revision scope and delivery date.
Final delivered files are different from the total files captured during filming.
Reflect included editing and additional requested editing in the quoted quantities rather than assuming they are the same service.
For usage rights, record channels such as your website, organic social posts, paid advertising or print, together with the permitted duration.
Original-file handover and transfer of intellectual property are separate matters; check any consent needed for third-party use or resale.
A rights fee included in the package still needs an agreed usage scope.
If a required permission is absent, mark it required but excluded even when the listed monetary price is attractive.
Weather redispatch, reshoot sessions and change fees
Redispatch
The additional cost of returning to the location because of weather.
Check whether the initial mobilization already includes a backup-date visit.
Reshoot sessions
The additional filming work performed on the backup date.
Avoid adding it again if the quoted redispatch charge already covers that filming.
Rescheduling fee
A separately agreed amount triggered by changing or cancelling a booking.
Record the notice timing and the circumstances in which it applies.
These are independent charges; confirmation of one does not establish that the others are free.
If a weather backup scenario is outside your current budget, mark it confirmed unnecessary; if a free replacement is agreed, record what that inclusion covers.
The quantities are your chosen scenario, not a forecast of weather probability or actual flying conditions.
Check alternative dates, site-access hours and revised delivery deadlines so the budget supports a practical scheduling decision.
Tax treatment and the quote validity period
Select tax included, tax added, confirmed exempt or unknown for each location.
Only tax added uses the rate you confirm from the contract; the tool does not impose 10% on every transaction.
Tax included treats entered amounts as final payable amounts and does not add tax again; confirmed exempt records your confirmation rather than determining exemption eligibility.
One location’s base and separate charges share the same tax treatment, so split mixed treatment into separate ledger entries.
The effective and expiry dates define the period against which quote acceptance is checked.
The required order is effective date ≤ acceptance date ≤ expiry date; a reversed period or acceptance outside it keeps the confirmed total pending.
The filming date is a separate schedule record and is not automatically required to fall before quote expiry.
If prices or seasonal terms change between acceptance and filming, record that condition and confirm it with the supplier.
Worked fictional quote: KRW 773,000 across two locations
Location 1: KRW 473,000
- Package base: KRW 200,000
- 3 sessions with 1 included: 2 × 50,000 = KRW 100,000
- Initial mobilization: 1 × 30,000 = KRW 30,000
- Edited deliverables: 2 files × 10,000 = KRW 20,000
- Usage rights included; rescheduling fee confirmed unnecessary
- Weather redispatch: KRW 30,000; weather reshoot: KRW 50,000
KRW 430,000 × the fictional contract tax factor of 1.10 = KRW 473,000.
Location 2 and the project
Location 2 has a fictional KRW 300,000 base covering every item, with tax already included.
No extra amount is added, giving a location total of KRW 300,000.
The calculated project price is therefore 473,000 + 300,000 = KRW 773,000.
The example supplies prices but does not attest professional filming feasibility or your review of contractual scope.
Those confirmations start as unknown, so the confirmed total remains pending until you check the actual terms.
These amounts and the 10% rate are fictional inputs for checking arithmetic, not Korean aerial-filming market prices or a statement of statutory tax rates.
Replace the example’s weather charges and states with the conditions in your own contract.
Known subtotal, calculated price and confirmed total
The known subtotal adds only the base and separate charges currently known.
It excludes the unknown price of missing work or excluded deliverables and is neither a maximum-spending estimate nor a complete contract total.
Known tax treatment is applied to known amounts; unknown tax treatment does not establish a tax-inclusive total.
Use the outstanding questions to complete the monetary entries first.
The calculated price appears when the required prices and tax treatment can be calculated.
The confirmed total additionally depends on missing or excluded work, the acceptance validity period, professional filming-feasibility confirmation and the review of delivery, rights and weather conditions.
This reflects your recorded confirmations; it does not issue a supplier invoice or legal guarantee.
When a price appears while confirmation is pending, review the unresolved conditions rather than repeatedly entering the same price.
Test a filming-price sensitivity scenario
Sensitivity changes only separately charged filming-session and weather-reshoot-session unit prices by your chosen percentage.
Base amounts, mobilization, editing, rights, rescheduling fees, quantities and tax treatment remain fixed.
Hidden prices in included lines are not reintroduced, and a complete project sensitivity is unavailable when required prices remain unknown.
The example at ±10%
Changing the KRW 100,000 separate filming cost and KRW 50,000 weather-reshoot cost by ±10% changes the amount before tax by ±KRW 15,000.
With the fictional 1.10 tax factor, the project ranges from KRW 756,500 to KRW 789,500.
This is a chosen price scenario, not a prediction of market movement, weather probability or a guaranteed range the supplier must honor.
Practical checks before saving or printing
- Match the quote’s sessions, visits, files, hours or items to the ledger.
Ask whether site surveys, travel, accommodation, assistants or special equipment are already covered when those costs are not otherwise represented.
- Record original versus edited files, duration, resolution, revision scope, delivery date, usage channels and permitted duration.
Equal prices do not establish equal deliverables.
- Check initial mobilization, weather redispatch, additional filming and rescheduling fees independently.
Keep backup-date access hours and contact details with your scheduling records.
- Check whether unknown states or excluded items remain in the saved text or printed ledger.
Use the report to ask questions and keep the original quote, contract, invoice and permission records separately.
Returning to an earlier step or changing a location updates the results from the current values.
Clearing an amount creates a blank, not a confirmed zero; record free or included work explicitly.
A family member or colleague can help enter information, while the actual contract owner should review the supplier’s scope and professional confirmations.
Frequently asked questions
1. Are filming hours alone enough to build an aerial filming quote?
You also need locations, mobilization, the quoted billing unit, editing, rights and weather-backup terms.
When only hours are known, use the known subtotal and outstanding questions rather than treating the price as complete.
2. Should an unknown item be entered as zero?
No.
Leave unverified prices blank or keep their state unknown so omissions remain visible.
After checking that an item is free, included or unnecessary, record its state or an explicit zero.
3. What if a package includes only some sessions?
Choose a separate line and enter both total and included quantities.
Only excess quantity is rounded to the contractual billing increment and multiplied by the unit price, avoiding double-counting the sessions covered by the base.
4. Does rain automatically waive redispatch and reshoot costs?
No automatic waiver is assumed.
Check redispatch, reshoot sessions and rescheduling fees separately, including triggers, notice timing and backup dates.
The calculator does not determine weather or flight feasibility.
5. Is 10% VAT added to every location?
Only tax-added entries use the rate you confirm.
Tax is not added again to tax-inclusive amounts, and exemption must also be confirmed by you.
The example’s 10% is a fictional contractual input, not a statutory-rate determination.
6. Must filming take place before quote expiry?
The validity period is compared with quote acceptance.
The filming date is recorded separately, without automatically requiring completion before expiry.
Ask the supplier about any additional contractual scheduling restriction.
7. Why can KRW 773,000 appear while the confirmed total is pending?
Price calculation and contractual review are separate checks.
The fictional example does not automatically attest filming feasibility or scope review.
Check unknown and excluded items, validity dates and each location’s confirmations against actual evidence.
8. How should I use the sensitivity range and saved report?
Sensitivity is a budget assumption changing only separately charged filming and weather-reshoot prices.
The saved or printed ledger helps discuss quantities, inclusions, tax, unresolved conditions and backup dates.
It is not a future-price guarantee or proof of flight permission.
Sources and items to recheck
Source verification date: 2026-11-24; contract-arithmetic reference year: 2026.
KD Drones Filming Agreement, Version 1, March 2025, informs the separation of locations, schedules, fees, deliverables, additional editing and usage permissions.
It is an English supplier’s contract and is not used as Korean statutory pricing or a universal contractual standard.
Its individual 24-hour, 30% and two-revision provisions are not calculator defaults.
Session, mobilization and weather prices must come from your own contract; no fixed market rate is supplied.
Recheck actual prices, tax, units, inclusions, delivery and rights, weather alternatives and validity for every booking, and account for changes in the supplier’s published scope.
Start with the first location in your actual quote
Enter the location name and package base, then review each required item.
Unknown states can organize your questions even before every price is available.
Save the ledger once filming, mobilization, editing, rights and weather terms match your intended assignment, and use it when agreeing on the final contract and backup schedule.