Work Environment Sampling & Lab Quote Calculator

Check sampling, analysis and included fees from an institution-confirmed site plan and actual Korean quotes.

KRW · enter institution-confirmed scope

Samples by site, process and shift

This is the total quantity for this group. Do not multiply by shifts again. Distinguish media, methods or sampling periods in the process identifier.

Confirm the scope, then enter a separate price if needed.

Analyte ledger

Several analytes may share a physical sample. They increase analysis count, not sample count. Remove every analysis row for direct measurement without laboratory analysis.

Analysis 1

Confirm the scope, then enter a separate price if needed.

Korea-based 2026 planning · official sources checked 2026-11-22. Act Article 125, Rule Articles 186 / 189 and Annex 21, and Notice Article 44 establish the scope. Every price and quantity must come from the institution.

Related calculators

A workplace monitoring quote needs a scope check

A visit fee alone may omit sampling, substance analysis, or reporting charges.
Painting and grinding processes, or day and night shifts at the same site, can have different monitoring scopes confirmed by the measurement institution.
This calculator helps business owners, occupational health staff, and purchasing teams reconcile an actual quote against the institution’s preliminary survey and sampling plan.

Start with the site name, then record sample groups by site, process, and shift.
Keep physical samples separate from the number of substance analyses.
Once the scope, prices, and dates are confirmed, read the payable order total and take the saved review sheet back to the institution to agree on scope and delivery.
This is a Korea-based 2026 quote review tool in KRW; example prices are fictional and are neither market averages nor statutory tariffs.

Documents to prepare and the decision to make

Prepare the source documents

Use the institution’s preliminary survey, process and shift sampling plan, analysis list with media and methods, and written visit, reporting, and tax conditions.
Also check the institution name, planned order date, measurement date, report delivery date, and quote validity date.

Confirm the order amount

Identify the amount payable for the stated scope, unresolved charges, and potential overlap between package inclusions and separate fees.
Send the sample and analysis ledger to the institution to confirm quantities, inclusions, additional remeasurement conditions, and delivery before ordering.

The calculator supports up to 6 sample groups for one institution under a common contract basis.
It does not automatically select the cheapest institution.
A special health examination budget counts people and examinations, while this ledger counts workplace samples and substance analyses; employee examination headcounts are not sampling quantities.

Why 6 samples can produce 10 analyses

Physical sample count

This is the number of physical samples to be collected in a group.
A shift label identifies scope; it does not multiply the entered quantity again.
Where the same site, process, and shift use different media or methods, identify the difference in the names so separate groups are understandable.

Analysis count by substance

Enter how many samples in the group actually undergo that substance analysis.
Testing all 4 samples for both toluene and xylene produces 8 analyses from 4 physical samples.
Do not assume every substance is analysed in every sample: use the institution’s confirmed quantity for each line.

Each group supports up to 8 analysis items.
One analysis line cannot exceed its group’s physical sample count, but the combined analysis count can exceed the total samples because several substances may be analysed.
For a direct measurement with no separate laboratory analysis, such as an institution-confirmed noise measurement scope, remove all analysis rows to explicitly record 0 analyses.
Check whether its direct measurement charge is covered by the visit/package amount or by the separately quoted sampling charge.

Included, separate, and unconfirmed charges

  • Included: the charge is already covered by the visit/package amount.
    The relevant sampling, analysis, or reporting line adds KRW 0, but the institution must confirm that the package covers the required items and quantities.
  • Separate: the calculator adds quantity multiplied by the actual quoted unit price.
    An explicitly confirmed free unit price of 0 is valid and differs from a blank price.
  • Unconfirmed: the charging arrangement remains unresolved.
    The item stays on the unresolved list and holds the final order total even when some charges are known.

Repeated analysis names within one group are flagged after whitespace and English case are normalised.
The tool does not silently delete a row or declare the total complete by counting a duplicate once: reconcile the source quote and correct the ledger.
If a substance legitimately has separate media or analysis methods, identify those differences in its item name.
The same substance in a different shift can represent a different sampling scope and should remain in its shift’s ledger.

Use a common monetary and tax basis

Select tax included, tax separate, tax exempt, or unconfirmed from the actual quote.
For separate tax, enter the confirmed rate yourself.
For included tax, the entered subtotal is already the payable amount; the tool does not reverse-calculate a pre-tax supply amount.
Tax exemption is also a user-confirmed contract condition, not an eligibility finding.
If analysis prices include tax but visit prices exclude it, ask for a quote restated on one common basis before combining them.

The example’s 10% is an entered assumption

The 10% below is a fictional contract input used to check arithmetic.
The calculator does not impose 10% on every workplace measurement transaction or determine tax exemption.
A confirmed separate rate of 0% differs from a missing rate.
Unconfirmed tax holds the final payable total even when the known base subtotal can already be shown.

Order, measurement, reporting, and validity dates

The planned order date must be on or before the quote validity date.
Measurement must be on or after the order date, and report delivery must be on or after measurement.
An impossible calendar date or reversed sequence requires correction before the final order total is confirmed.
These checks identify inconsistencies in entered dates; they do not determine legal contract validity or compliance with statutory reporting deadlines.

A supplier’s report delivery date is not automatically the statutory filing deadline.
Confirm analysis time, additional information requests, holidays, and the actual sample handover date separately.
When the quote expires or a process, substance, or shift changes, obtain an updated scope and price rather than simply changing the dates while keeping an old unit price.

Order total formulas and rounding

Quantity-dependent charges

Sampling cost = Σ(separately charged samples × sampling unit price)
Analysis cost = Σ(separately charged analyses × analysis unit price)
Included rows add KRW 0.
An unconfirmed row is not a confirmed zero.

Subtotal and payable amount

Base subtotal = visits × visit fee + sampling + analysis + separate reporting/other fee
Separate-tax payable = round(base subtotal × (1 + tax rate ÷ 100))
Included-tax or exempt payable = round(base subtotal)
Round the final amount to whole KRW rather than rounding each intermediate amount upward.

A supplier using intermediate rounding or minimum billing units may produce a different quote.
Request an itemisation with those units explained rather than forcing the source document to match this model.
Switching a row to included may preserve its previously entered separate price for later editing, but that stored draft price is not added to the total.
After editing, check that the selected charging states and the result breakdown agree.

Worked example: 6 samples, 10 analyses, KRW 484,000

Site A’s day-shift painting process has 4 physical samples with 4 toluene analyses and 4 xylene analyses; xylene analysis is included in the package.
Site B’s night-shift grinding process has 2 physical samples and 2 dust analyses.
The totals are therefore 6 samples and 10 analyses, counting included analyses in the workload.
Every quantity and price below is fictional, for arithmetic verification rather than statutory minimums or suggested market prices.

Fictional two-site workplace measurement quote and tax calculation in KRW
ItemCalculation and inclusionAdded KRW
Visit fee2 visits × 100,000200,000
A sampling4 samples × 10,00040,000
A toluene4 analyses × 20,00080,000
A xylene4 analyses · package included0
B sampling2 samples × 15,00030,000
B dust2 analyses × 30,00060,000
Reporting/otherSeparate30,000
Base subtotalBefore entered tax440,000
Entered taxSeparate 10% assumption44,000
Order total440,000 + 44,000484,000

Complete the three stages and read the review sheet

  1. Start the sampling plan with the site name, then the process, shift, confirmed sample count, and sampling charge state.
    Add groups for other sites or shifts.
  2. Copy the actual count, inclusion state, and separate unit price for each substance analysis.
    Keep included analyses in the workload ledger and mark only their fee as included.
  3. Enter the institution, contract dates, visits and visit fee, reporting/other fee, and tax conditions.
    If the remeasurement scenario is enabled, enter its additional quote on the same monetary basis.
  4. Confirm scope, physical samples, analysis items, and included quantities with the institution before marking them checked.
    Do not confirm information that has not been reconciled.
  5. Read the order total or hold reasons first, followed by the sample plan, analysis ledger, and cost breakdown.
    Save the review sheet and ask the institution to confirm omissions and delivery.

Values remain available when moving between stages, so return from the results to edit the sampling plan or quote conditions.
When loading the worked example, check the example indicator and use restore to return to your previous values, stage, and selected group.
Before saving or ordering, verify the institution and quantities so the sample scenario is not mistaken for your own quote.

A known subtotal can coexist with a held final total

A blank means information is still missing; an entered zero is an explicitly confirmed value where zero is allowed.
Each sample group needs at least 1 physical sample, while a direct measurement without laboratory work is recorded by removing all analysis rows for 0 analyses.
A blank separate price is not converted into a confirmed free charge.
Known visit or analysis charges can appear in the subtotal while required prices or charging states remain unresolved, but that subtotal is not a final order budget.

Turn hold reasons into questions

Check analysis counts exceeding the group sample count, repeated analysis names, duplicate site/process/shift groups, unresolved tax, expired quote validity, and inconsistent dates against the source documents.
Unconfirmed institutional scope also prevents final confirmation.
Clearing a hold means the entered documents are complete for this model; it is not certification of legal compliance.

±20% price sensitivity and additional remeasurement

Change prices, keep quantities fixed

Sensitivity changes only separate sampling and analysis charges by the entered percentage.
Visit and reporting fees, included rows, physical samples, and analysis counts stay fixed.
The example has KRW 210,000 of variable charges; ±20% with the same tax basis produces payable totals from KRW 437,800 to KRW 530,200.
This is not a market confidence interval, price ceiling, or recommendation to reduce sampling.

Conditional remeasurement

Enable the scenario and enter the institution’s additional remeasurement quote on the same tax basis as the initial order.
The scenario shows the combined payable amount if that condition occurs, separately from the base order.
In the example, an additional pre-tax KRW 100,000 produces a conditional total of KRW 594,000.
It is not automatically charged on top of the base KRW 484,000 order.

Confirm whether remeasurement is needed, its scope, and whether the added price covers revisits and repeat analyses.
An unresolved additional quote is not a confirmed scenario budget.
Neither sensitivity nor an extra-price entry determines statutory follow-up duties after a process change or an exposure-limit exceedance.

Practical review situations

Adding a manufacturing night shift

Check whether the existing day-shift quote covers night work and separate the shift groups.
A change in operating hours and a change in the actual sample count are different conditions; enter only quantities confirmed by the institution.
Also confirm the visit fee basis if night work attracts an extra charge.

Several solvents in a painting process

When multiple substances are bundled in a package, reconcile included and separate states to avoid adding both the package and every individual substance price.
Retain the institution’s item names and method distinctions instead of abbreviating different substances into one entry.

Ordering for several sites together

Keep each site’s samples and analyses visible while checking how many common visits and reports are charged.
Obtain a common-basis quote before combining different tax treatments or billing units.
For contracts beyond the supported 6 groups, reconcile the remaining scope using the institution’s full ledger.

Limits and checks before using a result

  • A qualified institution must confirm monitoring obligations, exemptions, statutory minimum sampling, frequency, collection media, and analysis methods using the preliminary survey and current Korean rules.
    Input limits in this tool are software limits, not legal allowances.
  • Whether analyses can share samples and what storage, transport, and analytical conditions are valid depend on the substance and method.
    Do not merge samples or omit unconfirmed analysis scope merely to lower the price.
  • Enter whole KRW amounts and whole-number counts.
    Correct negative values, fractional counts, and out-of-range entries before relying on the result, and check the institution name and dates against the source document.
  • A cheaper total with missing processes or reporting scope is not an equivalent quote.
    Confirmation checkboxes record the user’s document review; they do not certify institution qualifications or legal compliance.

Frequently asked questions

Does this determine whether monitoring is mandatory?

It prices a scope confirmed by the institution; confirm coverage and exemptions with the institution using Article 186 and Annex 21 of the Enforcement Rule and the actual working conditions.

Can employee count determine the sample count?

Sampling depends on the unit workplace, exposure, and measurement method as well as employee count, so the tool uses the institution’s confirmed sampling plan rather than recommending a quantity.

Is it an error when analyses outnumber samples?

Total analyses may exceed samples when several substances are analysed, but one substance line cannot exceed its group’s sample count and separate media or methods must be identified as separate scope.

How do I enter a measurement with no laboratory analysis?

After confirming the institution’s itemisation has no separate laboratory work, remove all analysis rows to show 0 analyses and confirm how the direct measurement charge is included or separately priced.

Does an old separate price still count after selecting included?

A separate draft price may be preserved for editing, but an included row adds no fee; confirm that the package actually covers that substance and quantity.

Is the tax rate always 10%?

Enter the quote’s included, separate, or exempt treatment and any confirmed separate rate yourself; the example’s 10% is an arithmetic assumption rather than a universal transaction rule.

Can the ±20% range be used as a budget cap?

The range changes only separate sampling and analysis unit prices, so it is not a real price cap or a sample-reduction plan; confirm additional visits and remeasurement conditions separately.

Can I place an order using the saved sheet?

The TXT and printed sheet are internal reconciliation records; decide on ordering alongside an institution-confirmed quote covering scope, quantities, included charges, tax, validity, and delivery.

Official sources and the Korea 2026 basis

Official sources were checked on 2026-11-22.
Article 125 of the Occupational Safety and Health Act was checked against the currently effective text dated 2026-10-27, and the Enforcement Rule against its 2026-08-01 edition.
Article 44 of the Notice on Working Environment Measurement and Quality Control, Ministry of Employment and Labor Notice No. 2020-44 effective 2020-01-16, supports keeping physical sample identification and substance analysis details distinct.
These sources support the procedural and recordkeeping context; they do not supply the example prices or tax rate.

The official law API can return a promulgated Act text for law ID 001766 carrying the future effective date 2027-04-28, so the currently effective text was checked separately.
After amendments, recheck the applicable effective edition, Annex 21, collection and analysis methods, and monitoring frequency.
Update institution prices, tax, included quantities, validity, and delivery from the contract being considered rather than treating historical prices as current market rates.

Take the review sheet back to the institution

Save or print the known subtotal, order total, sample count, analysis workload, and unresolved questions.
Using the original quote, confirm which substances share each sample, whether included visit, sampling, and reporting quantities cover the scope, and what the remeasurement conditions and report delivery dates are.
Mark only items actually reconciled; when a process or shift changes, revise both the ledger and quote before proceeding with the order.